• Belt Conveyor System 1
Belt Conveyor

Belt Conveyor

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
1000 Sets per Year set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Detailed Product Description

belt conveyor, incline belt conveyor
ligjht duty model; heavy duty model
please email us for abtaining the detail catalogue

Q:Hello, I would like to consult the power between the conveyor and the motor is the same Mody, is not the conversion of the formula is what ah, thank you
Load is not the same, the power is not the same problem is incomplete
Q:Single mouth Ma machine conveyor belt broken, but do not know how to put the conveyor back more
Recommended to find the local mahjong machine maintenance staff, to help you. You see it is not.
Q:For the first time by plane. The The My luggage checked, where did the plane get luggage?
After the plane you go with the flow of people, to the final out of the airport where you can see the baggage conveyor belt, next to each conveyor belt has a display, which you read the flight number you read, where waiting On the line. Under normal circumstances, you go to the conveyor belt when the luggage has not yet, have to wait ten minutes or so....
Q:Physical short answer, put an object on the conveyor belt why the first to accelerate after the uniform speed
Assuming that the conveyor belt is horizontal and uniform, it is v and the speed direction is right. The object is just put on the conveyor belt (non-conveyor end), the instantaneous speed of the object is 0, the speed of the conveyor belt is greater than the speed of the object, the friction of the five parts of the conveyor belt to the left, the object friction to the right, the object in the friction Under the effect of the right to do even acceleration movement. When the speed of the object to accelerate to the same speed with the conveyor, that is, v, at this time, the two are stationary, do uniform motion.
Q:Is the washing machine always grinding the belt?
Washing machine is always grinding conveyor belt is mainly active wheel and passive not in a plane; a little adjustment can be resolved.
Q:If there is a conveyor belt, use a smaller force to push the gear so that the other side of the larger force of the gear rotation
As long as the size of the appropriate proportion, very easy to do. This is the principle of the reducer. Nothing more than a small tooth to go high speed, big teeth output slow.
Q:How to weld the belt on the belt conveyor belt broken, and how to get the most reliable?
If the drive belt is long enough to overlap and then drill holes are tightened with screws
Q:The factory made a 2-meter-long small conveyor belt, do not know what kind of motor and control? The motor starts to stop frequently, the minimum 1 second time, with a signal to control the conveyor belt to stop, and stop when the request to stop immediately, are not allowed to inertia. More
DC
Q:To design a conveyor belt, 2 m / min, 3 m long, used to send the PCB board, very light, that is, do not know the choice of the motor, what about the power, and the wheel is not casually size, , The motor to add the inverter, or gear motor, or electronic regulator? Which is more suitable, why? Can you tell me Do not copy some online have to perfunctory! Thank you! More
Speed belt belt / drive the best, the roller can be added 3 ¤ 10mm (short), the electronic governor has not been able to tune 3 phase, 1.5KW motor is enough, of course, but also control the electrical leakage, Open,
Q:I have two sets of conveyor belt, cylinder and air compressor, the trachea are connected. The existing JS14P time relay 1, CJX2-1210 contactor 2, are AC220V, diffuse photoelectric switch 1 [2 lines often open 220V], how to wiring? Puzzled line of their own, but there is a contactor will be baffled, how to solve, how to properly wiring. Urgent thanks! Question added: I would like to ask which master can draw a picture really thank the younger brother
If your metal parts are not long enough, when the photoelectric switch receives the signal to start the timer, you also need to add a self-locking loop, so that time relay can be time.
Since 1989, we have been serving customers in North America, Europe, Asia and other regions as OEM and ODM supplier. Our features: 1. Strong engineering experience & background in product design; 2. Short lead time in prototyping; 3. Strict QC monitoring program; 4. Consistent manufacturing quality and competitive price; 5. Wide coverage of product lines and manufacturing capacity; 6. Dedicated work team providing overall customer satisfaction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords