• Climbing Frame boiler scaffolding for construction System 1
  • Climbing Frame boiler scaffolding for construction System 2
  • Climbing Frame boiler scaffolding for construction System 3
  • Climbing Frame boiler scaffolding for construction System 4
  • Climbing Frame boiler scaffolding for construction System 5
  • Climbing Frame boiler scaffolding for construction System 6
Climbing Frame boiler scaffolding for construction

Climbing Frame boiler scaffolding for construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 m.t.
Supply Capability:
5000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

The leading boiler scaffolding manufacturer in China which possess of national patent of boiler scaffolding (Patent No: ZL 01 218702X).

With 15-year experience and latest computer aided design technology, we can make special design and products according to the boiler’s specification and requirement.

    Our boiler scaffolding systems are widely applied to many power stations and get good reputation with fast, safe and efficient features.

 

Competitive Advantages:

 

>Complies with International Safety Standards of BSEN 1004:2004  

>Lightweight and high tensile aluminum alloy tubs and castings weighing as little as one   fifth of an equivalent steel system  

>With simple interlock system ensuring trouble-free Installation with no welding or tools required  

>With the foldable units module ensuring fast erection, e.g.: about 25 hours for the boiler installation of a 500MW  

>With the diversified foldable units making sure of functional uses  

>Significant revenue savings with less down-time and lower fixed costs  

  For instance, for a 600 MW power plant, if it costs RMB 0.18 per degree of  electricity in China, and it can save about 40 hours downtime with Kangde Aluminum Scaffolding , so a power plant can save cost in a overhaul work as the following :
   40 hours* 600MW/h*0.18RMB/degree=RMB4.23million =USD630,000

>High durability and stability with no maintenance required  

>Technical support throughout the project stage from design to installation  

>With 15-year experience in design, production, sales and technical support as well as after-sale service. 

>With recorded experience in the design, production, sales and technical support as well as after-sale service for more than two hundred boiler access systems. 

>With the high tensile unique tube specially for cold-formed joint system ensuring 20-year longevity Warranty

Parts of Performance list for Electric Power Station Boiler Aluminum Scaffolding

Draft tube scaffolding for Pengshui Hydropower Station of Datang International Group
Draft tube scaffolding for Chang River Electric Power Limited Company
Boiler scaffolding for Fengzhen Power Station in Inner Mongolian
Boiler scaffolding for Jiujiang Power Station in Jiangxi

Boiler scaffolding for Erdusi Power Station in Inner Mongolian
Boiler scaffolding for Datang Tuokrtuo Power station in inner Mongolian
Boiler rush maintenance scaffolding for Daihai Power sastion in inner  Mongolian
Boiler scaffolding for Panshan Power station

Boiler scaffolding for Haerbin Third power station
Boiler scaffolding for Huaneneg Qinbei Power Station

Q: What issues need to pay attention to the construction of high-level scaffolding
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q: What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
Q: Which kind of scaffolding is the most convenient and time-saving?
3, low cost (can speed up the construction schedule, shorten the construction period), large spatial scaffolding in the same condition, the new building quick dismantling scaffold material ratio of bowl type multifunctional scaffold, the same specifications of single member weight than the bowl type multifunctional scaffolding light.
Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q: there is also shrubs and trees planted on the base of the wall and 14 feet from it
you should have thought about all this before you bid. Now it`s your problem
Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance
Q: Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
concentration your interest on who's on the scaffold, how they react to the regularly occurring public shaming, and what the reader learns with regard to the character from examining the define of them on the scaffold.
Q: 1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q: ..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q: Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords