Cantilever Formwork with Durable Using Time and Trustful Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cantilever Formwork Description
Cantilever Formwork is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.
Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.
2. Main Features of Cantilever Formwork
-easy to assemble
-simple structure.
-easy, rapid and economical.
3. Cantilever Formwork Images
4. Cantilever Formwork Specifications
Anchor system
Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.
① Tensile bolt M30/L= 110
② Anchor shoe
③ Bowl-climbing cone M30/D15
④ High-strength rod D15
⑤Ancor plate D15
5.FAQ of Cantilever Formwork
1) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
2) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Steel Frame Formwork GK120 cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration,
it may need 2weeks.
- Q:~ I was thinking about getting it done for my 16 birthday. BUT I wanted to know how bad does it hurt???And if I do get it done is it best that.... I go to a tattoo shop to get it??
- Places like Claire's don't do those piercings, a tatto or piercing parlor would be the only place that does it. Check online and call in and read reviews before you go anywhere, they have been many places being shut down in USA and Canada for being unsanitary! So make sure your safe because it can perminatly break your cartilage if it's done wrong and you can get mney infections some being deadly and some that leave perminate scars. Make sure it's done safely, sanitary and with a needle. This piercing is more commonaly known as a industrial by the way. 1st of it hurts they all do. This was my most painful piercing ever. Got it done when I was 13, a month before I was 14. Think of it this way: 2 holes being stabbed into your ear connected by a bar. You bump on the other is automatically affected. I would definatly rate it 8.5/10. It was soberly painful. Hurts for a while and healing process is annoying as ever. Worth it for me in my opinion.
- Q:Explain the principles of scaffolding?
- Well first you open a book, then you do your own homework. And yes I work on scaffolding regularly.
- Q:It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
- I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
- Q:I just got my ear pierced(scaffold) and I was wondering if anything would go wrong if I played sports... I play soccer Track and my coach said they would let me play soccer as long as I covered it up, but I was just wondering if I get hit or something if it would damage my ear really badly? :) Thanks lt;3
- It could mess up with the tissue in your ear. My friend got one, and had to take it out when she played basketball cause she didn't want it to get messed up.
- Q:What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
- The vertical rod is installed on the 48mm 3.5mm steel pipe with a certain length diameter of 0.6m x, and the welding rod is welded on the top. Vertical bearing bar for scaffold;
- Q:What is the significance of the scaffold in the novel 'The Scarlet Letter' (Hawthorne)?
- It has dramatic importance because key events happen there. Further, at the scaffold is where much hypocrisy gets played out. From Shmoop
- Q:how would you apply scaffolding into an example in history/geograpy
- The US and other countries helping Haiti is an example of scaffolding which implies nations helping each other./
- Q:Full house scaffolding height of more than the number of meters experts need to do?
- With the China construction market is becoming more mature and perfect, bamboo scaffolding has been gradually out of the construction market, only in some remote and backward areas are still in use; and the door type scaffolding, scaffolding used only in small amounts, municipal bridge engineering, ordinary steel tubular scaffolding because of many advantages of the simple maintenance and long service life and low input cost, Chinese occupy more than 70% of the domestic market, and have larger development space.
- Q:Bowl buckle scaffold steps can only be used in the number of meters 3
- 6 vertical protective scaffolding = natural floor to the top of the cross bar between the tower set up the actual length of the towerThe total amount of construction work of the comprehensive scaffold is calculated according to the total floor area of the building
- Q:A scaffold is constructed by placing two supports under a 18 ft, 4 in (a) board weighing 77 lbs. The supports are each 2 ft, 6 in (b) from their respective ends. Two painters stand on the board; one weighs 153 lbs and stands 2 ft, 6 in (c) from the left end of the board. Where must the 202 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)
- I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cantilever Formwork with Durable Using Time and Trustful Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords