Cup lock Scaffolding steel system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
color: |
Packaging & Delivery
Packaging Detail: | suitable for shipment |
Delivery Detail: | after deposit 10days |
Specifications
Cup-lock Scaffolding
Material:Q235
Surface Treatment:Painted
Name: Cup-lock Ledger Scaffolding
Referenced Number: AJ-B002A
Specification
1) Thickness: 2.75mm,3mm,3.2mm
2) Diameter: 48mm
Length & Weight (Standard)
3000mm / 15kg
2400mm / 12kg
1800mm / 9kg
1200mm / 6kg
600mm / 3kg
Length & Weight (Ledger)
1800mm / 6.9kg
1500mm / 5.9kg
1200mm / 4.8kg
900mm /3.7kg
600mm / 2.7kg
- Q:I'm not worried about the pain and whatever, but I've been told that it deforms your ear. I really like the piercing and want it pierced, but not if it's going to deform my ear. Will it?
- It can collapse your cartilage, if you get it done with a gun. If you go to a professional, and they do it with a needle, you'll be fine.
- Q:Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of? What is the difference
- But do not rule out this situation, as the difference between these two scaffolding
- Q:Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
- its normal aii your probaly slept on it just do a sea salt soak and you'll be fine but if your super worried go back to your piercer
- Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
- The scaffold is common in interior formwork support, generally in the plane projection matrix, identified in the upper load situation, through the relevant calculations to determine the vertical and horizontal spacing, vertical rod erection step rails to ensure the bearing capacity of the frame body.
- Q:From the book quot; The Scarlet Letterquot;
- He says not at thois time but that one day he will.
- Q:What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference
- The second is the external wall, the use of steel pipe scaffolding, such as structural decoration, which is divided into single and double scaffolding, double row with landing and cantilever. Single row are generally used for landing
- Q:I've been watching Japanese anime shows and some of them use a historical background. I would like to have a general idea of what is accepted history and what is alternate. For example; Tokyo was once called Edo. I don't know anything about Japanese history. I'd like to fill in this yawning chasm in my education.
- Spelling may not be right and I can't remember the author. Read it 50 years ago but the history should not change.
- Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- For flexural members:No combination of wind load for gamma 'm = 1.19Combination of wind load of gamma 'm = 1.19For axial compression member:No combination of wind load for gamma 'm = 1.59Combination of wind load of gamma 'm = 1.59
- Q:If the guillotine operator walked away from the scaffold where would he be headed?
- I see what you did there.
- Q:Bowl buckle scaffold construction needs to pay attention to what problems
- Between the outer edge of the scaffold and the overhead line must be kept safe operating distance, to maintain not less than 4.5m, or the need to add additional barrier protection measures. ?Lightning protection set by 12 round steel and building lightning protection column and reliable welding, weld length not less than 6D, the grounding resistance shall not more than 30. The lightning protection of the scaffold is closed to the ring welding set, and the four angle is connected with the rib.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup lock Scaffolding steel system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords