Tower Crane TC7021 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7021 Description:
1.CMAX Tower Crane TC7021 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7021 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7021 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7021 Parameter:
Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 40、45、50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 2.1
Tower Crane TC7021 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7021Diagram:
Tower Crane TC7021 Technical Sheet:
Tower Crane TC7021 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
- Seems have a big turn in a person's life. The external form of a person is ideal in the eyes of the planet when every feature is assembled in flawlessness or very nearly there. Of all of them, height represents an important role. Height is not just lots is one of the critical standards in plenty of areas: sports, being a part of the security force, wooing someone, obtaining a work or just bolstering one's assurance therefore
- Q: What are the lifting moment requirements for tower cranes?
- 2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device
- Q: What should i do to solve tower crane collapse?
- i couldn't figure it out either. try the castle catapult instead.
- Q: What qualifications do you need to be a Crane Operator in QLD, Australia?
- You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
- Q: Can someone tell me the difference betweem safe working load and capacity of a crane?If possible, please provide reference along with tour answer.thanks for the help!!!
- Swl Crane
- Q: Hi, considering joining a fujian white crane kung fu club, just looking for information on the internet. need videos and photos and descriptions about it. any links? thanks!
- My kind of question! I would like to start off by saying that if you have a Fujian WC school near you, you are very fortunate! I have to travel a bit and worst, wait for Sifu to be available. He is always abroad and busy when home. I learn Yong Chun White Crane. I have practiced Okinawan martial arts all my life and WC is the ancestor of my art, or rather, one of them. What school will you be joining? And Paul, what school do you train in? I also love the Hakka arts, which are somewhat related. FWC is an internal art based on Sam Chien training - Sanchin. It's great to know of others who are interested in White Crane Fist. Lets keep this conversation going!
- Q: Im looking for more information on Overhead Cranes!?
- You would get lot of information on Over Head Cranes as permanently installed material handling equipment for various industries, if you google search under EOT CRANES. As I know, in steel industries their capacities can go up to 400 Tons. EOT cranes are electrically powered and electrically controlled systems. These cranes are categorized for maintenance application and production application. At times their design and construction are quite complicated specially those of production application such as Steel melting shop of steel plant.
- Q: My relatives and their kids are coming the 28th for our Christmas does any body know where I can get a Brio Crane for a 3 year old? most web sites I checked say sold out. Just wondering.
- Hi okorder . Please visit it and it will satisfy your needs. Best regards, Soma
- Q: I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
- A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
- Q: Is the crane a metaphor for the woman? Or does it transform into one? OR does the guy marry a bird? I've been listening to this all week and cannot discern which is right...maybe that was Colin's intention? A little help here?
- It's a story about a peasant living in, I assume, rural Japan, it being a Japanese folk tale. He finds a wounded crane on the road as he's walking one night. It has an arrow in its wing, and he pulls out the arrow and revives the crane. A couple of days later this mysterious woman shows up at his door and he brings her in. Eventually, they fall in love and are married. Although they're poor-- she's a seamstress, a weaver-- she suggests that she can make this cloth that he could sell and make money. But the one condition is that when she's weaving he can't look into the room at her weaving. This goes on for awhile, until eventually the peasant's curiosity gets the best of him and he looks in. It turns out that the woman is a crane, and she's pulling feathers from her wings and putting them into the cloth, which is what makes it so beautiful and soft. Apparently, having looked in at her breaks the spell and she turns permanently back into a crane and flies away.
Send your message to us
Tower Crane TC7021 Construction Equipment Building Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords