• Cuplock scaffolding system  cuplock scaffold parts System 1
  • Cuplock scaffolding system  cuplock scaffold parts System 2
  • Cuplock scaffolding system  cuplock scaffold parts System 3
  • Cuplock scaffolding system  cuplock scaffold parts System 4
  • Cuplock scaffolding system  cuplock scaffold parts System 5
  • Cuplock scaffolding system  cuplock scaffold parts System 6
Cuplock scaffolding system  cuplock scaffold parts

Cuplock scaffolding system cuplock scaffold parts

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Cuplock scaffolding system  cuplock scaffold parts  

 

1)Material: Q345 

2)Surface treatment: hot dip galvanized 

3)Tube size: 48.3mm *3.25mm

4)manufacturer

 

 

Feature of Cuplock Scaffolding:

 

 

(1) Easy assembly, time and labor saving. 


(2) High load-carrying capacity.

 

(3) Adaptable to various construction projects.

 

(4) All elements safely connected

 

(5)Highly durable

 

 

 

 

 

Name

 

Cuplock scaffolding system  cuplock scaffold parts

Place of Origin

Shandong, China

Main Material

Q345

Surface Treatment

Electric Galvanized, Hot Dip Galvanized, Painted.

Certificate

EN74

Service

OEM Service available

MOQ

1000pcs

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

In bulk or steel pallet or as your request

Production capability

15 containers/month

 

 






OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest



Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

All products are manufactured under stringent in - house quality control plansAll products strict quality inspection, all the raw materials are inspected before use, the product must be tested before leaving the factory.




Q: Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q: How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q: Fastener type steel pipe scaffold accessories
fastenerFastener type steel pipe scaffold fastener malleable iron casting should be adopted, its basic form has three kinds: vertical cross bar for a connection between the rectangular fastener, fastener for rotating connecting parallel or oblique bars and rods for butt joint butt joint fastener.
Q: What are the characteristics of Pankou scaffolding
Pankou scaffold has the advantages of low cost and high efficiency of the hitherto unknown advantage. Comprehensive consideration of the company's future worries, no need to worry too much about frequent accidents, high cost of substantive issues.
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
Q: hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
i heard from people after a year an industrial still hurts and they usually have to take them out

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords