• Aluminum Formwork system with Scaffolding Support System System 1
  • Aluminum Formwork system with Scaffolding Support System System 2
Aluminum Formwork system with Scaffolding Support System

Aluminum Formwork system with Scaffolding Support System

Ref Price:
$150.00 - 180.00 / m² get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Aluminum Formwork System

Formwork is the term given to either temporary or permanent molds into which concrete or similar materials are poured.

In the context of concrete construction, the falsework supports the shuttering moulds.

 

2. Main Features of Aluminum Formwork System

◆ Lighter weight but high bearing capacity.

◆ Manual transportation can be achieved, greatly reduces the aggregate cost.

◆ Perfect design, excellent produce and well welding make sure the flatness of concrete

surface.

◆ It is with the advantages of standard design, excellent applicability and interchangeable.

◆ Simple, safe and fast.

◆ No rust corrosion, easy maintenance, and high turnover rate.

◆ The formwork series are a complete system with a full set of accessories, and can be

set up flexibly according to project.

 

3.Aluminum Formwork Images

 

 

 

4.Aluminum Formwork Specification

Aluminum Formwork system with Scaffolding Support System

 

5. FAQ of Aluminum Formwork System

1)What promises can be done by us?

If interested in Aluminum Formwork, please feel free to write us for any QUOTE. If printing required, please advise asap because the whole set need much more time to complete. Please DO check goods when courier knocks your door and contact us asap if any issue.

2) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

Aluminum Formwork cost can be refund after order is confirmed. 

If the products are not based on the requirements, there will be the relevant compensations made for you.  

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:

Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Aluminum Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.

Q: What is the development prospect of aluminum template design?
More than the number of turnaround, good economy: aluminum alloy template system can be used up to 300 times, each set of template system in a slight improvement can be re-used in the follow-up of new buildings, resulting in long-term low template sharing costs. Aluminum alloy template waste can be fully recycled.
Q: In the Sheng-aluminum template installation workers, how to develop prospects
Sheng Tong on my feeling is the same as prison, in addition to front-line staff (prisoners), what is the leadership (guards), every day is the workshop, dormitory, dinner time is only half an hour, the company provides working hours if 12 hours, The time to stay in the workshop every day in more than 13 hours, especially hard to force, can not stand the tube, temper a little irritable advice do not go, afraid you can not control their own K
Q: What is the change in the aluminum template?
The turnover of the aluminum template is determined by the use of performance. The use of aluminum template system to improve the overall construction efficiency of the construction industry, including in the building materials, artificial arrangements are greatly saved a lot of aluminum template, also known as aluminum alloy template, is made of aluminum alloy building templates, to solve the traditional The existence of defects in the template, greatly improving the construction efficiency.
Q: Now the domestic use of aluminum template project more?
Traditional template construction cycle is long, dirty, chaotic, noise, resulting in a large number of construction waste, building materials, resource consumption, high labor costs, and the construction quality is difficult to guarantee. Compared to the traditional construction methods, the use of aluminum alloy template floor can be a whole casting molding, flatness and verticality better, smooth surface plastering, and can be reused more than 200 times. This can not only save a lot of manpower, material, but also can be recycled, energy saving and environmental protection, significant economic benefits.
Q: Whether a shear wall aluminum template and wood template can be mixed
The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
Q: Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords