The description of Plastic Geocell for Reforcement treatment for soft soil foundation and steep slope protection highway airport desert mountain and swamp land
Plastic geocell is one new type geosynthetics material, basic sheet is high-molecular polymer, connected by rivets or ultrasonic welded to three-dimensional network structure, unfold it and fill in sand, gravel and clay etc. When used at construction site. According to customer ' s requirement, cut holes or carve arabesquitic in order to increase its lateral permeable ability, also increase the friction and binding force with the foundation material.
Specification of Plastic Geocell for Reforcement treatment for soft soil foundation and steep slope protection highway airport desert mountain and swamp land
TG LG5, TGLG8, TG LGIO, TG LG15, TG LG20 (cm)
Feature or Property of Plastic Geocell for Reforcement treatment for soft soil foundation and steep slope protection highway airport desert mountain and swamp land
I. Retractile, foldable when transportation, pulled to network when construction, fill in the soil, gravel, concrete etc. Loose materials, form one structure with strong lateral limitations andhigh stiffness
2. Material is light, abrasion resistance, chemical properties stable, resist photooxidation aging, acid and alkali resistant, suitable for different soil and soil conditions, such as desert
3. Good lateral restrict and prevent slippery, prevent deformation, effectively enhance the bearing capacity of subgrade and dispersed loads function
4. The geocell height and welding distance etc. Geometric dimensions are all changeable in order to meet the requirements of different projects
5. Capable and easily be expanded or contracted, small size for transportation, easy for connect and construction speed is fast
Application of Plastic Geocell for Reforcement treatment for soft soil foundation and steep slope protection highway airport desert mountain and swamp land
1. Used for the stability of railway roadbed
2. To stabilize the desert highway roadbed
3. Used in the governance of shallow water channel
4. Used for the foundation reinforcement of retaining wall, wharf, levee
5. For the management of desert, beaches and river banks
Production Standard of Plastic Geocell for Reforcement treatment for soft soil foundation and steep slope protection highway airport desert mountain and swamp land
GB/T19274-2003
JT/T 516-2004 < Geosynthetics in highway
Engineering - Geocell
Area |
|
Hydraulic | Lagooning and Water Treatment, Ornamental Ponds, Golf Courses Aquaculture and Desalination Water LagoonsTanks, Reservoirs, Liquid WasteFloating Cover SolutionsDrainage and FiltrationShading Cover Solutions |
Environment | Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers |
Civil Works | Erosion Control, Secondary Containment, Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation. |
Building | Parkings,Roofing,Soundproofing building |
- Q: Slope roof drains do not need to be waterproof
- When installing a waterproof board, when the width of a waterproof board is not enough, to be placed side by side, it should be noted that the gap between the board and the plate will provide potential space for root growth.
- Q: Find the construction steps for waterproof coatings
- 2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
- Q: Waterproof mortar expensive or dry mortar expensive
- Dry mortar is usually called hydraulic cement mixed mortar, refers to the dry sieve treatment of aggregate (such as quartz sand), inorganic cementing materials (such as cement) and additives (such as polymers) and so on a certain proportion of physical mixing Into a granular or powdered, in the form of bags or bulk transported to the site, add water, mix directly after the use of materials.
- Q: Can Henkel have water against him?
- Can ah ~ watered effect on the discount friends are high with the general are good, powder + pulp! Do not need to add water
- Q: Why should the use of high pressure perfusion waterproof plugging method
- Due to uneven settlement of buildings and other factors, resulting in deformation of the building structure cracking, leakage phenomenon, for the repair of this situation, you can use a new foreign plugging construction technology - high pressure grouting waterproof repair technology.
- Q: How can the toilet waterproof works fail?
- After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment. ??????? Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures. ???????? After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list." ??????? Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
- Q: Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
- Second, the completion of the construction of the membrane and the acceptance of qualified, should do the protection of finished products, it is recommended to use cement mortar to do protective layer, construction should pay attention to the surface should be smooth pressure, and set the surface sub-grid, 1 m2. If the use of block material to do the protective layer, the sub-grid area should not be greater than 100 square meters, sub-grid width should not be less than 20mm; if the use of fine stone concrete protective layer, the sub-grid area should not be greater than 36 square meters. Note: Regardless of which protective layer is used, a separation layer should be provided between the waterproofing layer and the protective layer.
- Q: How does the waterproofing membrane work?
- 2, in accordance with the roof slope in the direction of the parallel roof will be placed in the waterproof membrane, and unwound;
- Q: Waterproof material water leakage construction should pay attention to what
- 2, wall treatment · Wall treatment to do about 300mm high waterproof coating, to prevent water infiltration wall back tide. · Bathroom between the wall and the ground (plane and elevation) brushing height should be greater than 100mm. · The height of the shower room in the bathroom is not less than 1800mm. · If there is a bathtub, the height of the wall adjacent to the bathtub should be 300mm higher than that of the bathtub. · Waterproof height of tub is not less than 800mm. · The height of the squat should be more than 900mm. For the transformation of the toilet wall and self-built light wall, the proposed height of the waterproof to do the top.
- Q: Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
- Fourth, for some of the construction of the roof of the cover of Hong Kong leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package. To strengthen the leak-proof effect, you can also shop a layer of waterproofing membrane. ? ???Roof leakage how to deal with five, most of the use of clean up the roof, crack filling, crack sealing, mortar to find equal maintenance methods. Waterproof methods are: membrane waterproof, rigid waterproof, flexible waterproof, waterproof coating and other methods. You can also use the plugging the king is better, for the seepage, slightly dug the slot can be directly plugging the dry powder into the tank, compaction, wiping, sprinkler can be maintained. If the investigation is your home to leak water, the main problem should focus on the surface of the leakage interface and the upper part of the section, it is recommended to find professional leak-proof, it is estimated that it is to spend tens of dollars, if you want to repair it To buy a waterproof paint, (the specific name of a lot to go to that kind of store that they know) and then painted in the floor drain and toilet under the mouth of the water pipe and the upper section can be.
Send your message to us
Plastic Geocell for Reforcement Treatment for Soft Soil Foundation and Steep Slope Protection
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 999 m²
- Supply Capability:
- 280000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords