• CMAX Tower Crane TC 7034 Construction Machine System 1
  • CMAX Tower Crane TC 7034 Construction Machine System 2
  • CMAX Tower Crane TC 7034 Construction Machine System 3
CMAX Tower Crane TC 7034 Construction Machine

CMAX Tower Crane TC 7034 Construction Machine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
12t
Maximum Lifting Height(M):
200m
Rated Loading Capacity:
12t
Span:
70
Rated Load Moment:
12

CMAX Tower Crane TC 7034 Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.







FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q:we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q:Flocks of cranes shout'. Is it right to use the word'shout' here?
If that's what it sounds like, sure.
Q:I am writing a story for school about working in Dubai as a crane driver but I need to know what the purpose of a Crane driver is, how much they get payed and stuff like that. And if you could tell me how a crane driver can get admission in the first place, it would be really great. Thanx. And btw, this story is for Geography.Thank you. :)
i am not a crane driver myself , but into this field of construction . get a licence as driver from authority just as a car driver. know how to drive the crane ad a driver know how to operate a crane as a operator. know the performance of the crane and its limits. the salary can vary depending on the type of crane and its special features. but not in the high end grade for sure unless its a very specialised crane operation. u can ask any thing more .
Q:What are the safety devices for tower cranes?
(3) the lifting height limiter, lifting height limiter is used to restrict access to the hook jib head or trolley before, or is dropped to the lowest point (ground or below ground Ruoganmi) before the lifting mechanism of automatic power-off and stop working, to avoid lifting hook over hoisting device touch the boom and the bad.(4) the amplitude limiting device is used to limit the boom does not exceed the limit position in the pitch. An alarm is sounded when the lifting pitch reaches a certain limit, and the power is automatically cut off when the limit position is reached.(5) stroke limiter of car stroke limiter: a trolley type jib head and root, to cut off the circuit car traction mechanism, prevent car offside. Cart travel limiter: used to prevent the crane from derailing.
Q:Romney woulda had that thing fixed by now.
It never ceases to amaze me. As Americans we scream and cry about the deficit and wonder why our president has not sent a work crew to fix a crane in NYC. These very same Americans suggest that our President is leaving the broken crane in New York to remind people of the atrocities done to the black Americans in our country. Really, nothing surprises me anymore.
Q:Since now everyone will know what's coming when you get in the crane kick position, and the element of surprise is gone, has the crane kick become an extinct move? Do martial arts experts not like the Karate Kid for ruining the crane kick in the way magicians don't like other magicians who reveal their secrets?
Ummmm, assuming this is serious, the Crane Kick was basically made up for the movie. And it wasn't some magical technique, anyway. A guy standing on one leg really only has so many options available. That's why you never actually see anything like that in real competitions.
Q:Is there a crane lifting chart where I can enter info. to determine what size crane I need, if so where?
Sorry, it's not quite that simple.
Q:My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
Q:Or what style? ?
I okorder / Gung Gee Fook Kuen: Taming The Tiger Fu Hok Sueng Ying Kuen: Tiger and Crane Double Form Tiet Sin Kuen: The Iron Thread
Q:Some of my friends are trying to see what is the most creative, yet still meaningful way to ask a girl to prom. I decided to use 1000 origami cranes, and for those who don't know, the meaning (in Japanese lore) behind 1000 cranes is that the maker gets to make one wish, and its also traditional to give them to someone to wish happiness and prosperity upon them.
i think of it sounds large! ik i could like it if my crush did that! yet 1000? thats a good type of paper yet be beneficial to recycle regardless of is left over, it could probley make ur gurl happy that ur assisting the planet :)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords