• formwork steel cuplock scaffolding System 1
  • formwork steel cuplock scaffolding System 2
formwork steel cuplock scaffolding

formwork steel cuplock scaffolding

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Thickness:
12-18mm
Inspection:
With Hydraulic Testing, Eddy Current , Infrared Test
Standard:
BS EN10025,JIS G3444-2006,GB/T 3091-2001, ASTM A106-2006, API 5L
Material:
Q235,Q345
Certificate:
SGS,BV,CE,ISO9001:2000
Delivery time:
Within 25 days
Surface treatment:
Painting, zinc plate, or Hot-Dip Galvanized
Packaging:
Pallet

Packaging & Delivery

Packaging Detail:Pallet package or in bulk according to your requirements.
Delivery Detail:Within 15-20 days after receiving your deposit

Specifications

1. formwork steel cuplock scaffolding
2.Professional manufacturer
3.Certified by SGS,BV,ISO
4.Timely delivery

Specifications

Ringlock component

Specification (mm)

Weigtht (kg)

Material


Standards with Spigot

500

3.09

Q235/Q345

1000

5.49

1500

7.90

2000

10.30

3000

15.11

3500

17.51

Ledgers

750

3.20

Q235

1000

4.07

1065

4.31

1200

4.78

1500

5.88

2000

7.56

2200

8.30

2500

9.35

3000

11.13

Ladder

3000

17.80

Q235

Braces

750x2000

9.18

Q235

1000x2000

9.47

1500x2000

10.31

2000x2000

11.40

2500x2000

12.67

3000x2000

14.06


H frame & L frame scaffolding

1)Size 1219X1700mm or 1219*1930mm,1350*2000mm,1350*2500mm,

     1350*3000mm

2)Material Q235 or Q345

3)Finished painted or galvanized ,powder coated

4)Tube size 42mm*2.0mm and 25.4mm*1.8mm

5)Weight 18.5kg. 13KG

6)4 feet x 6 feet or other size can be done also.


Q: Single double scaffolding distinctionPlease list the sketch map
Single row scaffolding -- only a row of pole, one end of a short bar on the wall. Use the scaffolding scaffolding double row scaffolding consisting of two rows from the outside pole and longitudinal and transverse horizontal bar (low grade can not add pictures). Double row scaffolding generally used for masonry masonry bearing to throwing cement brick. The single row scaffolding for internal wall plastering, paint brush, do not need the single row bearing engineering scaffold to pole support against the wall
Q: Bowl buckle scaffold theory weight table who has, the distance is how much?
The main structure of the construction of the use of scaffolding scaffolding most of the scaffolding, the vertical pole of the scaffolding is generally 1.2~1.8m; transverse distance is generally 0.9~1.5m.
Q: Floor type scaffolding construction program is what kind of, what role?
The role and requirements of scaffolding:1, the role of scaffolding:(1) operating platform(2) stacked materials(3) short distance transport
Q: I had my scaffolding piercing 2 days ago, but I was just wondering how long it will take for the swelling to go down? I know because it's a double cartilage piercing, it is likely to take longer to heal and such, but I was just wondering if there was an average time before it goes back to normal?
Mine took about a week, but only the first 4/5 days were really bad. Taking something with ibuprofen or anything meant for swelling or an anti-inflammatory should help :) Don't try ice though, that just made it worse for mine.
Q: So I'm going to get a scaffold/industrial piercing, and I had a few questions:-does your ear have to be a special quot;shapequot;? Like I mean does you outer ear cartilage rim have to stick more so it can be pierced?My outer cartilage rim is a little flat but it still sticks up -Would this make my piercing reject?Thanks! :)))
Ummm I think it does have to be a certain shape because when I got mine my piercer said she had to check if I had the right kind of ear.
Q: Hi my next door neighbours are building an extension to their house. The builders asked if we would allow scaffolding to be placed on part of our driveway. Now, these builders are taking too long and the builders attitude is rude when questioned how long they gonna take to finnish. If we want the scaffolding to go, what righs have we got as we gave verbal permission to the builders to have it put up by scaffolders and the planned extension not yet completed?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q: a. Climb the stairs to join Hester and Pearl. b. Give an encore sermon. c. Reveal the meaning of life. d. Rise Up to heaven.
e. do his own homework Only joking. It's definitely d. Or c.
Q: What were Hester's three appearances on the scaffold?1 was prosecution and another was dimmesdale's death and confession. What was the third?
The Scarlet Letter is regularly taught at the high school level, but surely this is a mistake. The novel is difficult and challenging even for honors students. The architectured sentences, with their points and counterpoints, their parallel construction, their old school rhetorical cadences are strange and even wondrous to the modern eye. It is a good practice for the teacher and for the student to read aloud Hawthorne's prose so as to grow accustomed to his words the way one must for Shakespeare. If this is done and the edifice of Christianity and especially the fatalism of the Puritan mind brought to bear, then with leisurely pace and a steady concentration, the terrible beauty of Hawthorne's novel might be made immediate. s
Q: In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
JGJ231-2010 construction of socket type plate type steel pipe scaffold safety technical regulationsTechnical code for safety of JGJ162-2008 construction formworkJGJ166-2008 technical code for safety of steel tubular scaffold with bowl buckle
Q: So a week ago today I got my industrial pierced. The pain was what I expected and afterwards it was very sore (as expected) however a week later it is a still rather sore and swollen and (I hate to be disgusting) quite crusty with dried blood/yellow stuff. I clean it everyday with salt water solution but I was just wondering if this was normal or should I take the piercing out?
That's normal! It'll be sore like that for a month or so.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords