• Cable Trunking System 1
Cable Trunking

Cable Trunking

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Meters m
Supply Capability:
200000 Tons per Year m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Features:

 

-- Cable Trunking are easy to install and can be mounted on walls using brackets.

 

-- Used for underfloor, concealed systems.

 

-- Cable trunking with cover sections to prevent ingress of dust and liquids.

 

-- Cable Trunking, Cable Trunking Size, Cable Trunking System

 

 

Specification:

 

Thickness: 0.6mm -2.5mm (12 - 25Gauge)

 

Height: 50mm - 300mm

 

Width: 100mm - 1000mm

 

Finished: Pre-galvanized (Z80 - Z275), Powder coating, HDG

 

 

Cable Trunking, Cable Trunking Size, Cable Trunking System

 

Range

Height

Width

Thickness

Light Duty Cable Tray

15-20

50-900

0.8-2.0

Medium Duty Cable Tray

25

50-900

1.0-2.0

Heavy Duty Cable Tray

≥35

50-900

1.0-2.0

 

Q: What is the meaning of "cable tray: 200 * 100 middle strip" in electrical engineering
200mm wide, 100 high, the middle partition is divided into two halves. Cable bridge is divided into trough, tray and ladder-type, mesh and other structures, by the bracket, arm and installation accessories and other components. The inner frame of the building can be set up independently or attached to various structures and corridors. It should be characterized by simple structure, beautiful appearance, flexible configuration and convenient maintenance. All parts are galvanized. , Installed in the building outside the bridge
Q: What is the difference between a trunking and a bridge in a weak construction?
You are not just to participate in the construction of the work, for the electrical construction to have a certain degree of expertise and related requirements, if you write a detailed request, there are several pages of A4 paper. Not just a straight line of protection tube, there are 90 degrees turn the tube laying. The connection between the tube and the tube, and so on to be used.
Q: What is the national standard of the thickness of the bridge?
Control cable is not high voltage, the maximum voltage level 0.6 / 1kV, are generally 450 / 750V
Q: Whether it can be in the bridge under a layer of 60mm polystyrene board, at home 20mm asbestos insulation, insulation layer wide out of the edge of the bridge 200mm? The The Hurriedly ... can you? More
Your description is not detailed enough to cause such a problem for many reasons, no response is the computer host can not open or computer host can open but the monitor does not respond? I first answer to the former: . if you pull the line may be your double 12 volt line (common two yellow two black) did not plug or forget to insert. . the chassis to the motherboard switch line is not inserted or inserted wrong. . please soil when there is metal on the motherboard caused by short-circuit motherboard self-protection so can not boot. My answer is above the answer to your question, you have to operate it? Not resolved?
Q: Cable tray 300 * 100 according to the specification can accommodate how many cables
Computer city to sell, what the equipment is really forgotten, you go to that description they know, the equivalent of a signal adapter, the cable cable connected to the device, the device transferred to the computer monitor, There is a need for a speaker can see the electric Fan Fan test both Yao Huan surprised only Leaping, and do not need chassis
Q: Do not use fire blocking material? Question added: commonly used models of fire pack specifications which ah more
First to figure out what the three lines are, if I guess good, it should be a FireWire, a zero line, a switch line. (But how is there no ground?) Come on according to this then L connected to the line of fire, N then zero line, there is a sign of the ground wire. Do not know their own words, do not mess up, called an electrician to pick up better, or easy to accident Oh!
Q: What is the national standard for energy saving bridge?
CableAccessories are the products connecting cables and transmission and distribution lines and related power distribution devices
Q: What is the spacing between the bridge and the sprinkler? What is the distance between the bridge and the fire pipe? What is the distance between the weak bridge and the strong bridge? More
Each cable factory has the experimental data to ask the manufacturers to put
Q: Water pipe must go in the bridge below it, which norms have provisions, seeking detailed solution. It is best to tell me the first few chapters.
You pick it up, in the joints to wear a hose up, after the wiring is completed. After the tape is good. And then put up the hose, hose at both ends of the wire with the tie, so that is not afraid of the wet shower. After the wiring head is connected, if the best iron soldering tin tin.
Q: I would like to ask you, you generally do steel plant, how to lay the bridge feel better? I have some drawings, 1. Some of the bridge laying in the I-beam column, 2. Some of the bridge laying on the wall, 3. There are bridges along the steel roof truss lay, I went to know the appearance of steel roof truss, There are winding, chord, the middle of the abdomen is used to insist on the upper and lower sides, but that is along the winding, roof truss sometimes not linear level, sometimes for example triangular steel truss, not the level of the winding how to walk it? Is it easy to walk? Do not know where you design steel plant, the bridge how to design the best, the most appropriate? Thank you! More
The biggest difference between a single core (smaller than the three-core cross-section) color black,
Our company is a professional distributor of Hot Dipped galvanized steels and a manufacturer of various galvanized products and processing machinery. Since two decades ago, our company has been keeping our main focus. Based on our key materials, we have built a complete supply chain from steel sheets to final products for our local and overseas clients.

1. Manufacturer Overview

Location Tianjin,China
Year Established 2006
Annual Output Value
Main Markets North America
South America
Southeast Asia
Africa
Mid East
Eastern Asia
South Asia
Company Certifications ISO14001:2004 ;ISO9001:2008 ;The SGS Certifications Of Cable Tray System

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Guangzhou,Shenzhen
Export Percentage 31% - 40%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, German, French
b) Factory Information
Factory Size: 50,000-100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches