Perforated Galvanized Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Along with over six decades of quality customer service, It is also involved in numerous organizations that further the betterment of cable tray production and installation.
It is commitment to the bettering of the cable tray and wire management industry is tribute to their long-standing reputation as one of the industry leaders in quality and customer service.
Products Range:
1.Perforated Cable Tray Systems.
2. Cable Ladder systems.
3.Cable Trunking Systems.
4.GRP/FRP Cable Tray Systems.
5.Wire Mesh Cable Tray Systems.
6.Aluminum Cable Tray Systems.
7.Wire Way Systems.
8.Strut Channel Systems.
9.Busbar Systems.
- Q: It is best to be able to tell me the calculation method, be grateful
- There is a product can solve the office exposed to the ground wire, is a PU material trunking wiring board, can be used to better cloth cable, plug cable, cable, data lines and so on.
- Q: Cable trough, cable tray, cable tray, cable trench difference. These concepts, I have been confused, please heroes help answer, thank you! More
- Z represents the meaning of flame retardant. C on behalf of, generally divided into A, B, C three levels, A level is the highest. YJV22 academic name for the copper core insulated steel tape armored PVC sheathed. Some of the vernacular is: flame retardant C-class armored copper cable
- Q: Where is the cable tray used? Fire power plant, coal mine group? For example, civil construction sites, some of the high-rise buildings.
- If you are two of these electrical appliances connected to a line, then the total power of 3200W or so, with 2.5 square feet of copper is enough, the best plug and socket all 16A, especially electric water heater, ground can be used 1.5 lines.
- Q: Is not the cable bridge, the whole plant laying a flat iron, each layer of equipment to the ground bus to the bridge on the flat iron, rather than on the bridge. Is this the requirement? More
- L on behalf of the positive pole is what we call FireWire, N on behalf of the negative pole is also said that the zero line.
- Q: What is the difference between a fireproof bridge and a fireproof bridge?
- SC new standard annotation, same with the original G, should be the wire tube, (that is, usually said thick-walled wire tube) is marked as RC, pass the original mark The GG is usually said that the water gas pipe
- Q: Can the cable bridge be on the ground?
- See the bridge laying in what place . in the roof of the bridge for the roof of the power supply equipment, you can lay along the ground bridge, but to do drainage and rain. . in the office and other places, due to the need to install the plug, etc., so many buildings in the floor under the overhead layer has laying the bridge, asked to do the equipotential bonding work. Other circumstances, as far as I know there is no laying along the ground
- Q: What is a cable tray? What is the purpose of the cable tray?
- Power Cable External Metal Armor Grounding is to avoid the occurrence of zero sequence current when the housing is live (this can not be used with a single core metal case cable is a reason).
- Q: What is the difference between a fireproof bridge and a galvanized bridge?
- "Wire" means: wire refers to the wire, "tube" refers to the water pipe. "Under the water pipe under the wire" is home improvement in the hydropower project in a jargon. Meaning: water pipe to go the sky, the wires go underground. Explanation: The water pipe is best to take the ceiling, covered with a ceiling, easy to leak when the maintenance; wire through the ground, the cable is not easy to go wrong, take the ground to avoid the water pipe. "Under the water pipe under the wire" can not be misunderstood, in the wall or underground tiled, the water pipe in the wire under the tube. This laying unsafe, this situation to ensure that the wire tube in the water pipe in the next.
- Q: To ask the gods, with cad cable tray design, how to take into account the layers? Is a layer of a painting or a few layers together, how to set the specific color
- It is recommended to use YJV0.6 / 1kV3 * 240 + 1 * 120 cable, according to the data you provide to calculate the pressure drop, the use of this cable can limit the voltage drop of about 5%
- Q: Do not have a very professional, can mark the specific layout, specifications can be
- Phase correction, the first is to prevent parallel lines in the line when the phase short circuit, the second is in the line automatic device action, because the action time is short or the line is longer capacitive, due to different phase, resulting in the lower three-phase electricity Equipment impact
1. Manufacturer Overview
Location | Shanghai, China |
Year Established | 2009 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO9001:2008 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Singapore,Vancouver,Brisbane |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, Spanish |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Perforated Galvanized Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords