• Cantilever Formwork with Cost Savngs for Large Projects System 1
  • Cantilever Formwork with Cost Savngs for Large Projects System 2
Cantilever Formwork with Cost Savngs for Large Projects

Cantilever Formwork with Cost Savngs for Large Projects

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

The formwork can be moved backward by 600mm for cleaning the formwork and fixing the reinforcing steel bar. Waler connector is used for connecting the form to ensure form alignment.

Form can be pushed to the already cast concrete by turning the adjust carriage to avoid concrete offset or leakage.The formwork can be moved freely as you request. The formwork can be inclined backward and forward. Max. angle: 30°. High standard elements can be widely used.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

The M30/D20 climbing cones have been designed especially for single-sided concreting using cantilever formwork in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Cost Savngs for Large Projects

 

Cantilever Formwork with Cost Savngs for Large Projects

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

Cantilever Formwork with Cost Savngs for Large Projects

 

 

Cantilever Formwork with Cost Savngs for Large Projects

 

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

Q: The combination form of bowl buckle type common scaffold?
When erecting pole connecting joints should be staggered, the first layer of the pole using long 1.8m and 3.0m pole staggered arrangement, to have a 3.0m long rod, the top layer with 1.8m and 3.0m two kinds of length of leveling
Q: Bowl buckle scaffold from the machine to pull out the upper and lower bowl
It seems that there is no specific load value in the code, but there are some requirements on the calculation method and some structural loads
Q: The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of posts with the root, the number of bowl buckle on the number of how many?
These quantities can only be estimated in the absence of drawings.Height of 6 meters, the total root number = the total number of vertical pole = upper support number. Pull rod and diagonal rod according to the number X4.
Q: I just got my scaffold piercing yesterday, (the bar through the top of your ear) and one side is kind of swelling. Is that okay, or normal?
this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
Q: I would like to ask the bowl buckle scaffold operating layer is what?
Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q: Help.Saturday I want to get a snug piercing but apparently it really hurts I had my scaffolding(industrial) done about 4 months ago it hurt but not that much I was just wanted to know if any one knows if it really hurts I have had alot of piercings but I'm really worried about this one :/Just wanted to know if any1 has any ideas on pain or had both of them ??
A snug is nothing compared to an industrial, you'll be totally fine. Good luck!
Q: I heard that because of the bicentennial in 2012, a lot of buildings are under renovation. I am worried that when we get there, all the buildings will be under scaffolding and we won't see anything or be able to appreciate the true ambiance of the city. Does anyone know what the city looks like right now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q: A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint to one side, as shown.
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q: A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 190 N and is 3.30 m long. What is the tension in each rope when the 710 N worker stands 2.30 m from one end?smaller tensionN?larger tensionN?
think of statics (in terms of forces and torques): because of fact the gadget is in equilibrium, the sum of the forces = 0 and the sum of the torques = 0 on the grounds that sum of forces = 0, then: ft(left) + ft(suitable) - Fg(scaffold) - Fg(employee) = 0 on the grounds that sum of torques = 0, then: -Set some element as your axis of rotation. for my area, I set between the ft as my axis. to that end, my torque equation will become ft(suitable)(2.ninety m) – Fg(scaffold)(a million.40 5 m) – Fg(employee)(a million.ninety m) = 0 you already know Fg(scaffold), Fg(employee), so resolve for ft(suitable). Plug this value into the tension equation and resolve for ft(left).
Q: Bowl buckle scaffold weight per meter
The most commonly used part of the bowl buckle scaffold is 3130MM

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords