• Heavy duty steel scaffolding cup lock system with formwork scaffolding accessories System 1
Heavy duty steel scaffolding cup lock system with formwork scaffolding accessories

Heavy duty steel scaffolding cup lock system with formwork scaffolding accessories

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Brand Name:

AJ cup lock system

Model Number:

CS cup lock system



Material:

Q235 steel

Color:

dark red,orange,blue,silver(galvanized)

Type:

cup lock system

Surface treatment:

dip painted,galvanized

Certification:

SGS

Thickness:

2.75/3.0/3.2mm

Height:

100/1500/2500/3000mm/set

Diameter:

48mm

Technique:

CO2 arc welded

Application:

Cup lock system for inside and outside construction





Packaging & Delivery

Packaging Detail:Cup lock system is in bare package, loading in the container. A 20 GP container can load 26 tons of cup lock system.
Delivery Detail:10-20 days after deposit

Specifications

cup lock system 
1.For building construction 
2.Heavy duty 
3.CO2 arc welded 
4.Good performance

About us

   Our canpany was found in 1996.The workshops cover 31000 squaremeters,and we employed more than 360 well trained employees .our location is 10 minutes far away form LINYI airport, and 3 hour far away from Qingdao shipping port by car. we are a  professional manufacturer ofscaffolding ,ringlock system,cuplock system,shoring props,frame system,fences and barriers,scaffolding couplers,rapaid clamp and other related accessories.We also produce hand tools---Adjustable wrench Geartech wrench Surface rathchet Heavy duty Ratchet wrench.All of scaffolding systems produced according the standard of BS1139 and/or EN74.With strong R&D power and strict quality control system,our products passed the certification of ISO9001:2000.


Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
If the pole height is 5.345m, general 5.30~5.33m, general step according to the self set in advance, such as, 1.8m, 1.5m, and finally, according to the table look-up
Q: What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q: What's the film where gene Kelly dances on scaffolding? And at a gym?
I think it's Living in a Big Way.... I could be wrong...
Q: What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q: 21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q: I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q: hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q: Latch type disc scaffolding accessories is a national patent product
Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q: What is the service life of the mobile scaffolding accessories?
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share.
Q: What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords