• Cuplock scaffolding system  cuplock scaffold parts System 1
  • Cuplock scaffolding system  cuplock scaffold parts System 2
  • Cuplock scaffolding system  cuplock scaffold parts System 3
  • Cuplock scaffolding system  cuplock scaffold parts System 4
  • Cuplock scaffolding system  cuplock scaffold parts System 5
  • Cuplock scaffolding system  cuplock scaffold parts System 6
Cuplock scaffolding system  cuplock scaffold parts

Cuplock scaffolding system cuplock scaffold parts

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Cuplock scaffolding system  cuplock scaffold parts  

 

1)Material: Q345 

2)Surface treatment: hot dip galvanized 

3)Tube size: 48.3mm *3.25mm

4)manufacturer

 

 

Feature of Cuplock Scaffolding:

 

 

(1) Easy assembly, time and labor saving. 


(2) High load-carrying capacity.

 

(3) Adaptable to various construction projects.

 

(4) All elements safely connected

 

(5)Highly durable

 

 

 

 

 

Name

 

Cuplock scaffolding system  cuplock scaffold parts

Place of Origin

Shandong, China

Main Material

Q345

Surface Treatment

Electric Galvanized, Hot Dip Galvanized, Painted.

Certificate

EN74

Service

OEM Service available

MOQ

1000pcs

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

In bulk or steel pallet or as your request

Production capability

15 containers/month

 

 






OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest



Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

All products are manufactured under stringent in - house quality control plansAll products strict quality inspection, all the raw materials are inspected before use, the product must be tested before leaving the factory.




Q: What issues need to pay attention to the construction of high-level scaffolding
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
Q: i just got it like 3 days ago and its no signs of infection and im just worried it might get that way. ive been reading online about people who got infections and people who had all this crap happen. what do i need to do to stop one from coming i mean i use contact solution and cotton swabs wipe it down with wet ones and clean it when i sweat and turn it twice a day.. im always careful about keeping it clean im a neat clean freak but is there anything else i can do to stop infection from coming
Keeping it cleanis the only thing you really can do. Insteas of contact solution you could use a non iodized sea salt soak (1/8 teaspoon of sea salt to 8 oz of warm water). But you are going to want to stop spinning it. Spinning it could rip your fistula and prolong the healing time of the piercing
Q: Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: It's when u get two ear piercing and there connected by a tongue ring. So question is where can I get it and how old? I'll be gettin it in Rhode island . Please anwser
I have one and im 12. Im from Tennessee.
Q: This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords