• Cantilever Formwork with Long Time Using for Large Projects System 1
  • Cantilever Formwork with Long Time Using for Large Projects System 2
Cantilever Formwork with Long Time Using for Large Projects

Cantilever Formwork with Long Time Using for Large Projects

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever FormworkPJ200 & PJ240,CB-240 etc.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Long Time Using for Large Projects

 

Cantilever Formwork with Long Time Using for Large Projects

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

Q:Bowl buckle type steel pipe scaffolding vertical pole bowl button node by what composition
The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated
Q:i have a helix piercing on one ear and i now want a scaffold piercing on the same ear. i know the bar for the scaffold piercing won't go through the helix hole, but is it possible to get the piercing done underneath and if so does it really hurt? (thanks in advance)
Yes, you can do a scaffold piercing beneath your current helix piercing without any problem. A scaffold piercing will hurt slightly more than a single helix piercing, but that's just because you're getting two piercings at once.
Q:I'm getting scaffolding put up round my house. Its a Normal size house and its being put up all round the four walls to the top. will it be put up in 2 hours or more? or less? I have no clue please help me.Thanks!
all depends how many guys are putting up the scaffold but I would say more than two hours
Q:Pankou scaffolding function how powerful
Scaffolding, low cost, high efficiency, convenient disassembly build effort, on the ground after the installation of integral hoisting
Q:In the construction of the construction, the template and the selection of the scaffold has no corresponding specification
Technical code for safety of steel tubular scaffold with couplers in JGJ130-2001 constructionJGJ130-2001 construction fastener type steel pipe scaffolding safety technical specificationsGBT17656-2008 plywood for concrete formworkGB15831-2006 steel pipe scaffold fastener
Q:Disc scaffolding used in the country?
Will collapse a large, even the overall collapse, and higher costs
Q:I had my scaffolding piercing 2 days ago, but I was just wondering how long it will take for the swelling to go down? I know because it's a double cartilage piercing, it is likely to take longer to heal and such, but I was just wondering if there was an average time before it goes back to normal?
Mine took about a week, but only the first 4/5 days were really bad. Taking something with ibuprofen or anything meant for swelling or an anti-inflammatory should help :) Don't try ice though, that just made it worse for mine.
Q:am i in my rights not to allow the scaffolding to be brought through my living room and kitchen.I have just had a threatening letter from camden council that they will force an entry if I refuse.I have lived here for 33 years and any scaffolding has always gone through the side entrance next door and over the garden wall I am a pensioner and feel I am being harassed
Call your lawyer.
Q:What are the specifications of the bowl fastener? What kind of
Bowl buckle bracket. Divided into horizontal and vertical rod
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.A. frame protectionB. loadC. foot plateD. bar lockE. frame stability
Disclosure and protection acceptance. General projects include: frame protection, material, load, channel. Option A, B error.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords