KLU32-800 Bored Pile Drilling Rig for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
KLU32-800 Bored Pile Drilling Rig for Sale
Product Features:
A Wide Choice Of Product: |
>>Our company is capable to manufacture various types of KL series drilling rigs. The max drilling depth could reach 20m to 34m.A wild range of products could be chosen for your practical needs. |
The column of the piling frame has two types, square and round. The former type applies back lift method. It is easily installed, safe and stable. The later type applies front lift method, the support rod will adjust itself when lifting the column. The column is higher, the drilling depth will go deeper. |
|
Higher Efficiency And Lower Consumption: |
>>The hydraulic system uses constant power variable design with low loss.The large flow, low failure rate, and high efficiency piston pump ensures the hydraulic components working well. |
|
high Reliability And Flexibility: |
>>The rotation system works with hydraulic flow. The rotating speed could be controlled to avoid impact. The failure rate is much reduced. The assistant hoist also uses hydraulic winch so the winding speed can be controlled at the operator’s will. Such design provides much convenience in the working process. |
|
Convenience In Dismantling, Transportation And Maintenance: |
>>With many years improvement and seeking for perfection, each part of the machine has well considered its convenience in dismantling, transportation and maintenance. The height and width of the largest part is designed within the range of transportatio lmits. |
|
Humanized Design: |
>>Much effort has been taken to increase the technical content on our products as well as humanized design. The machine is integrated with mechanical, electrical, hydraulic, and electronic devices. The appearance of the machine body, the comfort of the operator, the agility of the movements and so on are all well considered when designing the machine.Remote-control handle is optional due to the client's needs. |
|
Unique Design: |
>>After many years of experience in manufacturing the machine and analyzing feedbacks from our loyal clients, we made unique improvements in the easy-malfunction parts on the drilling rig: The bottom pillar of the column uses universal joint to enable the pole adjusted from left-right and front-back directions. The side support adjustment mechanism uses hydraulic motor instead of electrical motor which may affect the adjustment stroke or worm and gear which may shorten the life period. The supporting leg cylinder base uses large round box structure to avoid distortion at the working process. |
|
Multi-function: |
>>KL series is our new generation multi- function piling frame: with different power plant it can not only be used to do bored pile drilling or construct continuous wall by SMW method, but also do diesel hammer or hydraulic hammer pile driving. |
KLU32-800 | ||
---|---|---|
Move method | Electro-hydraulic step | |
Max drilling depth | 32m | |
Max drilling diameter | φ800 | |
Max output torque | 65KN·m | |
Rod rotated speed | 18r/min | |
Allowed lifting force | 640KN | |
Power for power head | 55KWX2 | |
Reductor of power head | ZZSH480 | |
Leader size | φ630X10 | |
Leader height | 37m | |
Leader oriented center distance | 600Xφ102 | |
Leader incline range | 5°front inclination 3°back inclination | |
Length of crawler on the groud | 4.3m | |
Width of track plate | 800mm | |
Climbing ability | <4° | |
Rotary | Rotary way | Rotary motor |
Rotary angle | ≤360° | |
Rotary speed | 0~0.3 | |
Main winch | Single pulling force | 7T |
Increasing speed | 1.8/2.2/2.6 | |
Motor power | 22KW | |
Assist winch | Single pulling force | 3T |
Increasing speed | 20m/min | |
Motor power | 11KW | |
Overall dimension(L*W) | 11.5m×6m | |
Total weight(T) | 78T |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q:How much is piling foundation for pile driving machine?
- A pile driver in Hunan Huilong domestic piling machine is relatively good, driving speed is very fast, with less, the most important is the customer service service is very good,
- Q:What safety measures should be taken when assembling a pile driver?
- 4, mechanical equipment installation and transportation safety mattersThe mechanical equipment should be installed in a safe place, not in the rock slope landslide, or may be installed by flood invasion and flying stone in place, to ensure personal safety and machinery.The room layout shall be constructed according to the mechanical instructions or actual needs. Room to ensure mechanical windproof and rainproof, antifreeze and other requirements, to the appropriate area, convenient operation and maintenance, and adequate lighting, good ventilation, shutdown protection facilities for temporary use of machinery should be necessary.Mechanical equipment shall be installed according to the instruction manual and relevant regulations. After installation, safety inspection and performance test shall be carried out, and may be put into use after the test operation has been qualified.When the mechanical equipment is transported, make sure the binding is firm, the center of gravity is reliable, the brake is reliable, and the traffic safety is ensured.When mechanical equipment is unloaded, be sure to handle with care, forbid to throw and throw off from the car, use dump truck to transport machinery, forbid dumping with dumping method.
- Q:What machinery is suitable for a PV pile driver?
- Are you talking about a small hammer pile driver for excavators? If you are playing a photovoltaic pile (hollow pipe pile) below 9 meters, you can use the north Yi Machinery BY-YH250 model of small hammer piling machine, installed on excavators.
- Q:What are the characteristics of hydraulic static piling compared with traditional pile driver?
- No nuisance, you can work in the downtown area
- Q:What are the requirements for lime mud piling machine?
- On the whole, the more sticky the better, but some places are not so good, economically speaking, just take it. I'm a driver of the piling machine. Contact me if you need me
- Q:What does a driver of a pile driver do? Playing in the sky?
- To serve as the foundation of the buildingThere are many types of pile driversThe operator works in the ground operating room
- Q:My family is in the countryside, and now more than 100 meters behind the house in the pile is the kind of shock, our house is built in 99 years, has been very good. Since the piling, I have been shaking the door, the construction party every day for more than 8 hours, has been more than 10 days, and now I have a lot of cracks in the floor. What's the influence of our family, please? Are there any rules for investigating what should be done before piling?
- The best co-ordination, not to consult the Construction Planning Bureau
- Q:How many hydraulic pile drivers or diesel pile drivers are used in high-rise residential buildings?
- The pile foundation of high-rise building usually adopts precast pipe pile and seldom uses cast-in-place pile.
- Q:Under the high voltage line, within two meters on both sides, no pile driver shall be installed
- In case of special circumstances, the safety technical measures must be taken and the installation can be installed after the approval of the higher technology supervisor.
- Q:Do you make money on building pile drivers? How long will it take to recover the cost?
- To be honest, no money, no problem, it's hard to have a client.My father worked as an electrician at the construction site for three years. I just asked him.Of course, you have connections, and you won't do it.The most crucial thing is the network, there is a market, that thing good, tens of millions, smashing hands, crying dead.Sure, you have connections, when I don't say..
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
KLU32-800 Bored Pile Drilling Rig for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords