• scaffolding Casting Steel Ledger End System 1
scaffolding Casting Steel Ledger End

scaffolding Casting Steel Ledger End

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging & Delivery

Packaging Detail:Rn:Hing bags ply woodcases
Delivery Detail:25DAYS

Specifications

Scaffold Cast Steel Ledger Brace End
1.Material: Cast Steel
2.Weight:0.5kg
3.Surface treatment: self color or Zinc Plated

manufacture ISO SGS CE
Materials:casted,carbon steel
Surface:electroplated,black
type:pressed,forged
Weight:0.45kg-0.7kg

Casting Steel Ledger End

Advantage of  ringlock scaffolding ledger end:

1.It can be achieved above 20 years for using age after dipping galvanized for all the component

2.Low cost and high efficiency. Less basic component and new designed, it can be saved the cost when it is installed and torn down.

3.High strength steel, rational design of mechanics,the maximum load capacity can reach the 200KN.

4.It can save above 2/3 steel compare with the cup lock scaffolding.

5.One person can finish to put up and to tear down the treads. However, it needs the 2 to 4 person to do it with the crane.

6.Supply the safety and high efficiency scaffolding construction scheme for customers.

7.Supply the scaffolding designing scheme for the construction units.

8.Safe and reliable. It has the self-locking function for the plug, can be locked after pressing and torn down after pulling out. Because the touching are is big between the coupler and standard, to improve the bending resistance for the steel pipe, so that standard won't appear the skewed. Compare with the cup lock scaffolding, the ring lock scaffolding is more stabilize.

Accessories of ringlock scaffolding ledger end:

Wedge pin, ring plate, standard, ledger, diagonal brace, bracket, base collar, diagonal head, pin transom head

Basic information of ringlock scaffold accessories:

Product

ringlock scaffold accessories

Material

Q235 carbon steel, Q345, Q195

Surface treatment

Electronic galvanized, hot galvanized and print

Color

Red, blue, yellow, green, bright galvanized

Package

Steel belt or iron plate/Customized

Accessories

wedge pin, ring plate, standard, ledger, diagonal brace, bracket, base collar, diagonal head, pin transom head

MOQ

100pcs

Delivery detail Payment

10-25 Days After Receiving The Deposit & Confirm All Information

Payment Standard

30% deposit by T/T, pay for the balance when product is shipped from factory

Standard

EN74/ BS1137/ JIS

Production capability

50000 pieces/month

Packaging & Shipping

Packaging:  Steel belt or iron plate for ringlock scaffolding ledger end /Customized

Shipping:  30% deposit by T/T, pay for the balance when product is shipped from factory

Application of ringlock scaffolding ledger end:

1.High-rise residential, commercial buildings, industrial buildings.

2.As well as special factory supporting design, which includes the general viaduct bridge engineering, tunnel engineering, workshop, elevated water tower, power plants, refineries, etc.

3.Applicable to the flyover, span the scaffolding, storage shelves, chimney, water tower, indoor and outdoor decoration, large-scale concert stage, background frame, the stands, balcony, stair system, the party stage set-up, sports stadium and other engineering


Q: i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
go the the dr or you piercer
Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q: Which God can tell me what is required, how to get ah?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
Q: Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis
Q: In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.
Q: This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords