• Perforated Gdg Steel Strut Channel System 1
Perforated Gdg Steel Strut Channel

Perforated Gdg Steel Strut Channel

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Meters m
Supply Capability:
500 Metric Tons per Month m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description

 

perforated metal strut c channel for sale

1.Professional manufacturer & exporter

2.CE,NEMA,UL,ISO9001

3.Best price

 

Strut Channel System  Information

Strut Channel System Provides;

High quality & reasonable Price, no need welding and punching, can use repeatedly, wide usage range, flexible for        installation.

1. Standard thickness: 1.5mm, 2mm, 2.5mm,2.75mm, 3mm

2. Standard length: 2440mm, 3000mm, 5800mm, 6000mm

3. Standard size: 41*21, 41*25, 41*41,41*62,41*72,41*82

Other sizes be produced according to customer’s drawing.

Q: Our drawings are messy, some cableway or walk the bridge it also wear steel pipe, I would like to have this need to explain, we this project is the highest 23 layers more
. cable and wire are generally by the core line, insulation foreskin and protective skin composed of three components. The wire is made of one or several soft wires, with a soft jacket; the cable is made of one or several insulated packets, and the outer layer is covered with a tough outer layer of metal or rubber. . the two are not strictly bound. Usually less than the core number, the product diameter is small, the structure of a simple product called the wire, there is no insulation called bare wire, the other known as the cable; conductor cross-sectional area larger (more than 6 square millimeters) known as large wire, Small (less than or equal to 6 square millimeters) is called a small wire, insulated wire, also known as cloth wire. Cables are generally more than two layers of insulation, mostly multi-core knot.
Q: Electrical engineering bridge; two sets of cable bridge in the same height parallel laying, during which the net distance should be at least the number of centimeters. Thank you hurry
Please refer to GB electrical installation installation cable construction and acceptance specifications 5.3 cable duct laying 5.3.1 in the following locations, the cable should have a certain mechanical strength of the protective tube or the installation of protective cover: 1 cable into the buildings, tunnels, Through the floor and the walls. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone. 5.3 Laying of cables in cable ducts 5.3.1 In the following locations, the cable shall have a protective tube of mechanical strength or a protective cover: 1 cable into the building, tunnel, through the floor and the wall. 2 from the channel lead to the poles, equipment, wall surface or house pedestrians easy to close, from the ground height of 2m below a section. 3 may have a gear that has been above the cable section; 4 other places that may be subject to mechanical damage. 5.3.2 There should be no water inside the pipeline and no clogging. When wearing the cable, do not damage the protective layer, can be used non-corrosive lubricant (powder). 5.3.3 cable laying in the laying of cables, should be clear, remove debris. 5.3.4 The number of cables in the pipe should meet the design requirements; AC single-core cable shall not penetrate the steel pipe alone.
Q: How does the drawing of the cableboard of the design institute draw
First look at the skin, good general fold many times constantly, then look at the copper wire thickness, the same specifications of the wire, the more thick copper wire the better
Q: Why some cable tray to spray, what is the role?
Each device on the USB cable requirements are not the same, your wireless network receiver on the signal quality and speed requirements are relatively high, it is recommended for a better line, or for a short first
Q: Do you want to make a cross-sectional area of the jumper? What is the minimum cross-sectional area of square mm?
Wire and cable, 300 / 500V, such as the need for capacity, because the specifications of the model too much, please inform you need to know the detailed specifications. Generally 13A-22A. Cross-section different load is not the same.
Q: Seeking: cable tray 100cmx10cm bracket installation spacing requirements
Installation When the cable tray enters the building from the outside, the slope of the bridge shall not be less than 1/100
Q: Can the cable bridge be installed above the cable tray? Is there a requirement in the installation specification? anxious! The More
I have a 220V small crane, mainly on the 5th floor, hanging goods, control the small hanging switch wire is too short, I lengthened 20 meters, the switch down to the downstairs, easy to operate, in order to facilitate the small hanging switch Of the loading and unloading, I was in the wire with a car terminal connection, with the time to plug, when not on the pull, (commonly known as: public terminal, female terminal) when the copper terminal in the car is stamping in the 2 square wire The The problem came, since I connected the terminal, no use of a small crane, and later borrowed friends, borrowed, friends reflect the small hanging no effort to send to repair, repair the motor that high-pressure package where the line is not good, and finally The movement of the entire coil are changed, repair or no strength, is not my small crane switch extension cord with the reasons for the car terminal, the current is not enough, or other problems
Q: Will the electric wire be able to travel with the ordinary wire?
Puncture clips and T terminals need to remove the cable jacket, but the puncture clip does not peel off the cable core insulation layer, T terminal need to remove the cable core insulation layer. Puncture clip contact surface is small, firm degree of poor, simple and quick construction. T terminal contact surface is large, the installation is firm and reliable, but the construction is relatively difficult.
Q: I know that CCC is a mandatory product certification in China, CCC certified product catalog: wire and cable (my question is is the cable tray included in this range?) · Circuit switch and protection or connection with electrical equipment installed low-voltage electrical small Power motors · Power tools · Welding machines · Household and similar equipment · Audio and video equipment · Information technology equipment · Lighting equipment · Telecom terminal equipment · Motor vehicles and safety accessories · Motor vehicles Tires · Safety glass · Agricultural products · Latex products · Medical Device Products · Fire Protection Products · Safety Technology Prevention Products · Wireless LAN Products · Decorative Products · Toy Products More
Cable tray is no 3C certification, generally in the electrical industry needs 3c certification is the wire and cable and circuit switches and protection or connection with electrical equipment installed. Generally only have some special requirements, the state will set 3C certification or other national standard, if not, can only follow its industry standards. On the cable bridge material, the standard is generally: bridge structural steel [YB (T) 10-81] bridge construction with hot-rolled carbon steel (GB714-65)
Q: To ask the gods, with cad cable tray design, how to take into account the layers? Is a layer of a painting or a few layers together, how to set the specific color
Not so is not conducive to future maintenance terms are not allowed
We are now engaged in expanding our business scope to the global market and wish to establish mutually beneficial and long-lasting relationships with importers from all over the world. We stick to the belief of "strictly abiding by contracts and keeping credit are key points to be successful and they will lead both ourselves and our customers to a better future".

1. Manufacturer Overview

Location Shanghai, China
Year Established 2009
Annual Output Value US$10 Million - US$50 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Singapore,Vancouver,Brisbane
Export Percentage 81% - 90%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, Spanish
b) Factory Information
Factory Size: 3,000-5,000 square meters
No. of Production Lines 6
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords