Perforated Galvanized Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Along with over six decades of quality customer service, It is also involved in numerous organizations that further the betterment of cable tray production and installation.
It is commitment to the bettering of the cable tray and wire management industry is tribute to their long-standing reputation as one of the industry leaders in quality and customer service.
Products Range:
1.Perforated Cable Tray Systems.
2. Cable Ladder systems.
3.Cable Trunking Systems.
4.GRP/FRP Cable Tray Systems.
5.Wire Mesh Cable Tray Systems.
6.Aluminum Cable Tray Systems.
7.Wire Way Systems.
8.Strut Channel Systems.
9.Busbar Systems.
- Q: Due to the environment is not good, the original buried cable damage many times, want to use the bridge, but the overhead conditions are not allowed, the picture below is the hot water pipe, the above is the hot oil pipeline, but also over three doors more
- weak tube, line, slot construction standards and strict implementation of the construction specifications, according to construction drawings, construction manual construction The Without the signature of the general engineer, the project manager agrees and declares to the supervising company, and may not arbitrarily change the construction plan
- Q: What is the use of bridge in electrical wiring? Why use the bridge?
- Point on the pole close to "here not allowed to urinate"
- Q: Power cable in the cable tray is a single layer of laying, or can be stacked together with multi-layer laying?
- 1: hard drive power cord 2: hard disk data cable (CD-ROM data cable) 3: graphics cable cable (if your graphics card is dual 6PIN power supply interface, but your power supply is only a 6PIN power supply interface, then the root switch on the use of ) 4: hard disk data cable (optical drive data cable) 5: hard drive power cord two hard drive power lines were inserted mechanical hard disk and solid state hard drive, two data lines were inserted mechanical hard disk and solid state hard drive, graphics card power supply cable are generally not , Believe that your power supply supports dual 6PIN power supply interface.
- Q: Where is the cable tray used? Fire power plant, coal mine group? For example, civil construction sites, some of the high-rise buildings.
- If you are two of these electrical appliances connected to a line, then the total power of 3200W or so, with 2.5 square feet of copper is enough, the best plug and socket all 16A, especially electric water heater, ground can be used 1.5 lines.
- Q: Our cable tray is the fire bridge each section are connected with copper braided wire grounding, but how to stent the ground? More
- Hello, you must be in the use of non-original charger for charging, usually rush, try to use the original charger for the red, try not to use the USB connection charging or non-original charger for charging, later use Is the key, you can install a Tencent mobile phone housekeeper, each time you will give you the most secure charge of the best quality charge, you can extend to more than 30%, will reduce the CPU frequency, keep the minimum power hope which can help To you, thanks for adoption
- Q: Calculation of bracket for cable tray in electrical shaft
- You can add a little conductive objects in the middle, or direct use of electricity to play an eye, directly to the line through the connection is also OK. Choose your own! wish you happy!
- Q: Electrical engineering bridge; two sets of cable bridge in the same height parallel laying, during which the net distance should be at least the number of centimeters. Thank you hurry
- Please refer to GB electrical installation installation cable construction and acceptance specifications 5.3 cable duct laying 5.3.1 in the following locations, the cable should have a certain mechanical strength of the protective tube or the installation of protective cover: 1 cable into the buildings, tunnels, Through the floor and the walls. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone. 5.3 Laying of cables in cable ducts 5.3.1 In the following locations, the cable shall have a protective tube of mechanical strength or a protective cover: 1 cable into the building, tunnel, through the floor and the wall. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone.
- Q: 5 4 * 95 + 1 * 75 cable should choose what size of the bridge
- 1. Set the cable well 2. Connect with the cable connector 3. Press the hydraulic clamp with the sleeve 4. Heat shrink tubing 5. wrap the high pressure cloth cloth 6. wrap the waterproof cloth
- Q: Seeking: cable tray 100cmx10cm bracket installation spacing requirements
- Installation When the cable tray enters the building from the outside, the slope of the bridge shall not be less than 1/100
- Q: Cable bridge 2 × (300 × 150) is what
- High-voltage cable cable fixture is in accordance with the cable jacket diameter as a benchmark to customize the different size of the cable need to produce different specifications of the cable fixture. The approximate cable size can be fitted with rubber in the same fixture.
1. Manufacturer Overview
Location | Shanghai, China |
Year Established | 2009 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Singapore,Vancouver,Brisbane |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, Spanish |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Perforated Galvanized Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords