• Laminated Flooring For Flooring Heating System System 1
  • Laminated Flooring For Flooring Heating System System 2
  • Laminated Flooring For Flooring Heating System System 3
Laminated Flooring For Flooring Heating System

Laminated Flooring For Flooring Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2500 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of Product:

Laminated Flooring For Flooring Heating


Specificaiton: 

1215*195*7mm

1215*195*8mm  1215*143*8mm  1215*125*8mm 808*100*8mm  808*90*8mm

 808*148*12mm  808*130*12mm  1215*195*12mm 1215*165*12mm 1215*143*12mm 1215*126*12mm                
2.Click system: uninlin/Arc\Double\Single
3.HDF\MDF
HDF  900kg\m3  at  least
MDF  880kg\m3  at least
White\Green  core 

4.Available Surface: Crystal Surface, Embossed surface,Hand-scraped Surface, Peal Surface,

                                   High Glossy Surface, Real Wood Texture Surface, Synchronized Surface. 
5.Balance paper: Grey\Yellow\Brown\Beige
6.Resistance grades: AC1,Ac2,AC3,AC4 


Features:

(1) Beautiful looking;
(2) Fashionable, popularly in the world market;
(3) Easy to install and maintain;
(4) Environment-friendly
(5) Save the hardwood, save the forest;


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.

Q: What is the difference between a system furnace and a single heating furnace in a boiler
The main difference is one that only provides heating, the other is that you can use hot water for life
Q: What are the common parts of the car heating and cooling system?
Radiator, fan, outlet is a common part.
Q: What is the warm working principle of what is warm
To warm is the underground water pipes, water pipes are circulating hot water, hot water to the ground
Q: The first time this year, warm, how should open, pay attention to what
Open the pipe cutting door, open the small tube to warm the door, the water separator to open, to the water discharge....
Q: Do you want to turn off the water return switch when the geothermal pipe is exhausted?
Geothermal (floor warm) water separator: We are exposed to the only equipment, but also we need to operate the exhaust equipment. Divided into the supply (into) water pipes and back (out) water pipes, in general, the top of the water supply pipe, the bottom is the return pipe, each have a valve, the ball valve: the horizontal direction is open, vertical helium float Feng Tong Feng is off. Gate valve: screw clockwise screw is off, counterclockwise twist is open. Another tool: a soft leather tube, the size and exhaust valve port similar to the elastic, can be tight in the exhaust valve port, to prevent the discharge when the pop, affecting health. A basin. 1. It is best to determine the exhaust in the normal heating 2. The best one by one system exhaust, in the geothermal first run process, because the pipeline pressure and water resistance is easy to produce air plug, resulting in water supply is not recycled, the temperature is not equal , Should be carried out by road exhaust. The method is: turn off the heating of the total return valve and the loop control valve, (the total return valve in front of the water separator, the pipe below the tube, the low temperature of the pipe is the return pipe.) First open the water separator A control valve, and then open the drain on the drain valve on the exhaust valve exhaust, drain the air and then close the valve, while opening the next valve. And so on, each way the air is drained and then all the valves open, the system is running. 3. The number of exhaust and heating are directly related to the length of time, such as running water and heating time, just started heating and fast heating because of heating time is short, circulating pump and heat transfer station also has time to stop, easily lead to gas block, so everyone Should be more exhaust, generally completely after a gas can be. In the later exhaust do not have to close the valve, you can directly discharge a small amount of air
Q: Does the gas ratio valve of the boiler be airtight
The gas proportional valve is mainly based on the current command or load demand of the main control board of the boiler, instantaneous opening, shutting off the gas source or in the air supply state, according to the different needs of heat load, current affairs to reduce or increase the gas flow A combustion system components, generally consists of two safety off valve and Fuhai Dili destroy Gao Ji Dian top hug a proportion of regulating valve composition. If the gas ratio valve fails, then it may cause the boiler to work properly. General recommended direct replacement, maintenance is relatively cumbersome, not necessarily repaired.
Q: Geothermal coil spacing is too hot not how to do
Home improvement 200. works 350...
Q: Owners in the decoration before the obligation to suppress the warm...
I was in October 2009 to get the key to the house, small property, but no evidence, on the 3rd floor. At that time the house has been built for two years, when we are a collective decoration. I was renovated in December 2009, was not to warm to suppress, to warm the project to do, at the end of this year when the second floor of the notice received, said his roof leakage, after investigation, confirmed that my family To warm the emergence of a problem, contact the developer, the beginning of the arc 粻 post to save the cheat brother wedge workers did not come over, our property is composed of the village committee, and now I have been paved to the ground, and carpentry has done, Ground to warm, the village committee said to pay part of the money, but not enough of my decoration loss, how should I do? Attached: I am not looking for the decoration company installed, all the renovation projects are looking for the relationship, then the decoration process, there is no damage to the warm 1. I did not suppress the decoration before the warm, I was in the decoration before the obligation to pressure to warm The 2. At that time to do the closure of the test when the second floor has been unable to contact, the current floor to warm this cost and my decoration loss, who should bear? Do I have any responsibility? Who is more responsible? 3. At present, the cost of compensation for the village committee, even the normal pavement money do not come down, how can I do? 4. If the lawsuit, I was the one which side? More...
Q: My home is the developer himself installed boiler heating, the developer to the unified pavement to warm, my family is the first year of the new building, home water and backwater are not hot! I am five units from the boiler room farthest unit, developers say 15 floor is the following from the bottom of the water, 16-30 floor is from the water down, each floor a total of 6 households, I live on the 5th, 1 , 2,3,6 are no problem, only our home and No. 4 problem, we and 6 is a pipeline, 6 home 22 degrees, water meter room is the main road is warm, into the home of the 6th pipe is Hot, and 4,5 into the home of the pipeline is cool, but also do not feel the sound of water? The property fiddle for a week and there is no good bowel flat section of the strong light hold the dog platinum, how is it? More
Agree with the views of the S-Jun always, first check the pipeline, the valve is smooth, if no problem to put a breath. To warm the heat in addition to blocking the gas is blocked, no other problems.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords