Belt Conveyor CEMA Idler Sets and Idler Group
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 1000 Pieces per Week pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
Our company can contract, design, manufacture and install all kinds of conveying projects,
including all kinds of belt conveyor, large slope conveyor, mobile conveyor and bucket
elevator and the crusher components.
1.Applications: The belt conveyor can be used in mining, coal industry, crusher and screening for bulk materials or
combined materials. Used in the steel industry, harbor, coal industry, power industry, cements industry, and more.
2.Main technical Parameters of General Fixed Belt Conveyor
Capacity (T/h) |
Power (KW) | |||||||||||||||
Belt Speed m/s |
0.8 |
1.0 |
1.25 |
1.6 |
2.0 |
2.5 |
3.15 |
4.0 |
0.8 |
1.0 |
1.25 |
1.6 |
2.0 |
2.5 | ||
Belt width B |
500 |
78 |
97 |
122 |
156 |
191 |
232 |
|
|
41 |
52 |
66 |
84 |
103 |
125 |
1.5-75 |
650 |
131 |
164 |
206 |
264 |
323 |
391 |
|
|
67 |
88 |
110 |
142 |
174 |
211 |
2.2-90 | |
800 |
|
276 |
348 |
445 |
546 |
661 |
824 |
|
118 |
147 |
184 |
236 |
289 |
350 |
3-160 | |
1000 |
|
435 |
544 |
696 |
853 |
1033 |
1233 |
|
|
230 |
288 |
368 |
451 |
546 |
4-280 | |
1200 |
|
655 |
819 |
1048 |
1284 |
1556 |
1858 |
2202 |
|
345 |
432 |
553 |
677 |
821 |
4-400 | |
1400 |
|
891 |
1115 |
1427 |
1748 |
2118 |
2528 |
2996 |
|
469 |
588 |
753 |
922 |
1117 |
5.5-630 | |
… |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note: the convey capacity is calculated on the basis of when horizontal transportation, the material move angle is 30°, and
specific gravity 1.0Ton/m2.
Idler Frame: Idler frame is an important part of belt conveyor and is used to support idlers and idler sets. According to the
types, the frames are divided into two types: liner frame and offsets frame.
Our frames are in accordance with ISO and GB standards. Meanwhile all frames are inspected prior to Conveyor idler roller
frame/station/support
- Q: Is the design of a conveyor belt, do not know the motor on the conveyor belt to choose how much power, who can give more detailed answer
- According to the weight of the object you conveyed, calculate the general resistance, then select the motor
- Q: Is the washing machine always grinding the belt?
- I was home appliances, because the belt is too loose or pulsator rust is not lubrication load too heavy.
- Q: To design a conveyor belt, 2 m / min, 3 m long, used to send the PCB board, very light, that is, do not know the choice of the motor, what about the power, and the wheel is not casually size, , The motor to add the inverter, or gear motor, or electronic regulator? Which is more suitable, why? Can you tell me Do not copy some online have to perfunctory! Thank you! More
- There are ready to set, why trouble.
- Q: My automatic mahjong table conveyor belt how to reverse the motor, it should be up to send the card, and now it will pass down the card, resulting in the card simply do not get on, the magnetic circles suck the cards are gone, Do not say anything more
- If the other function is normal no big problem, the relay is broken, for one. But there may be problems with the main control board. Because the motor relay is in the master
- Q: What is the reason why the tunnel conveyor belt does not move
- High temperature tunnel furnace does not turn there are many reasons, if you have pictures can be attached to the picture, which can be a better analysis of which is a problem
- Q: Hello, I would like to consult the power between the conveyor and the motor is the same Mody, is not the conversion of the formula is what ah, thank you
- Is the motor does not transfer the conveyor belt can do work
- Q: Physical short answer, put an object on the conveyor belt why the first to accelerate after the uniform speed
- Because the moment just put the speed is no speed, and between the conveyor belt and the friction between the object, then the transmission with the object to do even acceleration movement. When the conveyor belt is long enough, after a certain period of time the same speed as the conveyor belt, it becomes uniform....
- Q: If there is a conveyor belt, use a smaller force to push the gear so that the other side of the larger force of the gear rotation
- As long as the size of the appropriate proportion, very easy to do. This is the principle of the reducer. Nothing more than a small tooth to go high speed, big teeth output slow.
- Q: What is the motor used in the pipeline in the factory? Above also equipped with a reducer, you can adjust the speed of the motor, this motor is what motor? What is the general model? How can we buy the right motor? I do not know what type of motor to buy ////////////////////////////////// more
- This depends on your pipeline design accuracy requirements, you can use three-phase asynchronous motor can also use synchronous motor, you can also use AC servo motor. Choose the motor according to your request.
- Q: The motor has a fixed diameter wheel, connecting the conveyor belt. Conveyor belt with a large round of walking slow, or with a little bit of the wheel to go slow?
- The speed of the conveyor belt is determined by the speed of the wheels and the motor on the motor
1. Manufacturer Overview
Location | Hengshui, China |
Year Established | 2003 |
Annual Output Value | US$50 Million - US$100 Million |
Main Markets | North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market |
Company Certifications | Quality Credit AAAAA Brand Enterprise; Qualified Certificate; Outstanding Leader; Entrepreneurial model |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Tianjin |
Export Percentage | 21% - 30% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 50,000-100,000 square meters |
No. of Production Lines | 4 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | Average |
Send your message to us
Belt Conveyor CEMA Idler Sets and Idler Group
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 1000 Pieces per Week pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches