Engineering Flooring For Flooring Heating
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1800 m²
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description:
Engineering Flooring For Flooring Heating
Specification:
490/600X70X10mm,4mm top layer;
600/900X90X10mm,4mm top layer;
Color: Natural
Joint: Tongue & Groove
Grade: AB
Finish: UV lacquer/UV oiled (PPG brand);
Bevel: Square Edge;
Moisture Content: 8-12%;
Glue: PF;
Plywood: Meranti,beech, poplar mixed;
Available Surface: Flat, distressed or handscraped;
Formaldehyde emission: CARB standard;
Available Certificates: CE,ISO9001, CARB, FSC;
Other wood species: American Walnut,White Oak,Ipe, Tigerwood, Hickory, Meranti, Cherry, Sapele, Maple, Birch, Elm,etc.
Photo:
FAQ:
① why from okorder?
Okorder is a qualified supplier of all kinds of building matierials in China. All products have been showed in Okorder website are under well controlled by okorder QC team.
All products had been produced under a clear quality standard and the quality is consistence among the shipments.
Okorder has already setted up more than 20 warehouses in different markets to show the products. You are convenient to know the products from your local place and it will help you to make decision easyly.
②How to guarantee the quality of the products?
We have established a perfect quality management system,as for raw material and semi parts all are under strict quality test and we have a IQC system to control the purchases.
QC on site is very strict and all steps of process are measured per drawings. Before delivery, we set a OQC system to make sure each piece meet the standard of order.from design to delivery,
③How long can we receive the product after purchase?
Lead time depending on order quanity, The normal order can be deliveried with 3 weeks.
- Q: Will the warm winter do not burn?
- After the water will not let go
- Q: What is the principle of warm What do the fuel
- What is the principle of warm What do the fuel...
- Q: Now on the market plumbing and heating that kind of better? They later the energy that high ah? Later to maintain that more? More
- To warm the brand is not good to say, to warm to warm tube. Fireplaces. Sub-sump, control panel, and so on some components. And they are their own brand, so that you want to ask the warm brand, it really can not say. But it is possible to compare the warm and plumbing. Heating before the heated museum satin and other turtles to persuade the horizon to invest a little smaller than the plumbing but did not get the water heater, so the home of the water will have to pay another money to buy, plumbing, then put into the pre-heating than expensive, But the water heater in the boiler to solve the problem of hot water, do not have to buy a separate water heater. So it is almost the same. Later use, then the obvious plumbing than the cost of heating the location, but this is to see the use of personal circumstances, but theoretically calculated: 1 kWh = 860 calories, 1 air = 8600 calories, 1 The amount of electricity to calculate the cost of 0.5 yuan Well, 1 air count 1.8 yuan, the same generation of 8600 calorie gas needs a party, electricity needs 10 degrees, then the side gas is 1.8 yuan. 10 degrees TV 5 yuan. The gap came out, the students on their own calculations. Late maintenance point of view: the existence of electricity attenuation, and now can not guarantee that can be a long time. Water to warm the words, the pipeline is 50 years of the package, as long as not a group of people did not have any damage.
- Q: Water tank plus electric heating tube to give warm when the heat source
- If you only use this water when heating, it is possible. But pay attention to the cycle
- Q: What is the basic task of heating engineering? The heating system is composed of some parts
- The basic task of heating engineering is to meet the needs of the heat load components: heat, heat, hot users
- Q: What is the difference between a warm water and a water separator?
- To warm the need to water separator, only the installation of heating pieces are different...
- Q: Air source heat pump how much money
- Different regions of the different vendors may have differences in the price, you can compare a few more, it is recommended to the regular store or large chain stores to understand.
- Q: Radiator parallel system how to take pictures
- The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
- Q: What kind of pipe is better to use, which is more used?
- Now do warm is basically more PEX tube
- Q: To warm the accessories 3 / 4m * 16 * 20 what meaning
- 1620-3 / 4 that side of the 6 sub-tube, the other side is 6 teeth
Send your message to us
Engineering Flooring For Flooring Heating
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1800 m²
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords