• Engineering  Flooring For Flooring Heating System 1
  • Engineering  Flooring For Flooring Heating System 2
  • Engineering  Flooring For Flooring Heating System 3
Engineering  Flooring For Flooring Heating

Engineering Flooring For Flooring Heating

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1800 m²
Supply Capability:
100000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

Engineering  Flooring For Flooring Heating


Specification: 

490/600X70X10mm,4mm top layer;

600/900X90X10mm,4mm top layer;

Color: Natural

Joint: Tongue & Groove

Grade: AB
Finish: UV lacquer/UV oiled (PPG brand);
Bevel: Square Edge;
Moisture Content: 8-12%;
Glue: PF;
Plywood: Meranti,beech, poplar mixed;
Available Surface: Flat, distressed or handscraped;

 

Formaldehyde emission: CARB standard;

Available Certificates: CE,ISO9001, CARB, FSC;

Other wood species: American Walnut,White Oak,Ipe, Tigerwood, Hickory, Meranti, Cherry, Sapele, Maple, Birch, Elm,etc.


Photo:


Engineering  Flooring For Flooring Heating

FAQ:

① why from okorder?

Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.

All products had been produced under a clear quality standard and the quality is consistence among the shipments.

Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.  

②How to guarantee the quality of the products?

We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.

QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery, 

③How long can we receive the product after purchase?

Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.


Q:To warm the winter can not live without water can be frozen to warm it?
Too cold, if the indoor temperature below 5 ℃ will crack. If you do not need to do some maintenance. Maintenance methods: 1, the winter should not pay attention to heating, watertight parts should be prevented from cracking and heating pipe in the water clogging the pipeline. 2, not to be activated when the watertight parts to prevent cracking, the system is not installed after the winter that year, such as indoor temperature below 5 ℃, the system should be all the air with air compressor blowing, to prevent the system by freezing. Winter should not be enabled when the geothermal heating system should pay attention to protection, to prevent the water diversion components or heating pipe in the water icing.
Q:What are the common parts of the car heating and cooling system?
Automotive air conditioning and refrigeration system is mainly composed of compressor, expansion valve, condenser, evaporator and blower, etc., during which the various components between the use of high-pressure rubber pipe and steel pipe connected into a closed system, in the refrigeration system work, the refrigerant will In a different state in this space circulation, and this cycle is divided into four processes: 1, the compression process: the compressor inhalation of the evaporator at the exit of the low temperature and low pressure refrigerant gas, it is compressed into high temperature and high pressure gas Discharge the compressor. 2, the heat process: high temperature and high pressure superheated refrigerant gas into the condenser, due to the pressure and temperature reduction, the refrigerant gas condensed into liquid, and discharge a lot of heat. 3, the throttle process: the temperature and pressure of the refrigerant through the expansion of the device after the expansion of large volume, pressure and temperature of the sharp arrest Cao Ken 丨 old investigation of intestinal fried to decline in the mist (small droplets) discharge expansion device The 4, endothermic process: mist refrigerant liquid into the evaporator, so the refrigerant boiling point is much lower than the evaporator temperature, so the refrigerant liquid evaporated into gas. In the evaporation process a large number of absorption of heat around, and then low-temperature low-pressure refrigerant vapor into the compressor. The above process is repeated for the purpose of reducing the temperature of the air around the evaporator. Automotive air conditioning refrigeration and home air conditioning refrigeration is exactly the same, the need for compressor work, and heating is much simpler, because the car engine after cooling there are about 90 degrees, directly facing the engine blowing is hot air friends.
Q:Members of my dear friend, brother house this winter can not live, but this heating fee is expensive, ah, want to stop, afraid of the temperature is too low, the warm tube to crack. Would like to ask experienced friends, what advice? Is not to put the pipe in advance of the water out of the ah, the stare out of the box of meat, Or simply do not have to drain the water is not bad, thank you more
can. Is to emptying.
Q:What does the boiler pressure mean?
In the wall of the boiler next to a valve with a screwdriver can open the knob to open it can be pressed to see the pressure gauge to 1.5 or so when the stop, you can
Q:Floor heating system
To warm the mixing device can make the warm and warm air for the common share of a hot water heat, no longer need to set up a separate low-temperature heat source. The warm-water cooling device is converted into low-temperature and large-flow circulating water by mixing the high-temperature water supply with the partial low-temperature backwater. The main function is to improve the safety and comfort of the heating system to ensure the energy saving The The role of the heating device is to solve the high temperature heat source installation to warm one of the methods is to use the warm heat after the low temperature backwater and high temperature water supply to provide the appropriate temperature of the heating water, compared with other cooling methods are simple and convenient, The advantages of temperature stability. The warm water mixing device is composed of mixed water circulation pump (household usually shielded pump), mixed water parts, temperature control valve method, and temperature, temperature sensor and over temperature protection. The high temperature water source through the mixing device into the ground heating system, and after the warm coil to cool the temperature after the lower temperature of the warm water back in the mixed water components to mix, mix the appropriate temperature of the water through the booster pump into the water separator, And then through the warm coil cooling heat. The booster pump in the device is used to provide the power of the mixed water. In the mixed water system, the mixing water component must have the function of controlling the temperature of the mixed water at the set value and avoid the change of the mixed water temperature as the water supply temperature changes. Mixing parts in different products have different forms, such as self-heating remote control valve, constant temperature mixing valve, electric two-way valve, electric three-way valve, mixed water tank, four-way control valve.
Q:Toshiba home central air conditioning how?
Toshiba how to sell after, Toshiba has sold it? I am the first manufacturing power, in addition to multi-axis lathe and other high-precision processing and Japan have a gap, the other basic rolling, the other is the first to build a large number of manufacturers, Not domestic can not make high-quality products, but do not come out the price is too high you do not buy, there is Toshiba where the production of compressors? Native or Thai? You have broken the machine Mody, know 8 into parts is made in China Mody, the machine is my beautiful production how nobody said, was the acquisition of the United States how nobody said, Toshiba air conditioning in Japan is really good, do not come Foreign brands feel great; Daikin's quality is not as good as before, but the price is cheap, whatever the outcome, he has the country's first sales, the central air-conditioning field of the most complete after-sales, Daikin done publicity? Are we all fool, not out of the use of domestic Gree, although the late start, but the quality is not worse than Toshiba, the United States basically won the Toshiba, believe that Gree will soon force
Q:I see the panel has a "cycle of digital time relay", the United States called microcomputer controller, as well as seismic pressure gauge, the rest is the switch indicator light, and there is no knowledge of what (estimated that there are two A solenoid valve a tube of water a gas), this thing on the market to sell more than 2000, I feel the cost of 200 to 300 yuan (guess, because I do not know where the burden of the child to pay the nuclear shop is too much money). Hope to tell the internal structure, which there are any components, I would like to do one, have a better picture, as well as cleaning, "time relay" set parameters (water and ventilation time), hope you greatly educated, brother Thank you The More
Practice has proved that the method of pulse geothermal cleaning is far from the effect of good projectile, the so-called pulse is a pulse device, the name is the water to form a spiral to play out, and then rotate in the pipeline flow to the flushing pipe wall The role of the general situation are part of the water block part of the blockage is serious, the mouth can not get into the water how will rotate in the wall? I have been engaged in geothermal cleaning has five or six years, the pulse of the basic method is a hammer , The effect is very poor, and always call me this is not hot, obviously not hot, so less than a last resort I will not use the pulse, and only those who can not be demolished, or with the projectile. Since you have been demolished on a demolition in the end chanting, that thing is very simple, the cost of the burden of the child from the nuclear shop as you said it is one or two hundred dollars, only two solenoid valves, and a control of the intensity Small board, purely bluffing stuff...
Q:Clean and warm central air conditioning need to qualify it
First, the cleaning of the air conditioner should include three parts: the first air conditioning body shell and exposed parts, easy to contaminated parts; second filter cleaning, is the most important part of the core; third condenser and evaporator part, Rare, and maintenance in a piece, the equivalent of a small system of cleaning, are relatively large "surgery", often appear in the old air conditioner or "special machine", "inferior machine", this type of air conditioner is not a large part of the cleaning and Maintenance value. Second, the cleaning method: 1, on the air conditioning body shell and the corresponding parts of the cleaning is simple, as long as the water add a little soap powder and detergent, or a special air conditioner cleaning fluid can be a considerable part of the air conditioner clean, in line with cleaning operation requirements The 2, as the key parts of home air conditioning cleaning is the filter cleaning, first open the air conditioning indoor cover, remove the filter, brush with a clean filter brush, the filter attached to the vast majority of dirty brush, And then soaked in a special air conditioner cleaning solution or homemade cleaning solution or detergent and soap powder mixture, soak for 10-20 minutes, depending on the filter dirty degree, soaked with a bottle brush brush brush Net, so that each filter hole clear and transparent, no dirty block traces, and then after a special clean cloth dry, check intact, the filter installed to the body, depending on whether the normal operation. If the normal can sign acceptance, cleaning work is over. Home air conditioner cleaning favorable to improve the cooling efficiency; favorable to improve the cooling effect, favorable to extend the life of home air conditioner equipment, favorable to improve energy efficiency, user health benefits, the effect than the "health air conditioner" healthier and more ideal.
Q:Household gas boiler classification
According to the installation method can be divided into wall-mounted gas boiler (balanced, power 20kw-36kw-based, high integration, the first choice), landing gas boiler (atmospheric, power 50kw above, suitable for villas, most need independent boiler room, auxiliary Is independent), wall-mounted and can be divided into board replacement and casing machine. Plate replacement machine high comfort, the price is slightly higher, casing machine cheap, of course, spare parts are also cheap. Above these are the main types, as well as condensing boilers, module boilers, these do not have access.
Q:What is the basic task of heating engineering? The heating system is composed of some parts
What is the basic task of heating engineering? The heating system is composed of some parts...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords