• Aluminum Casting Building Formwork For Concrete System 1
  • Aluminum Casting Building Formwork For Concrete System 2
  • Aluminum Casting Building Formwork For Concrete System 3
  • Aluminum Casting Building Formwork For Concrete System 4
  • Aluminum Casting Building Formwork For Concrete System 5
  • Aluminum Casting Building Formwork For Concrete System 6
Aluminum Casting Building Formwork For Concrete

Aluminum Casting Building Formwork For Concrete

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

concrete pouring aluminum formwork system

1. Light weight, high strengthconcrete pouring aluminum formwork system Advantage

 

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

 

2. Various sizes, high accuracy

 

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

 

3. Safe and convenient construction

 

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

 

4. Long time used

 

With the lowest average lost, aluminum formworks can be used up to 300 times.

 

5. Wide range used

 

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

 

6. Excellent quality


The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

 

7. High efficiency

 

According to different climatic conditions, the formworks can be removed in 18-36 hours.

 

8. Recyclable value

 

The used aluminum material is of greater recyclable value,several times higher than steel.

 

9. Independent support system

 

The gap between the formwork support is totally enough for passing, moving and pulling.

 

10. Dependable safety, environmental

 

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth

concrete pouring aluminum formwork system picture

Aluminum Casting Building Formwork For Concrete

Aluminum Casting Building Formwork For Concrete

Aluminum Casting Building Formwork For Concrete

Aluminum Casting Building Formwork For Concrete

 FAQ

1) What is the payment terms in our Company ?

Generally TT, LC At Sight, West Union , Moneygram . Besides , we can accept LC After Sight , DP etc.

2) Packing For Aluminum Formwork.

Nude or Pallet for Big Formwork and the Accessaries in PP bags.

3) Quality Guarantee

We have Strictly Quality-Inspection Department and we also can apply SGS and other Third-Party Agency to check the Products to make sure superior quality .

4) After Sales Service

We can send our engineer and sales manager to your job site for work and installation direction and make training for your workers .

5) Time of Delivery

We can overdo work for the customer to make sure the fast shipment


Q: What is the development prospect of aluminum template design?
More than the number of turnaround, good economy: aluminum alloy template system can be used up to 300 times, each set of template system in a slight improvement can be re-used in the follow-up of new buildings, resulting in long-term low template sharing costs. Aluminum alloy template waste can be fully recycled.
Q: In the Sheng-aluminum template installation workers, how to develop prospects
First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
Q: What is the change in the aluminum template?
Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
Q: Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q: Whether a shear wall aluminum template and wood template can be mixed
Wood molds are low in strength, poor in stability, low profile, low precision, high water loss, high maintenance requirements when the mold surface is released, the time is fixed, the mold time is late and the load capacity is small.
Q: Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords