Perforated Trough Type Gi Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Along with over six decades of quality customer service, it is also involved in numerous organizations that further the betterment of cable tray production and installation.
it is commitment to the bettering of the cable tray and wire management industry is tribute to their long-standing reputation as one of the industry leaders in quality and customer service.
Products Range:
1.Perforated Cable Tray Systems.
2. Cable Ladder systems.
3.Cable Trunking Systems.
4.GRP/FRP Cable Tray Systems.
5.Wire Mesh Cable Tray Systems.
6.Aluminum Cable Tray Systems.
7.Wire Way Systems.
8.Strut Channel Systems.
9.Busbar Systems.
- Q:How can the most effortless way to put the cable on the bridge
- Do not need, puncture clip is actually a connector, you can connect the two cables conductive, puncture is installed in the cable radial puncture clip, do not need to make the cable head, how to do the trunk, the branch on how to do. Or else invented puncture clip dry Gansha
- Q:Such as: 200 * 100 * 1.5. Ordinary, galvanized and hot galvanized. How is the price calculated? Is there a formula? More
- The problem is too big, find a factory to set the information bar
- Q:Water pipe must go in the bridge below it, which norms have provisions, seeking detailed solution. It is best to tell me the first few chapters.
- People are relatives, the relationship between you and the relationship between the students to go deeper, the same price, quality will not choose your case. Quality, price, brand, person, network, sales strategy, etc., out with the relative comparison of your relatives how much advantage? In these conditions for the person is the most important, say before doing things first person. It is not to find a goal!
- Q:How many meters to make a fixed bracket bracket
- 2.5 square feet of copper enough. 220V10A is 2KW, an ordinary rice cooker electricity.
- Q:Electrical engineering bridge; two sets of cable bridge in the same height parallel laying, during which the net distance should be at least the number of centimeters. Thank you hurry
- Please refer to GB electrical installation installation cable construction and acceptance specifications 5.3 cable duct laying 5.3.1 in the following locations, the cable should have a certain mechanical strength of the protective tube or the installation of protective cover: 1 cable into the buildings, tunnels, Through the floor and the walls. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone. 5.3 Laying of cables in cable ducts 5.3.1 In the following locations, the cable shall have a protective tube of mechanical strength or a protective cover: 1 cable into the building, tunnel, through the floor and the wall. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone.
- Q:Do not have a very professional, can mark the specific layout, specifications can be
- Phase correction, the first is to prevent parallel lines in the line when the phase short circuit, the second is in the line automatic device action, because the action time is short or the line is longer capacitive, due to different phase, resulting in the lower three-phase electricity Equipment impact
- Q:What is the main use of fireproof bridge?
- When installing, install the wire of the power cord or other signal lines to be installed on the wall surface in advance according to the pre-design, and then install the wire.
- Q:In the bridge of the joints with a number of bolt cover fixed, there is a 20 cm long copper wire prepared by the flat, both ends were lap on the bolt. I do not know the role of this with the flat belt? Who knows, please enlighten me, thank you! More
- This can only say "possible"; if you encounter unscrupulous maintenance workers, may be so dry; However, air-conditioning brass as long as the use of its flexibility will become very poor, a little careless will be flat of. Brass tube, the safest way is to replace the brass.
- Q:How the spacing of the hangers of the bridge is determined
- How to determine whether the square of the cable is standard
- Q:How to draw the bridge, can directly pull out the four lines composed of the bridge?
- Option 3: voice point using 100 pairs of 110 patch panels to connect the trunk access line, with a pair of 110- six RJ45 jumpers to the voice points assigned to the six types of 24-port patch panels each RJ45 port (actually only use 2 core), the data points are still using six types of 24-port patch panel normal termination, jumping If the voice trunk uses three types of large logarithmic cable, then the voice part of the jumper can be replaced by three types of jumpers, not so wasted use of six categories; if the voice trunk is also the use of six types of cable, then all Jumper can only use the six types of talent to match the entire system
1. Manufacturer Overview |
|
---|---|
Location | Shanghai, China |
Year Established | 2009 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Singapore,Vancouver,Brisbane |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, Spanish |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Perforated Trough Type Gi Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches