• Solid Wood  Flooring For Flooring Heating System 1
  • Solid Wood  Flooring For Flooring Heating System 2
  • Solid Wood  Flooring For Flooring Heating System 3
Solid Wood  Flooring For Flooring Heating

Solid Wood Flooring For Flooring Heating

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1800 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of Product:

Prefinished solid flooring


Features:

Excellent stability,be suitable for ground heating system

Damp-proof, anticorrosive, anti-rot.

 

 Specification:

1.Species: Oak,maple, teak, compass, ash and so on 

2.Grade: A,AB,ABC 

3.Color: Natural or as per you want 

4.Surface: Flat surface 

5.Length: Varying length 300-1500mm 

6.Width: 76-95mm or 120-127mm 

7.Thickness: 15mm/18mm 

8.Moisture content: 8%-10% or as per customer requested  

9.Air-dryDensity:0.6 to 0.8g/cm3 

10.Joint4 side:  T & G, with micro bevel 

11.Installation Location: On or above ground level 

12.Installation: Nail 

13.Gloss:Matt/semi-gloss/high-light 

14.Timber origin: china, southeast asia,russia, usa, canada  

15.Style: Full plank


Features:

Solid Wood  Flooring For Flooring Heating

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Q:System Comparison of Central Air Conditioning Water System
Specifically, it should be water system and refrigerant system (R22, R410A, etc.). Water system refers to water as a medium, through the water will be the heat and heat transfer to the end, and to adjust the air heat and heat effect of such a way collectively referred to as the water system. The same refrigerant system is through the R22 and other refrigerant to heat and cooling to the end of such a form to achieve the role of regulating the air, known as the refrigerant system.
Q:What is the warm lead of the heating cable
Heating cable in the ground is the heating body, but the heating part can not be on the wall, which requires non-heating cable for current guidance.
Q:What is the difference between a warm water and a water separator?
The role of the water separator is the heat source of hot water separately into each side of the ground radiation heating pipe laying, to achieve sub-room heating and temperature adjustment purposes. The sump is a combination of low temperature water in each way after the heat dissipation is separated and fixed to the wall or the ground. The manifold and the sump are made up of supervisors, shunting valves and joints, exhaust valves, drain valves, and terminal plugs. The use of sub-catchers effectively avoid the loopholes in water management, centralized installation, management of water meters, and with single-tube multi-channel.
Q:Gas boiler hanging water valve bad, how to pay the furnace.
Can we confirm that it can be closed? If you can directly to the tap water and heating valve shorted!
Q:The working principle of the heat transfer station
A heat source through the pipeline to the heat transfer station, and into the heat exchanger, heat exchanger through the heat exchanger, the primary heat exchange to the secondary heating pipe, the secondary heating pipe leads to hot users.
Q:Clean and warm central air conditioning need to qualify it
First, the cleaning of the air conditioner should include three parts: the first air conditioning body shell and exposed parts, easy to contaminated parts; second filter cleaning, is the most important part of the core; third condenser and evaporator part, Rare, and maintenance in a piece, the equivalent of a small system of cleaning, are relatively large "surgery", often appear in the old air conditioner or "special machine", "inferior machine", this type of air conditioner is not a large part of the cleaning and Maintenance value. Second, the cleaning method: 1, on the air conditioning body shell and the corresponding parts of the cleaning is simple, as long as the water add a little soap powder and detergent, or a special air conditioner cleaning fluid can be a considerable part of the air conditioner clean, in line with cleaning operation requirements The 2, as the key parts of home air conditioning cleaning is the filter cleaning, first open the air conditioning indoor cover, remove the filter, brush with a clean filter brush, the filter attached to the vast majority of dirty brush, And then soaked in a special air conditioner cleaning solution or homemade cleaning solution or detergent and soap powder mixture, soak for 10-20 minutes, depending on the filter dirty degree, soaked with a bottle brush brush brush Net, so that each filter hole clear and transparent, no dirty block traces, and then after a special clean cloth dry, check intact, the filter installed to the body, depending on whether the normal operation. If the normal can sign acceptance, cleaning work is over. Home air conditioner cleaning favorable to improve the cooling efficiency; favorable to improve the cooling effect, favorable to extend the life of home air conditioner equipment, favorable to improve energy efficiency, user health benefits, the effect than the "health air conditioner" healthier and more ideal.
Q:1200 square meters of villas need much electric heating stove
Have you considered heating it?
Q:To warm the system main material and auxiliary materials which include what
As we all know, water to warm system is a complex artificial engineering, from the warm and the main material to warm the composition. To warm the main material to determine the warmth of the safety and stability, to determine the warm air to meet the environmental protection and energy saving. To warm the main material parts: wall-hung boilers, heating the main channel, sub-catchment, to warm pipe, thermostat, and so on. Large houses are also equipped with heating circulating water pump (from the pressurized effect), constant temperature mixing valve (energy saving and good comfort) and so on. These devices are the main part of the warm floor, but also to warm the main supplies, especially the boiler and to warm the tube, basically occupied the vast majority of the cost of heating. To warm the auxiliary material laying part: reflective film, extruded board (insulation board), steel wire mesh, the border insulation strips, to warm the staples, insulation casing, raw materials, such as ball valve. The price of these auxiliary materials is not high, more varieties, the market is complex, but these accessories are warm to install the important details of the heating system to the energy-saving effect and insulation effect is to warm the auxiliary materials are inseparable.
Q:Public bath with water heating
The cost is too high to operate.
Q:Can drive two bedrooms, two groups of small heating furnace heating
Should be based on the area, not between the units

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords