Trough Type Gi Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Along with over six decades of quality customer service, it is also involved in numerous organizations that further the betterment of cable tray production and installation.
It's commitment to the bettering of the cable tray and wire management industry is tribute to their long-standing reputation as one of the industry leaders in quality and customer service.
Products Range:
1.Perforated Cable Tray Systems.
2. Cable Ladder systems.
3.Cable Trunking Systems.
4.GRP/FRP Cable Tray Systems.
5.Wire Mesh Cable Tray Systems.
6.Aluminum Cable Tray Systems.
7.Wire Way Systems.
8.Strut Channel Systems.
9.Busbar Systems.
- Q:It is best to be able to tell me the calculation method, be grateful
- There is a product can solve the office exposed to the ground wire, is a PU material trunking wiring board, can be used to better cloth cable, plug cable, cable, data lines and so on.
- Q:Does the weak and fire can share a cable tray?
- If the drawings do not specify a separate bridge, you can share a bridge, because the fire alarm signal and telephone, broadband belong to the weak system.
- Q:Cable trough, cable tray, cable tray, cable trench difference. These concepts, I have been confused, please heroes help answer, thank you! More
- Z represents the meaning of flame retardant. C on behalf of, generally divided into A, B, C three levels, A level is the highest. YJV22 academic name for the copper core insulated steel tape armored PVC sheathed. Some of the vernacular is: flame retardant C-class armored copper cable
- Q:What is the difference between a trough bridge and a tray tray?
- Upstairs did not understand the meaning of the question. Wire access control box is to set the length of the. The general requirements of the length of the land is not very high, the distribution box is particularly evident, many building distribution boxes are casually put the point line where the spare. Instruments and equipment on the electrical control box is a very high demand. In the line, from the terminal to the outlet hole is generally between the zigzag, tie tie, the length of the reservation line is about 1.5 times the width of the control box (about). This can be convenient after the replacement of components, maintenance and so on. Wiring is not like land with a direct cable access, but there are related technical requirements, such as anti-corrosion, anti-corrosion, and so on.
- Q:Seeking: cable tray 100cmx10cm bracket installation spacing requirements
- Installation When the cable tray enters the building from the outside, the slope of the bridge shall not be less than 1/100
- Q:How does the bridge cover set the budget
- . the bridge installation quota has included the bridge cover, three links and other accessories installation costs, as long as the bridge and cover the main material fee to adjust it. . the board (Entryboard) is printed circuit board CNC drilling used in the upper cover. The main role of the cover plate is to improve the quality of drilling, improve the yield, is printed circuit board CNC drilling process indispensable to a plate. . the bridge is a support and cable the bracket. Bridge is very common in the use of the project, as long as the laying of the cable will use the bridge, cable bridge as a wiring project supporting a project, there is no special specification guide, a manufacturer's specifications program lack of versatility, therefore, design selection The process should be based on the type of weak cable system, the number of reasonable selection of the applicable bridge. Cable bridge with a wide variety, wide application, strength, light structure, low cost, simple construction, flexible wiring, installation standards, beautiful appearance and so on.
- Q:MR-150 * 75 What does it mean? Is the bridge of the electrical?
- Electric fire mainly includes the following four aspects: First, the leakage of electricity The so-called leakage, that is, a line of a place for some reason (natural or man-made reasons, such as wind and rain, wet, high temperature, , Corrosion, etc
- Q:How the bridge slot is connected to the ladder
- And then press the picture in the picture to know the disappearance of the remote control on the marked in the remote control of the lower right corner or lower left corner
- Q:Power cable in the cable tray is a single layer of laying, or can be stacked together with multi-layer laying?
- 1: hard drive power cord 2: hard disk data cable (CD-ROM data cable) 3: graphics cable cable (if your graphics card is dual 6PIN power supply interface, but your power supply is only a 6PIN power supply interface, then the root switch on the use of ) 4: hard disk data cable (optical drive data cable) 5: hard drive power cord two hard drive power lines were inserted mechanical hard disk and solid state hard drive, two data lines were inserted mechanical hard disk and solid state hard drive, graphics card power supply cable are generally not , Believe that your power supply supports dual 6PIN power supply interface.
- Q:What is the minimum distance between the lighting cable bridge and the weak bridge construction?
- 4 * 95 diameter is 42mm that is to say 300 wide bridge can meet your needs now
1. Manufacturer Overview |
|
---|---|
Location | Shanghai, China |
Year Established | 2009 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Singapore,Vancouver,Brisbane |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, Spanish |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Trough Type Gi Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 5000 Metric Tons per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords