Polymer cable tray retardant cable tray can be customized
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m
- Supply Capability:
- 10000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product name :
Polymer cable tray retardant cable tray
Product features:
Bright color appearance: the raw material is thickened stainless steel plate, the surface is smooth, the section is uniform.
One molding process: the whole folding process is one molding, the punching position is accurate, the cable tray section has no burr and no bending.
Complete size standard: size standard, special specifications can be customized.
Flame retardant material: thin coating of flame retardant material, high fire resistance, strong adhesive force.
Quality testing: after the quality testing, ensure that each product qualified before the factory.
Size:
The corresponding width, height, thickness, length can be calculated according to your project engineering
Parts:
Cover Plate、Steel Lined、 Cross Arm、Blocking 、Stainless screw、Holdfast、Anticorrosive and anti-aging protective coating.
Process:
Built in steel plate extrusion molding .
Application:
It is suitable for Power cables, communication signal cables.
- Q: Due to the environment is not good, the original buried cable damage many times, want to use the bridge, but the overhead conditions are not allowed, the picture below is the hot water pipe, the above is the hot oil pipeline, but also over three doors more
- Because the balance is not good will cause serious consequences for non-standard remote control garage door, please be sure to seek the views of manufacturers; the installation of door balance system, please install the professional staff to carry out the installation of the staff, B) off at least 13m away from the ground, not let the children enough; C) Prohibited near the door of the moving parts; according to the instructions after the installation is completed; after the installation of the control button: A) must see the scope of the door; remote control open, close the garage door to see the door, do not let the children take the remote control; when the door to open the state, and to close the emergency need to be particularly careful to prevent the installation is not Good or spring failure and hit people; installation and wiring must be in accordance with building construction standards and electrical standards if possible, the drive installed in the ground above 21 meters above the place, the clutch should be taken from the ground should be 18 meters; the Hu provided by the provision of the power supply line on the ground lead; the installation of remote control garage door, are not allowed to wear rings, watches or wear loose clothes, the use of solid, the use of strong, Wooden ladder; the installation is complete, the manual hanging in the door, in order to regularly manual safety checks and maintenance Note: If your garage door does not have a side door, please be sure to install a power outage device, so that you can manually open the door from the outside when the power is turned on
- Q: Such as: 200 * 100 * 1.5. Ordinary, galvanized and hot galvanized. How is the price calculated? Is there a formula? More
- The price of the single meter is determined by the type of the bridge and the cost of the raw material, as well as other accessories and labor costs. Calculation method: the various types of bridge after the expansion of the area × size × raw material density × raw material cost unit price.
- Q: Is the bridge mounted above or below the water pipe? Is the top of the heating tube below?
- Play thirteen SOSO friends can definitely open the whole effect + high resolution certainly not card
- Q: Always confused the bridge has been linked with copper mesh with a why even laying a galvanized flat iron. More
- Repair computer accessories (motherboard) is basically to return to the factory (in addition to the memory is a direct change for the new to you), and now what the boss so much repair their own repair ah -.- burned more serious? At least tell you about what is burning it. There is no burning is not serious argument, only to repair and can not repair these two cases. As for the will not be changed things, unless you have seen, according to phase, or really no way.
- Q: How to draw the bridge, can directly pull out the four lines composed of the bridge?
- Scenario 1: Both voice and data points are terminated with 100 pairs of 110 patch panels, using 1 and 4 pairs of duckbill jumper jumps
- Q: What is the meaning of the bridge and the non-perforated tray on the electrical drawings?
- cable test: before making with 2500V megger measuring insulation resistance, generally should be greater than 5000MΩ
- Q: What is the safety distance between the bridge and the bridge?
- Because the strong current generated by the electromagnetic field will interfere with the weak line.
- Q: Does the weak and fire can share a cable tray?
- Specific can not be sure, it is recommended that you in the billing system through the tax classification code input power gold fuzzy search, according to find out the content, select a description of the most can be.
- Q: Is it necessary to make a flat iron connection in the fire axle
- In general, overhead or line in the line is not through the pipe, but to see what your line and requirements: The following is to wear the tube of the two cases, not comprehensive 1: the line voltage level is very low (And if the metal tube) 2: or this is the case where the other lines of the same trunking affect its signal transmission, and it is necessary to wear (and if the metal pipe) The voltage level of the root line is very high, and the same slot with a lot of low voltage level signal line, then wear it a good
- Q: To ask the gods, with cad cable tray design, how to take into account the layers? Is a layer of a painting or a few layers together, how to set the specific color
- Not so is not conducive to future maintenance terms are not allowed
Send your message to us
Polymer cable tray retardant cable tray can be customized
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m
- Supply Capability:
- 10000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords