• Scaffolding Formwork Joint Pin System 1
  • Scaffolding Formwork Joint Pin System 2
  • Scaffolding Formwork Joint Pin System 3
Scaffolding Formwork Joint Pin

Scaffolding Formwork Joint Pin

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
L219-44
Unit weight:
0.5-2.8kg
Processing:
Drop forged
Raw Material:
Q235 cardon steel
Certifies:
BS 1139, EN74 and ISO9001:200,AS1576
Surface treatment:
Hot dib galvanized or electro galvanised or painted
Coupler type:
German type Swivel Coupler
Marketing:
Worldwide

Packaging & Delivery

Packaging Detail:Woven plastic bags and iron tray,by sea,standard
Delivery Detail:1month after advance payment,or as requirments

Specifications

1. Raw Material: Q235;

2. Drop Forged;

3. Pipe diameter: 48.3mm or as per your requirements;

4. Certifies: BS 1139, EN 74 and ISO 9001: 2000;

5. Surface treatment: Electro galvanized, Hot dip galvanized, or painted;

6. Package: woven plastic bags and steel trays.



Q: Exterior wall scaffold construction plan?
Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: 21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q: Scaffolding scaffolding erection norms which requirements, who can say?
Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards
Q: Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
3.1.2, clearly defined the quality requirements of fasteners, so you can use fasteners
Q: What are the common rules for calculating the amount of scaffolding works
The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
Q: Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q: i was thinking of having it done. google it if you don't know what it looks like. but i can't handle pain too well, and as i've seen on youtube, its not nice lmfao, i know pain varies from person to person, but any ideas on how to like take your mind off it? im quite young and this is my first major piercing, i only have my lobes done twice;), and does anyone know a good place to find nice barbells once it's healed:)? thanks:)!aaand do you think this is a nice piece to put in once its healed?
I okorder for barbells. They have some pretty epic lightnight bolt ones and zigzags and they are like 3 bucks!!!! You can never find them in the mall like that :P lol. Anyway, i deff. think you should get the piercing. It's worth the pain. It'll be over in 2 seconds lol. Good luck :D
Q: I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q: Rather than buy tensile steel rods to reinforce concrete I wonder whether I can effectively recycle scaffold tubes that are presently on my roof.
inthisall.chills.it A very informative website, kindly stay a minute in website and enter you email address for getting your answer.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords