• Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3 System 1
  • Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3 System 2
  • Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3 System 3
  • Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3 System 4
Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3

Scaffolding Coupler British Type Steel Galvanized Forged Swivel Coupler 48.3

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

1. Structure of  Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler  Description 

What is Swivel Scaffolding Coupler ?

Scaffolding Coupler is accessories of the scaffolding productions , it is usually made of Q235 steel material , The production technology can be forging or prssed  , With the development of the construction , Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler has beome more and more popular. 


Function of the British  Type Swivel Coupler 

Scaffolding Coupler British Type Steel Galvanized Forged Swivel Coupler used to connect two scaffolding tubes at any direction . The scaffolding coupler used to connect tubes and bulid hige woking towers .It can be used to 48.3mm tube or 48.3mm and 60mm tube  Every size avaliable . 


Advantage of  British Type Swivel Coupler

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Scaffolding Coupler British Type Steel Galvanized Forged Swivel Coupler 

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Scaffolding CouplerBritish  Type Steel Galvanized Forged Swivel Coupler images 

Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3

Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3

Scaffolding Coupler British  Type Steel Galvanized Forged Swivel Coupler 48.3


4. Scaffolding Coupler British Type Steel Galvanized Forged Swivel Coupler Specification 

 Raw Material: Q235

 Size: 48.3mm

 Weight:1.45kg

 Certifies:, EN 74 and OSHA

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Scaffolding CouplerBritish Type Steel Galvanized Forged Swivel Coupler 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Q: I want to know the classification of scaffolding in the building
Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
Q: Scaffolding installation and precautions?
The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.
Q: The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
Q: 21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: i was thinking of having it done. google it if you don't know what it looks like. but i can't handle pain too well, and as i've seen on youtube, its not nice lmfao, i know pain varies from person to person, but any ideas on how to like take your mind off it? im quite young and this is my first major piercing, i only have my lobes done twice;), and does anyone know a good place to find nice barbells once it's healed:)? thanks:)!aaand do you think this is a nice piece to put in once its healed?
Actually getting it pierced isn't all that painful, it's the couple of weeks after that might hurt...but as long as it's looking after properly (cleaned every day) all should be good. Sleeping on it can be painful, so i would suggest you get the side pierced that you don't usually sleep on. As for taking your mind off it, maybe take someone in with you while you get it done? then you can either talk to them to distract you or just squeeze their hand...also try not to look at the needle as this could just scare you, don't worry too much though, it'll all be over and done with in a few seconds and the pain really isn't that bad. As well as making sure you clean it every day, it's also important to make sure you're not playing with/touching it all the time as this could lead to an infection, always make sure your hands are clean before touching it. That industrial bar looks really nice, i would aim on waiting a couple of months before putting it in though maybe even about 4-5 months. Overall i think you should defiantly get it pierced the look really nice, good luck!! :)
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q: scaffolding business?
I don't think that it's a term for a specific type of business (like a pyramid scheme), but it's simply a business that sells/produces scaffolding. Scaffolding is a temporary framework used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes (termed tubes in Britain), although it can be made out of other materials. Bamboo is still used frequently in Asia.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords