• Bamboo Flooring  for Floor Heating System System 1
  • Bamboo Flooring  for Floor Heating System System 2
  • Bamboo Flooring  for Floor Heating System System 3
Bamboo Flooring  for Floor Heating System

Bamboo Flooring for Floor Heating System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1800 m²
Supply Capability:
3000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of product:

bamboo flooring for heating


Specification:

1.carbonzied horizontal structure 

2regular knots texture 

3 F-type click lock 

4.A grade


Features:

1. horizontal carbonized structure

2.gloss lacquer finished

3.beauty,various color for choose

4.meet E1 grade

5.pass CE/ISO9001/ISO14001 certification

6.size:1000x126x17mm or 960x96x15mm

7. harder and stronger

8. this series bamboo flooring: high-temperature and pressure carbonized desugared,degreased and dehumidification, strong hardness with high density, fine tissues with high elasticity, anti-wear & spilt-rersisting, E1 grade quality Assurance and mothproof, mildew proof, healthy & environmental.


Photos:


Bamboo Flooring  for Floor Heating System


FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.




Q: Household gas boiler classification
According to the installation method can be divided into wall-mounted gas boiler (balanced, power 20kw-36kw-based, high integration, the first choice), landing gas boiler (atmospheric, power 50kw above, suitable for villas, most need independent boiler room, auxiliary Is independent), wall-mounted and can be divided into board replacement and casing machine. Plate replacement machine high comfort, the price is slightly higher, casing machine cheap, of course, spare parts are also cheap. Above these are the main types, as well as condensing boilers, module boilers, these do not have access.
Q: What is the composition of the heating system?
1, boiler: heating and provide hot water device. At present, the general use of gas-strong row of boiler. 2, sub-catchment: the hot water assigned to the need for heating areas, divided into manual and automatic two. (Installed do not sub-water collector) 3, the cooling device is: a heat transfer of hot water to distribute, to achieve the heating needs of the device. At present, there are two common forms of radiator, low-temperature floor radiant heating (referred to to warm) two forms; also wall warm. 4, temperature control system: A, boiler linkage thermostat: According to the indoor temperature control of the automatic operation of the boiler, at the same time with programming timer switch function. Can not be achieved sub-room temperature control. B, sub-catcher linkage thermostat: According to the indoor temperature, control sub-collector on the electric actuator switch to reach the temperature of each heating area. (Generally used to warm) C, automatic thermostatic valve: According to the temperature control valve set temperature, automatically adjust the size of the water flow within the radiator to achieve the temperature of the device. (Generally used for radiator heating) A and B above two products in principle can not be used at the same time.
Q: Do you have a good geothermal cleaner?
OKorder workers to warm the washing machine is very good operation, the Internet has a video operation. The specific operation steps are as follows: 1. Close the manifold main control valve and also open the sub-valve is also closed. 2. Place the drain on the side of the divider and install the quick connect. 3. The host pulse output, inlet pipe, water separator sewage pipe connected. 4. Check the various parts of the connection is not leaked open cleaning. Cleaning pipe Note: 1. The connection must be tightened to prevent leakage, must be inserted in the end of the tube, when the card must be broken to the end of the ring. 2. The drain end must be inserted into the sewer mouth to prevent contamination of the environment when it is discharged. 3. Before cleaning, be sure to ensure that every road to warm pipe without discount. 4. Cleaning should pay attention to the pump pressure to prevent the pipeline blockage pulse generator can not work properly, to stop the work analysis reasons. 5. The pulse generator found that there is leakage of water leakage phenomenon should stop working troubleshooting. 6. If you encounter the construction environment in the water source can be more distant piping connection.
Q: Which brand is good to do it?
Do warm everyone is no stranger, but now the market is very chaotic to the chaos, so that the owners are headaches to do in the end what kind of good quality pipe? How to choose to warm the brand? Here to listen to Ainuo industry for your brief! Do warm to general is divided into two kinds, a kind of water to warm, a kind of electricity to warm, usually to warm the brand, is to warm the company's brand, not to warm the pipe brand. Such as Aino tube industry to warm the pipe, and to warm the brand inside and then to warm the brand and warm air brand. Water to warm: look at the pipe, the general home improvement and villa on the company in the country to do the warm installation and sales point of view, do more imported brands, the project on the domestic brands are more, as you said which weight is good , The most simple one to the truth of a penny, a sub-goods, with everyone to buy the same clothes, some people go to the store to buy, and some to the stall to buy, followed by sub-catchment, sub-catchment, generally divided into stainless steel and pure Two kinds of copper. I do not have to explain the pure copper is sure, sub-catchment is used to branch the water, the money to the land, must be willing to warm. Heating to the ground: heating to the general heating cable and thermostat, heating cable on the current market To see the most authoritative brand is, Aino and complex sea and sea two, of course, is not to belittle other products, but these two have been opened in the market, with a wide range.
Q: Collective heating, and their own to change the use of heating valve installed
Install a mixed water center to prevent the temperature is too high and affect the life of the warm pipe to warm the temperature is generally maintained at about 60 ℃
Q: To warm the system main material and auxiliary materials which include what
As we all know, water to warm system is a complex artificial engineering, from the warm and the main material to warm the composition. To warm the main material to determine the warmth of the safety and stability, to determine the warm air to meet the environmental protection and energy saving. To warm the main material parts: wall-hung boilers, heating the main channel, sub-catchment, to warm pipe, thermostat, and so on. Large houses are also equipped with heating circulating water pump (from the pressurized effect), constant temperature mixing valve (energy saving and good comfort) and so on. These devices are the main part of the warm floor, but also to warm the main supplies, especially the boiler and to warm the tube, basically occupied the vast majority of the cost of heating. To warm the auxiliary material laying part: reflective film, extruded board (insulation board), steel wire mesh, the border insulation strips, to warm the staples, insulation casing, raw materials, such as ball valve. The price of these auxiliary materials is not high, more varieties, the market is complex, but these accessories are warm to install the important details of the heating system to the energy-saving effect and insulation effect is to warm the auxiliary materials are inseparable.
Q: How to choose the wall heater
There is no difference between the use of the boiler and the radiator. Mainly to choose the brand, good reputation of the dealer, and experienced installation staff.
Q: What is the geothermal decoration process?
First to do the original ground leveling, and then covered with insulation materials, the top of the laying of warm water pipes, and then laying a layer of insulation materials, and then above the mortar leveling
Q: Public bath with water heating
Public bath with water heating...
Q: Carbon crystal wall warm how good carbon crystal wall warm advantages and disadvantages...
Carbon crystal wall warm how good carbon crystal wall warm advantages and disadvantages

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords