Recyclable Standard Aluminum Formwork System
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 150000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
SNTO Aluminum Formwork System Benefits
1. Light weight, high strength
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel. With weight of 26KG/square meter,Aluminum formwork is the lightest formwork for construction, which makes for easy handling, but bearing 60KN/square meter.
2. Various sizes, high accuracy
The design solution is designed with strict structure, with little measurement error and high accuracy, which is very suitable for high rise buildings.
3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.
4. Long time used and recyclable value
With the lowest average lost, aluminum formworks can be used up to 300 times.
5. Wide range used
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.
6. Excellent quality
The concrete surface is very smooth, so it can save the swing cost and shorten the construction period.
7. High Efficiency
According to different climatic conditions, the formworks can be removed in 18-36 hours.
8. Independent props system
The gap between the formwork support is totally enough for passing, moving, and pulling.
9. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
- Q: The difference between the scaffold and the scaffold
- The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Send your message to us
Recyclable Standard Aluminum Formwork System
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 150000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords