• galvanized scaffolding ledger blade best quality System 1
galvanized scaffolding ledger blade best quality

galvanized scaffolding ledger blade best quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:

YN-Cuplock-B003





Material:

Q235 or Q255 or Q345

Surface finish:

Zinc plated, HDG, painting

Packing:

In pallet or in bulks

product:

scaffolding ledger





Packaging & Delivery

Packaging Detail:In pallet or in bulks
Delivery Detail:with 20 days after signing the order

Specifications

cup lock scaffolding 
1.material: q235 or q345 
2.surface finish: galvanized or painting 
3.OEM is offered 
4.High strength

Top cup

1. Material: Q235, Q255, Q345

2. Surface treament: painting or  hot-dip galvanized 

3. Elements: vertical, ledger, diagonal, top cuo, bottom cup and ledger blade

4. High strength bearing capacity

5. OEM service  as available

6. Inspection: by ourselves or by SGS,or B.V,or others. 

7. Samples are available.

(1)   Formwork System Scaffolding & Accessories:

 

 Wing nut and Tie rod; Steel panel and so on.

 

 (2)   Scaffolding System & Accessories:

 

 Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories.

 

 (3)   Adjustable Scaffolding Jack Base & Accessories:

 

 Including Hollow Screw Jack Base, Solid Screw Jack Base and Swivel Adjustable Screw Jack Base; Also the Accessories we can produce.

 

 (4)   Adjustable Steel Shoring Prop and Scaffolding Frame & Accessories :

 

 Adjustable Steel Shoring Prop Including light-duty and heavy-duty,the type of base plate: flat-plate, flower-plate, u-head and cross-head. Scaffolding Frame including walk-through type, h type and mason type. We also produce all the accessories about them.


Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Crossbar HG-30 3001.67HG-60 6002.82HG-90 9003.97HG-120 12005.12HG-150 15006.28
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Standard for inspection of portal scaffolding
The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
Q:Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
Helix will be less painful. It's kind of obvious that it would be a helix is probably one of the easiest piercings you can get I got mine done when I was like 13 and I didn't even flinch getting it done. A scaffold is definitely more intense. After all there are 2 incisions for this piercings so it's gong to be twice as tough. It's sore haling too, the bar is awkward and when it moves it hurts. A helix is far easier :)
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q:Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:What are the dangers of scaffolding
The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:Which loads are considered in the design of the scaffold
The load of the scaffold can be divided into permanent load (constant load) and variable load (live load).The permanent load of the scaffold shall contain the following contents:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords