• Durable, Firm, High Density  WPC Door Frame System 1
  • Durable, Firm, High Density  WPC Door Frame System 2
  • Durable, Firm, High Density  WPC Door Frame System 3
Durable, Firm, High Density  WPC Door Frame

Durable, Firm, High Density WPC Door Frame

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
8 m.t.
Supply Capability:
200 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1> What is High Density  WPC Door Frame?

 

WPC, simply for wood plastic composite.

Wood Plastic Composite is made from a unique combination of plant fiber and recycled plastic

according to high-tech formula.

It offers the best advantages of plastic and wood. The plastic shields the wood from moisture and

insect damage, and the wood protects the plastic from UV damage and gives you a natural feel.

It has characteristics of high strength and rigidity, acid and alkali resistance, corrosion resistant

and without formaldehyde, it is a real green environment protection building material.

 

2> Why choose High Density  WPC Door Frame?

 

 Natural colour
 Resistance to water, rot and crack
 Guaranteed to last
 Low maintenance
 Beautiful and broad range of finish

 

3> What are the main kinds of High Density  WPC Door Frame currently?

Door frame

Wall panel

Skirting

Wardrobe door panel

 

 

 

Product Description of High Density  WPC Door Frame

 

 

 

4> Specification of High Density  WPC Door Frame?

 

Characteristics

WPC

Wood

Moisture Resistance

Waterproof

Water absorptive

Rot Resistance

Antisepsis

Rot except special treating

Split Resistance

No Cracked

Cracked by weathering effect

Distortion Resistance

Almost no Contraction/expansion

Distorting effected by chang of 

moisture and temperature

UV Resistance

High Grade UV Resistance

Easily effected by UV

Fading Resistance

Almost no

Easy to fade

Outdoor adaptability

Great

Only few of treatedowood adaptive

No need painting

No need

Need paint periodically

Durable/longevity

> 8-15 years

< 3 years< span="">

Various Configuration

Extruded via various mould

simplex

Environment Effect

Recyclable 100%

Consume woods

 

 

 

 made in china best selling wpc door frame

 

 

 

Company Information

 

 

 

5> About CNBM and It’s High Density  WPC Door Frame

 

China National Building Material Corporation (CNBM), long history since 1984 is one of the top 
fortune 500 corporation and central enterprise with total assets of more than $20 billion and 
120,000 staff. 
 Our unique advantages: 
 Preferential payment terms 
 good and reasonable price 
 quality guarantee -- CNBM won't let a single small deal ruin our reputation and brand, so quality is

 our lifetime. 
 professional team for CRM order processing & QA & logistics 
 global logistic database, originated from Dubai

 

 

 

 

 

Packaging & Shipping

 

 

 

6> How to buy and concerned terms


MOQ – 800m per item 
Lead time—2 weeks 
Departure port—Shanghai 
Package-- PE film, carton box or 2pcs.bundle, treated pallet

 

7> Certificates and Quality guarantee

Certificates – CE&ISO 9001 complied 
Warranty—10 years 
Quality guarantee—test report for each order under the strict management system

 

Q: The installation method of color steel activity room
① Before installation, the construction unit shall check the product certificate, design document and pre-assembly record of the component, and check the size of the recording component. Deformation of the steel structure, defects beyond the allowable deviation should be processed. Before installation, should be prepared in detail the measurement and correction process, thick steel plate welding should be installed before the simulation of the product structure of the process test, the preparation of the corresponding construction process. On the assembled roof truss should be a certain degree of arrogance. ② steel structure hoisting in place, the component positioning axis, elevation and other design requirements of the control point to do a good job marking, the quality of the lifting connector for welding before the inspection. Installed temporary support and steel cable to make steel roof truss in the construction process safe and stable. ③ steel installation, the construction unit should be submitted to each component after lifting the elevation size, welding, painting, etc. were submitted to the supervision and acceptance.
Q: Plastic window GB8814-88 what it means
GB8814-88 is the implementation of standards
Q: What is the gap between the window and the wall?
The window to install playing foaming agent, hole and window frame around the gap should be left in the 2 cm or so, the gap is too small blowing agent is difficult to hit into the gap is too large blowing agent and difficult to play the role of sealing, and then The gap is too large will affect the appearance. If you have more questions, you can click on ID consultation.
Q: Plastering and doors and windows installed in the order
Usually first fitted with a door cover and window cover, and then plastering the wall, then install the door and window.
Q: Would you like to be able to paste mosaic?
Most of the southern region can paste mosaic, the problem is not big!
Q: Rough room provided by the heat of the aluminum alloy doors and windows frame color is dark green, hoping to change to white or black. Do not know what method can be achieved? 1, paint? Will it fall off? 2, see someone online that can change the color foil, do not know what kind of film? More
First of all, I would like to know, you are not to change the color under the window and then, if so, you can re-processing the surface of the multi-profile, if not, feel difficult to paint, 135 + + + + + + "that kind of paint do not know okay
Q: My side of the wall paint 5 years of the top there are cracking the place, I want to shovel them to re-brush latex paint, but the floor of the floor I do not want to move, afraid of the construction of the workers when the workers hit bad, how can I do? Question added: the home there are a lot of furniture, it can not move, the bedroom bed closet, the living room of some have, how can I protect up ah. More
Buy some shock film (or use the largest trash bag), shop on the floor, the corner of the place with the US pattern paper sticky on the line, the earthquake can be sold in the sale of wood flooring place, foot line and doors and windows The edge of the box can be used to cover the wall of the United States and the United States, the United States and paper is easy to peel off, do not damage the surface of the object, it will not leave marks. There are furniture, then you can use the old sheets or large plastic sheet cover up, compared to the old bed sheets easier to use, plastic more easily due to static and soil.
Q: On the provisions of stainless steel railings weld
There is no rigid rules on the seam on the welding, no seam as little as possible welding, solder joints small
Q: Rough leveling how to use?
Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
Q: Doors and windows should be used to set aside the hole to install, do not use the edge of the installation side of the mouth or the first installation of the construction method What is the meaning, which can explain in detail
Doors and windows should be used to set aside the hole to install: refers to the first wall when the doors and windows to set aside, to the late installation; side installation side of the mouth or the first installation of the mouth: refers to the wall in the process of putting windows and doors

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches