• CMAX TC5613, With Q345B For Main Force Bearing Steel Structure System 1
  • CMAX TC5613, With Q345B For Main Force Bearing Steel Structure System 2
CMAX TC5613, With Q345B For Main Force Bearing Steel Structure

CMAX TC5613, With Q345B For Main Force Bearing Steel Structure

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
8t
Maximum Lifting Height(M):
150m
Rated Loading Capacity:
8t
Span:
56m
Rated Load Moment:
8t

 Brief introduction of TC5613

CNBM offers complete product portfolio, and the products are widely used in building houses, highways, bridges, water conservancy projects, etc. Featuring advanced technology, safe and reliable quality, timely and professional services, Huba products are very popular among customers both at home and abroad 

 

Detail of CMAX TC5613

Feature:Tower Crane 

Condition:New         

Model Number:TC5613

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of CMAX TC5613

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Specification of CMAX TC5613

Free standing height (m)

46

Max height with attachment (m)

150

Working range can be adjustedm

455056

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 50mt

1.8

Hoist mechanism

Falls

2

4

Lifting capacityt

1.5-3

3-8

Speedm/min

0-80

0-40

Motor

YZRDWF225M-4/8-30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.58

Counterweightt

44m jib length

55m jib length

13

15.05

Mast section sizeL×W×Hm

1.6×1.6×3m

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

170KVA for generator

Cable type ( within 40 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       170A

Rated working voltage & current

380V                   108A

 

Loading diagram

 

56m jib length

R

2.5-15.5

17

20

23

26

28.1

29

15

50

52

56

a=2(t)

3.00

2.91

2.32

1.90

1.73

1.38

a=4(t)

6.00

5.40

4.48

3.80

3.29

2.99

2.88

2.29

1.87

1.70

1.30

 

50m jib length

R

2.5-15.7

17

20

23

26

28.7

29

32

35

47

50

a=2(t)

3.00

2.97

2.63

2.36

2.37

1.88

a=4(t)

6.00

5.49

4.56

3.87

3.35

2.97

2.94

2.60

2.33

2.37

1.8

 

Images of CMAX Tower Crane

CMAX TC5613, With Q345B For Main Force Bearing Steel Structure

CMAX TC5613, With Q345B For Main Force Bearing Steel Structure

FAQ about CMAX Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

  

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working

 

Q:Structure

A:Tanks to the advanced design tools, such as electro-mechanical design, CAD design, optimization design, and modular design, the tower crane proves to be a kind of optimum construction equipment that shows not only superb strength, stiffness and fatigue resistance but also outstanding comprehensive performance and reliability.

 

 

 

 

Q: What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well, weak- anthropic beats the hell out of strong- anthropic. One cannot, in good conscience, postulate God from the improbability of a good primordial soup kitchen, when beating the odds is the prerequisite for anything evolving sufficiently to be amazed. Life, however, plays hell with probability, because it’s possible for an improbably complex thing to create as many improbably complex things as energy allows. Introduce evolution, crank out a tool user, it gets worse. One dedicated farmer can create a vast and profoundly improbable flourishing of life. Now if we move out into the universe and find a vast and improbable flourishing, we will have cause to suspect the existence of cosmic farmers. This especially because it appears we are evolving towards that state ourselves. Dressing up this concept in pseudo science though, strikes me as a bit pretentious. Which is my take on Louis Crane's idea of meduso-anthropic principle
Q: I got the Fly crane TODAY and I never even flew it, but I charged it up and it wont fly. The blades spin for 5 seconds, and then stops.
Good okorder , Funtastic Customer Service Team
Q: What does a track type tower crane look like? In that case, use?
The track type tower crane is like thisUsually use goods or fixed goods yard in shipyard. Hoisting use
Q: Can the tower crane personnel install the construction elevator?
As for the hoisting equipment, the licensed crane erection worker can install the construction elevator.
Q: i am looking for the schematic wiring diagram for GANTRY CRANE AC GENERATOR. thanks a lot
it sounds like you want to run a gantry crane with a generator the generator should have a wire diagram in side the cover. the gantry crane should have the power requirements on the electric motor there should be a tag on the motor. If you are not sure then you need to get an electrician out there to look at the two components and should be able to get you straight
Q: how do you win at the crane game?
im the master of the crane game. You gotta scope out the animal first! If it looks heavy then dont even bother. Whenever you grab hold of something its gonna pull it up and shake when it hits the top right? Thats why you go for something close to the hole it drops in. They have one where I work so I lock the wheels, grab the animal and pull the whole machine forward so that it just falls in the hole lol.
Q: (Fujian) white crane
Google it and see.
Q: Why are there extra placards attached to the tower crane tower?
2. after adding the placard, it will increase the windward area of the tower crane and increase the wind load of the tower crane, so that it will deviate from the calculation load when the tower crane is designed, and will affect the safe use of tower crane.
Q: I have to answer some questions about an except from Where I Lived, and What I Lived For by Henry Thoreau. I don't need an explanation for all the metaphors he uses and what they mean, but what is he talking about with the Pygmy thing? Do the pygmies battle the cranes because... they want to eat them? Are cranes just d!cks? Is a crane some type of weapon?
Definition Of Pygmies
Q: In the Bride comes to Yellow Sky, Stephen Crane uses symbolism to evoke in readers a sense of the “old west”. However, the knowledge of the “old west” that the average person holds in his or her mind is false and nothing more than a Hollywood created myth. By using the symbols inherent in Hollywood’s old western myth Crane manipulates the reader’s misconceptions only to leave them feeling stupid when he reveals a hole in that way of thinking with the irrational ending.This is actually a thesis i'm working on for an analytical essay on the piece.I need to know if anyone has ever read the story and gotten the same feeling Crane was having fun at the reader's expense or perhaps poking fun at the old western I have very good points from the text to support my thesis but i cannot find anything online that touches on the possability of this being a parody. Anyone else think Crane's having fun or is a bit condescending in this piece?
I have to say no. Your question erred in a significant way. Hollywood didn't create this false image of the West. The false image was created a long time before by people living in the age of the incidents. It didn't take publishers long to notice that people living back East enjoyed these gritty depictions of the West. Dime novels were a big seller in the 18th and 19th centuries. Look at Stephen Crane. He died in 1900. Hollywood was non-existent as the facet of American life that it holds now. Crane would have been writing this story with the idea that he was depicting a real slice of the wild West that was becoming more civilized.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords