HVAC systerm air vent diffusers ceiling use
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification of Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
Usage of Air Diffuser
The grille is suitable for ceilling sidewall, soffit or cill mounting and may be used for supply or extract applications.
Typical installations include offices, shops, hotels and most commercial or industrial buildings.
Available as standard in white polyester powder coat finish.
Other polyester powder coat finishes are also available as an option.
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q: Members of my dear friend, brother house this winter can not live, but this heating fee is expensive, ah, want to stop, afraid of the temperature is too low, the warm tube to crack. Would like to ask experienced friends, what advice? Is not to put the pipe in advance of the water out of the ah, the stare out of the box of meat, Or simply do not have to drain the water is not bad, thank you more
- can. Is to emptying.
- Q: The water in the heating furnace is often good
- Bad, often change the water easy to rust. Repeatedly boiled water is low in oxygen.
- Q: What parts of the radiator (radiator) heating system?
- In simple terms, the radiator (radiator) heating system consists of: heating water heater, heating pipe, radiator and thermostat composed of four parts. Specific questions can be consulted at any time.
- Q: Which brand is good to do it?
- Do warm everyone is no stranger, but now the market is very chaotic to the chaos, so that the owners are headaches to do in the end what kind of good quality pipe? How to choose to warm the brand? Here to listen to Ainuo industry for your brief! Do warm to general is divided into two kinds, a kind of water to warm, a kind of electricity to warm, usually to warm the brand, is to warm the company's brand, not to warm the pipe brand. Such as Aino tube industry to warm the pipe, and to warm the brand inside and then to warm the brand and warm air brand. Water to warm: look at the pipe, the general home improvement and villa on the company in the country to do the warm installation and sales point of view, do more imported brands, the project on the domestic brands are more, as you said which weight is good , The most simple one to the truth of a penny, a sub-goods, with everyone to buy the same clothes, some people go to the store to buy, and some to the stall to buy, followed by sub-catchment, sub-catchment, generally divided into stainless steel and pure Two kinds of copper. I do not have to explain the pure copper is sure, sub-catchment is used to branch the water, the money to the land, must be willing to warm. Heating to the ground: heating to the general heating cable and thermostat, heating cable on the current market To see the most authoritative brand is, Aino and complex sea and sea two, of course, is not to belittle other products, but these two have been opened in the market, with a wide range.
- Q: What does the boiler pressure mean?
- Is water pressure
- Q: How to use geothermal cleaning machine
- With the instructions to say with the instructions, and then not to the place to buy usage
- Q: Water pressure test should meet the requirements
- (1) The hydrostatic test shall be carried out after the system has been flushed. (2) water pressure test should be per component, the collector as a unit, by group or by loop. (3) water pressure test should be carried out twice, respectively, before the pouring of concrete before the reign of rough rougers and the filling layer after the expiration of the maintenance of the filling tube; the best heating pipe laying before doing a test. (4) the test pressure should be 1.5 times the working pressure, and should not be less than 0.6Mpa. (5) test method: the test pressure, the regulator 1h, observe the pressure drop, if the pressure drop is not greater than 0.05Mpa, that qualified. (6) water pressure test should be used to slow down the manual pump, boost the process to observe and check the presence or absence of leakage. (7) in the case of freezing may test pressure, the pressure test pressure should be completed after the tube of water to dry, but only the air pump is blowing is not clean, it is recommended to use warm cleaning special tools, Each road tube, for drainage, so that the real guarantee of each tube, there will be no drop of water to ensure that no pipe freezing, practice has proved that there are many use of air pressure test.
- Q: How to choose the wall heater
- There is no difference between the use of the boiler and the radiator. Mainly to choose the brand, good reputation of the dealer, and experienced installation staff.
- Q: What does building HVAC include?
- Warm, including heating equipment, materials, accessories; including ventilation and air conditioning. Indoor heating pipe and accessories installation; indoor heating aids and radiators and metal radiator board; indoor heating aids and radiators and metal radiator installation of low temperature hot water floor radiant heating system installation; boiler installation works; boiler auxiliary equipment installation; Pipe installation and installation; ventilation installation: air duct and accessories production; duct system installation (send, exhaust, smoke, dust removal system) duct components and muffler production; send exhaust system; smoke control system ; Dust removal system; air conditioning system; clean air system; refrigeration control system; air conditioning water system.
- Q: What is a family independent heating system
- Own heating, and has nothing to do with others
Send your message to us
HVAC systerm air vent diffusers ceiling use
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords