Galvanized Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 30000 Tons per Year m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Perforated cable trays have three load carrying capabilities: Heavy Duty Return Flange, Medium Duty Return Flange and Light Duty. And offer a good ventilation to cables, are generally used for moderate heat generating electrical or telecommunication applications.
Features:
-- Increase the current carrying capacity of cables
-- Takes up to 25 percent less space than ladder
-- Hole pattern designed to provide maximum flexibility for positioning cable ties
-- Speed of installation
Specification:
-- Thickness: 0.5 mm - 2.0 mm (22 - 27 Gauge)
-- Height: 15 mm - 75 mm (Light, Medium, Heavy Duty)
-- Width: 50 mm - 900 mm
-- Length: 2-6M (can be produced according to appointed length)
-- Finished: Pre-galvanized (Z80 - Z275), hot dipped galvanized, power coating
Range | Height | Width | Thickness |
Light Duty Cable Tray | 15-20 | 50-900 | 0.8-2.0 |
Medium Duty Cable Tray | 25 | 50-900 | 1.0-2.0 |
Heavy Duty Cable Tray | ≥35 | 50-900 | 1.0-2.0 |
Octopus Metal is a leading manufacturer of galvanized cable management system. We operate 2 large-scale factories with advanced equipments. Our cable trays have passed SGS and CE certification.
Ventilated cable tray offers good ventilation to the cable which will accordingly increase the current carrying capacity of the cables.
- Q: What is the meaning of "cable tray: 200 * 100 middle strip" in electrical engineering
- According to the national standard for the blue is the zero line, brown is the line of fire but you are not so strict when used, in addition to the ground, the two lines can be mixed.
- Q: Is the bridge mounted above or below the water pipe? Is the top of the heating tube below?
- Red, green, yellow, blue, yellow and green, red, green and yellow is a three-phase line of fire, blue is the zero line, yellow and green is the ground, your home switch red fire line, the rest is the control line, Socket red is the line of fire, green is the zero line, yellow should be ground. It is best to find a professional to see
- Q: How to distinguish between cable bridge lighting lines and power lines
- Question 1: how to make the two sides have a voice is very simple, buy a Walkman 1 minute 2 just like the old line of dagger stabbed some hooligans. 10 yuan to get. Question 2: how to have two sides of the image of your graphics card is best double-headed, such as the display with AVI, TV S-terminal (round like keyboard interface), and some graphics cards do not have S-terminal. Right click on the system's desktop to set the properties and you will see that you have the monitor 1 and monitor . so that the monitor as the monitor 1 (default), let the monitor 2 as a TV, then 2 will be bright when you want to watch the movie Time to drag the player to the monitor . full screen like. I did not do TV signal, are so dual show, I hit World of Warcraft, my wife put online watching TV, serve two purposes, or sent me back to death, haha
- Q: Our cable tray is the fire bridge each section are connected with copper braided wire grounding, but how to stent the ground? More
- The first principle is the first principle of the first principle is as convenient as you said that the four groups of 2.5 and . he is not the same as you buy the time directly to the goods on the line that can also see the style pick You like the public that you are also confused about the floor of the two to buy a 63 on the line to the above 100 how the whole is enough to control what you then use the power equipment is enough
- Q: Shaft bridge 400 * 200 bracket should be how many meters a
- With the length of the steel into the measurement, identify the location of open heart broken belly, there is no way to do the ground leveling layer before re-distribution.
- Q: Electrical engineering bridge; two sets of cable bridge in the same height parallel laying, during which the net distance should be at least the number of centimeters. Thank you hurry
- Please refer to GB electrical installation installation cable construction and acceptance specifications 5.3 cable duct laying 5.3.1 in the following locations, the cable should have a certain mechanical strength of the protective tube or the installation of protective cover: 1 cable into the buildings, tunnels, Through the floor and the walls. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone. 5.3 Laying of cables in cable ducts 5.3.1 In the following locations, the cable shall have a protective tube of mechanical strength or a protective cover: 1 cable into the building, tunnel, through the floor and the wall. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone.
- Q: What is the meaning of the bridge and the non-perforated tray on the electrical drawings?
- cable test: before making with 2500V megger measuring insulation resistance, generally should be greater than 5000MΩ
- Q: In the bridge of the joints with a number of bolt cover fixed, there is a 20 cm long copper wire prepared by the flat, both ends were lap on the bolt. I do not know the role of this with the flat belt? Who knows, please enlighten me, thank you! More
- Should not be the other side deliberately folded, air conditioning outside the pipe is thin before the corner, in the demolition is easy to die. The general situation can be cut off part of the broken and then can be welded, do not need too much cost.
- Q: Does the weak and fire can share a cable tray?
- Specific can not be sure, it is recommended that you in the billing system through the tax classification code input power gold fuzzy search, according to find out the content, select a description of the most can be.
- Q: How does the bridge cover set the budget
- I understand the electrical quota inside the cover is included in the inside, but the main material only the bridge is not covered, so add the main material on it. I remember that the demolition should be installed to the artificial fee of 1/3 count. But specifically where to see the forgotten.
1. Manufacturer Overview
Location | Tianjin,China |
Year Established | 2006 |
Annual Output Value | |
Main Markets | North America South America Southeast Asia Africa Mid East Eastern Asia South Asia |
Company Certifications | ISO14001:2004 ;ISO9001:2008 ;The SGS Certifications Of Cable Tray System |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Guangzhou,Shenzhen |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, German, French |
b) Factory Information | |
Factory Size: | 50,000-100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Galvanized Cable Tray
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Meters m
- Supply Capability:
- 30000 Tons per Year m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches