• Polythene Foam with Silver Foil for Heat Reflection for Floor Heating  System System 1
  • Polythene Foam with Silver Foil for Heat Reflection for Floor Heating  System System 2
  • Polythene Foam with Silver Foil for Heat Reflection for Floor Heating  System System 3
Polythene Foam with Silver Foil for Heat Reflection for Floor Heating  System

Polythene Foam with Silver Foil for Heat Reflection for Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
3000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Features

1.99.9% pure Aluminum Foil 
2.Reflect 97% of heat radiation 
3.Non-toxic& Non-carcinogenic 
4.Durable and lightweight

Description of Product:

aluminum foil EPE/XPE foam insulation with fireproof


Features:

1)     Roof, wall, floor for heat insulation and thermal insulation;

2)     Use as floor mat: soundproof, anti-skidding, moistureproof, thermal retardation;

3)     Underlayment for real wood floor, laminate floor;

4)     Major materials for baby mat, leisure mat, etc;

5)     Can be made into different colors and antitatic according to customers specific requirements to reach the standards of top grade decoration.


Photos:

Polythene Foam with Silver Foil for Heat Reflection for Floor Heating  System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Q:To install the mixed water center also installed with a pressure differential bypass valve
The role of mixed water center is mainly to adjust the warm water supply problems, to achieve automatic control of water supply temperature. Reason: According to the provisions of the country to warm the installation, the water temperature should not be higher than 60 ℃: 1, to prevent the warm water in the warm pipe, water mixers and other heating system components in the scale. 2, to warm the pipe material for the plastic material, the higher the temperature of the working environment, the greater the pressure, will shorten the warm life. Municipal central heating more in accordance with the heating film heating temperature of 80 ℃ to the water, far more than the warm to apply the highest temperature. The mixed water center can mix the low temperature water of the heating system backwater into the water supply pipe, lower the heating water temperature, and then supply it to the floor. Refer to the following figure: Madison fireplace, dedicated to your service.
Q:What are the advantages of home gas boiler?
The advantages of a large number of home gas boiler, platinum diagram of the boiler as an example, then at least the following advantages: 1, heating, and domestic hot water can supply; 2, heating temperature stability, water temperature can be adjusted; Flexible, simple operation; 4, high thermal efficiency, cost savings, conducive to environmental protection; 5, less land, take up less space 6, high comfort, good heating effect. & Lt; & lt; / RTI & gt; & lt; / RTI & gt; re are a lot more!
Q:Use the boiler is often used to adjust the minimum number of degrees
Water temperature is 60 degrees minimum
Q:How long can I use water? How much does it cost each month? Which is the most professional to warm?
If you buy, once Yong Yi, spend Well ~ all around the same,
Q:Walled gas heating furnace is good or not better to protect the water
The water in the furnace is generally not let go, and summer if you use hot water or to run the boiler. There is a long time without the words of the boiler water pump, three-way valve and other accessories will be stuck, the next blessing to support the younger brother of the tripod Qin Ding Ding Ding also with the time to open in the get, the water, then there will be put Stuck function
Q:Home old house want to install to warm how to do?
It is not very good to go to the pipeline. Not how to change
Q:PE-RTII Oxygen-resistant heating tube custom specifications manufacturers where?
PERTII-type oxygen to warm the pipe has been popular in foreign countries, the domestic pe-rtII oxygen to warm the current tube is still the ranks of high-end heating pipe, slowly will be popular; pertII oxygen to a good solution to solve the problem of oxygen permeation To warm the system in the installation and use of metal components to meet, such as valves and other metal parts, the general pert to warm the plastic and other plastic bite the body of the abundance of the agent by the ax of the hot water circulation process metal parts can easily be corroded, This will be detrimental to pe-rt to the long-term use of the warm-pipe system, the new pertII oxygen to warm the tube to solve this problem, so that the heating system to greatly improve the life of the heating system to ensure that the pe-rtII to warm the system safe use 50 Years or more.
Q:To warm the warranty period from when to count
First, to warm the warranty period is generally the beginning of the check if the developer is to do the warmth of the warranty period for the two heating period. Second, the "home quality guarantee" warranty period from the developer will be completed acceptance of the use of housing from the date of calculation. Third, the specific quality of the warranty period and the warranty period is: the foundation and the main structure within a reasonable life life; roof waterproof for 3 years; wall, kitchen and toilet ground for 1 year; general agreement basement and pipeline leakage For 1 year; wall, ceiling plaster layer off for 1 year; ground empty drum cracking, large area sand for 1 year; doors and windows cracked, hardware and sanitary ware damaged for 1 year; lamps, electrical switch damage to 6 Month; pipe block for 2 months; heating and cooling system equipment for the two heating period or the heating period; other parts, parts of the warranty period, agreed by the buyers and sellers, and written in the project quality assurance.
Q:Last year just cross the room, will the ground to freeze it? How big is it possible? If it is possible to crack, need to press to determine it? Question added: no live, to warm should be no water. More
Since the "have to pay half of the money, and this winter is not to stay, apply for warmth, then they are not responsible for the warmth of frozen," then change the idea to solve, do not have to spend more time with their children wasting: warm is not easy to crack, but do not rule out extreme case. To understand: there is water in the warm tube is the key, easy to freeze. Solution: the home of the warm system and the external system to isolate the household valve closed (preferably in the demolition of the valve joints plus a wire plug to prevent the valve from the external system out of water), and then please use The air pump blows out the residual water of the home heating system, so there is no moisture in the whole system, and it is not afraid to warm the crack.
Q:Air source heat pump how much money
The price of the words are high and low, depending on how you choose, and generally domestic relatively cheap, of course, is also very reliable to use, (green) (special) (empty) (tune) is a good choice

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords