• High Tech 300 Rotary Drilling Rig New Design for Sale System 1
  • High Tech 300 Rotary Drilling Rig New Design for Sale System 2
  • High Tech 300 Rotary Drilling Rig New Design for Sale System 3
  • High Tech 300 Rotary Drilling Rig New Design for Sale System 4
  • High Tech 300 Rotary Drilling Rig New Design for Sale System 5
High Tech 300 Rotary Drilling Rig New Design for Sale

High Tech 300 Rotary Drilling Rig New Design for Sale

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

High Tech Rotary Drilling Rig New Design for Sale 

High Tech 300 Rotary Drilling Rig New Design for Sale

Product Features:

 

 Features of   Chassis :

>>It is high working stability   equipped with expert chassis Which is under advanced design. 
  >>It is controlled to extend when working and retract the crawlers by   fully hydraulic with The proper center of Gravity design to make the drilling   rig with high stability.  

 


 

 Drill Mast:

>>Auto lift and fall of the drill   mast, convertible and Three section of box-type of drill mast reduce the   length and height;
  >>Parallelogram articulated and triangle cylinder positioning   supporting arm structure actualizes the high stability and rigidity and easy   lifting and falling; 
  >>Install gooseneck boom-cylinder on gooseneck boom and telescopic   supporting leg in bottom of the drill Mast to increase the working   efficiency.


 

 Features of upper   frame:

>>Unique body lever, use bracket   for upper frame, adopting the leveling cylinder is better than mast leveling,   and makes the operator more comfortable.


 

 Features of   engine:

>>Volvo boostmid-coolelectrical control   for engine,strong momentum,it can work at the place with 4,500m above sea   level with normal condition, Euro 3 emission standards.


 

 Features of rotary   drive:

>>Double-motor, double-reducer in   the rotary drive, powerful output torque, high ability of stressing. It is   with good adaptivity, the speed and output torque can auto-change with   different geological conditions; 
  >>It is installed hydraulic circle systems for separated lubricationcooling and speed changing system to ensure the reliability and   high effciency of power head.

 


 

 Features for   operating cabin:

>>The operating cabin to supplying   the comfortable working place for operator is with all-weather design,adopt   sound-proof material,elastic shock absorberimported adjustable seat, environmental air conditioner. 
  >>The layout for all the apparatuses and operating rods are clear, easy   operating. Colorful LED display, monitor the positioning of pile, the   balancing of the drill mast and the functions of the engine and hydraulic   system.

 


 

 Features for   hydraulic system:

>>Main hydraulic pump system,   hydraulic pilot-operated, constant power control.
  >>Hydraulic auxiliary pump system: load-sensitivity, hydraulic   pilot-operated, proportion control, fast responding, low energy consumption;   adopt unique load-flow control valve.
  >>Unique lubricated circuit for rotary drive: solve the problem of   mixing oil between lubricant oil and hydraulic oil.
  >>Balancing valve: the balancing valve for amplitude cylinder and drill   mast cylinder with non-pressure design make the speed lifting and falling   more stable for drill mast and amplitude mechanism to prevent the big shock.

 


 

 Features for   control system:

>>It can be real time monitored by   integrated electronic control system when working, and featured with 16   warning functions.
  >>Verticality automatic leveling system of drill mast can monitor the   lifting and falling and control the verticality of drill mast.
  >>Dynamic and digital display of all execution components on   intelligent diagnosis system.
  >>Rigorous logical interlocking control to prevent wrong operation by   operator.
  >>Accurate measurement for drilling depth: the mistake can be   controlled less than 10mm, 1mm for drilling depth by unique depth measurement   device.

 


 Features for   operating system:

>>Display operation: set up every   limit unlocklevel the   perpendicularity of drill mastthe reset of state   parameter of working for engine,set up the logical relationship of drilling   rig.
  >>rod operation:
  A.main work:CW/CCW for rotary drive; rotation of upper frame; operated by a   press or draw hydraulic cylinder;drilling tools lift and fall.
  B.auxiliary work:lift and fall of luffing mechanism; rotation of upper frameauxiliary winch lift and fall.
  C.operating rod for working mechanism:forwardbackward and turn around of the main machine.
  D.operating for drill mast:operating the rod to make the drill mast lifted   and fell.

Parameter:


ParameterModelTW300
Max.drilling Diameter (mm)Distance From Center Of Rotary Drive To Slideway Of Mast1140
Max.drilling Diameter2500
Max.drilling Depth(m)
90
EngineRated Power(kw)tab1641 375
Max.output Speed(TW/min)2100
Rotary DriveMax.output Torpue(kN.m)300
Output Speed(TW/min)8~28
Main WinchMax.lifting Force(kN)320
Diameter Of Steel Rope32
Auxiliary WinchMax.lifting Force(kN)120
Diameter Of Steel Rope20
Mast InclinationSide Inclination (°)5
Forward Inclination (°)5
Backward Inclination(°)90
Pull-Down CylinderMax.pull-Down Piston Push(kN)240
Max.pull-Down Piston Pull(kN)260
Stroke(m)5.3
UndercarrigeTrack Total Length(mm)6000
Track Plate Width(mm)900
Track Width(mm)3400~4600
Max.traveling Speed(km/h)1.5
DimensionWorking Condition Dimension(mm)11630×4800×24350
Transportation Dimension(mm)3500×3400×16900
Upper Frame Height(mm)1400
Upper Frame Width(mm)3100
Undercarrige Height(mm)1300
Rotary Radius(mm)4600
Overall Weight(t)
90


Application of prodcts:


Advantages

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.


Q: How did the pile of clay work after the pile driver finished?
After the pile driver has finished the pile, the concrete is usually pumped under the concrete.Classification by load characteristicsFriction pileFriction piles - most of the load is caused by the friction of the soil around the pile, and the resistance at the end of the pile is negligible.End bearing friction pile -- the pile whose load is mainly borne by the friction force of the pile body.End bearing pileEnd bearing piles - most of the load is carried by the supporting force of the pile tip, while the resistance at the side of the pile is negligible.
Q: Working principle of pile driver
Pile driver is a kind of piling machine that uses the impact force to push the pile into the formation.It consists of a pile hammer, a pile stand and auxiliary equipment.
Q: How to use the pile driver?You're right. Contact 18961845125 before you know.
2. Adjust the position of the speed change gear of the pile driver according to the vibration force required by the construction personnel.3. Check whether the insulation of cables and wires is good. Check that the controller's contacts are good and that the bounds are correct.4. Check whether the voltage of the power supply meets the requirements.5, according to the daily maintenance project to each department lubrication, maintenance.Five, pile driver in the work safety precautions:1, when the piling machine work, there should be special command. The conductor and operator should check each other's signals before they work. Work closely together.2, at the start of the bell signal or other applications, notify the staff around to leave.3, hammer and pile cap, pile cap and column (or pile) plane to pad, a connecting bolt should be tightened, and should always check whether there is loose.4. The starting of the pile driver should be adjusted from low gear to high speed.
Q: What's the difference between a walking tube type diesel pile driver and a track type diesel pile driver?
The piling machine works on the top and bottom of the pile hammer. The pile hammer moves up and down on the 2 rail. It is called a track type diesel pile driver, and the pile hammer operates in the pipe way up and down. It is called a tube type diesel pile driver
Q: Track excavator truck model, preferably material, and some are sent to the mailbox thank you very much
You can get them with the manufacturers who produce them. They usually do. Not really. Just find someone to look at the equipment and draw one.
Q: such as bulldozers, pile drivers, cranes and cement mixers?
Promote。 As for Chinese chopsticks, fork to foreigners, the Xu
Q: Principles of piling
Because of the buildings on the ground if you want to build on the ground, the ground will bear great pressure, we must ensure that the ground has enough resistance to stress strength, it is often difficult to do, so we must reinforce or improve the ground under way on the ground to bear, so I think in the pile foundation, make the most of the weight of buildings to the position below ground deep through the pile foundation, because this position is much larger than the ground bearing capacity.As to how deep the pile should be, it depends on the distribution of the ground beneath the ground (technically called the geological structure layer). If it is enough to withstand the pressure of the building, the pile hits here, and if not, it must continue to deepen.
Q: Bridge pile driver is a stone below, how to do?
General use of rotary drilling rig, face a big boulder, it is difficult to rely on hard drilling drilling, can only use impact drill punching, this method has been used quite normal.Rotary drilling rig for open-pit mine, the rock hardness coefficient f is less than or equal to 6 of the rock drilling at the same time, f=7-11 hard interlayer rock drill. When drilling, the rotary moment and the shaft pressure are applied to make the bit rotate and feed, so that the rock can be cut.
Q: What about a dry digger, a pile driver? How much money? What's the speed?
You can't spend much money on your own alterations
Q: What safety measures should be taken when assembling a pile driver?
4, mechanical equipment installation and transportation safety mattersThe mechanical equipment should be installed in a safe place, not in the rock slope landslide, or may be installed by flood invasion and flying stone in place, to ensure personal safety and machinery.The room layout shall be constructed according to the mechanical instructions or actual needs. Room to ensure mechanical windproof and rainproof, antifreeze and other requirements, to the appropriate area, convenient operation and maintenance, and adequate lighting, good ventilation, shutdown protection facilities for temporary use of machinery should be necessary.Mechanical equipment shall be installed according to the instruction manual and relevant regulations. After installation, safety inspection and performance test shall be carried out, and may be put into use after the test operation has been qualified.When the mechanical equipment is transported, make sure the binding is firm, the center of gravity is reliable, the brake is reliable, and the traffic safety is ensured.When mechanical equipment is unloaded, be sure to handle with care, forbid to throw and throw off from the car, use dump truck to transport machinery, forbid dumping with dumping method.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords