Gravity Roller Conveyor
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 1000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description of Gravity Roller Conveyor
we have standard model or built to customer specifications, please contact us for details
1)Standard
Roller-----carbon steel, zinc plated
Frame----carbon steel, powder coated
2)Optional
Roller-----stainless, galvanized, rubber cotaed
Frame----aliuminum, stainless, galvanized
Customized model available
- Q: For the first time by plane. The The My luggage checked, where did the plane get luggage?
- After the plane you go with the flow of people, to the final out of the airport where you can see the baggage conveyor belt, next to each conveyor belt has a display, which you read the flight number you read, where waiting On the line. Under normal circumstances, you go to the conveyor belt when the luggage has not yet, have to wait ten minutes or so....
- Q: Is the design of a conveyor belt, do not know the motor on the conveyor belt to choose how much power, who can give more detailed answer
- According to the weight of the object you conveyed, calculate the general resistance, then select the motor
- Q: I have two sets of conveyor belt, cylinder and air compressor, the trachea are connected. The existing JS14P time relay 1, CJX2-1210 contactor 2, are AC220V, diffuse photoelectric switch 1 [2 lines often open 220V], how to wiring? Puzzled line of their own, but there is a contactor will be baffled, how to solve, how to properly wiring. Urgent thanks! Question added: I would like to ask which master can draw a picture really thank the younger brother
- If your metal parts are not long enough, when the photoelectric switch receives the signal to start the timer, you also need to add a self-locking loop, so that time relay can be time.
- Q: To design a conveyor belt, 2 m / min, 3 m long, used to send the PCB board, very light, that is, do not know the choice of the motor, what about the power, and the wheel is not casually size, , The motor to add the inverter, or gear motor, or electronic regulator? Which is more suitable, why? Can you tell me Do not copy some online have to perfunctory! Thank you! More
- The load is not much motor 1KW enough. With the gear ratio to achieve the speed you can can be, with the inverter and reducer relative costs will be a little more. Speed does not need the same frequency converter.
- Q: What is the reason why the tunnel conveyor belt does not move
- Pay the telephone charges your shares
- Q: Hello, I would like to consult the power between the conveyor and the motor is the same Mody, is not the conversion of the formula is what ah, thank you
- Is the motor does not transfer the conveyor belt can do work
- Q: If there is a conveyor belt, use a smaller force to push the gear so that the other side of the larger force of the gear rotation
- With a semi-crossed drive, so small pinion force
- Q: What is the motor used in the pipeline in the factory? Above also equipped with a reducer, you can adjust the speed of the motor, this motor is what motor? What is the general model? How can we buy the right motor? I do not know what type of motor to buy ////////////////////////////////// more
- Servo motors, are generally equipped with reducer, not only can control the speed can also do position control.
- Q: The motor has a fixed diameter wheel, connecting the conveyor belt. Conveyor belt with a large round of walking slow, or with a little bit of the wheel to go slow?
- The larger the wheel on the conveyor belt, the slower it is. Because the wheel on the motor shaft is longer than the long wheel circumference on the conveyor belt, the longer the wheel on the conveyor belt, the longer the circumference of the wheel, the wheels on the motor shaft to turn a few laps, the big wheel may not turn The
- Q: What is the motor in the conveyor belt (pipelined) The kind of motor also has a speed control box, but not the inverter.
- You use this governor to use a governor control, commonly used in low-power motor, 400W below the use of common 200W following motor, speed control panel + motor cost is low, more than 400W using the inverter control, the motor is asynchronous motor, There are two phases and three phases.
1. Manufacturer Overview
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Gravity Roller Conveyor
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 1000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches