• Freight  Elevator System 1
Freight  Elevator

Freight Elevator

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Unit unit
Supply Capability:
600 Units per Month unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description

1) Effective and energy-saving

2) Green environmental protection

3) Stable and reliable

4) Space-saving & Low noise

 

Photocell door protection device

Photocell protection safe net are formed at the entrance of the lift, which sensibly detects and responses to

any objects that intrude into the detecting scope. The safety of human and cargoes are guaranteed.

Our lifts boast extraordinary service hours and the operation is highly effective with an energy-saving merit.

With stable & reliable performance, which will become your helpful assistant & best cargo transportation tool.

Q: Elevator to the second floor, when the man turned out and smiled at her. When the door closes, she suddenly darling up to the third floor .. The woman is dead. Q: Do not cancel the third floor of the case how can let her survive? More
It's so simple. Girl from the bag inside out of a submachine gun on the line
Q: How to set the elevator shaft
Oh, you are asking the elevator shaft in the budget of the project problem, there are the following items 1, the implementation of steel reinforcement corresponding project 2, concrete concrete implementation of the corresponding project < ; 3, the template in the fixed in a proprietary, is the elevator shaft wall template, in practice, you can also use the shear wall project 4, elevator shaft frame This is the scaffolding in the project 5, you see the construction organization design, There is a corresponding process requirements, there will be no drawings such as bolts and other materials, this do not forget to calculate
Q: Whether the elevator can be combined with the fire elevator
Yes, the two functions do not conflict.
Q: What are the embedded parts in the elevator shaft?
If the shaft of the hoistway is a brick structure, it is necessary to set up a ring beam every 1500mm to 2000mm height in the hoistway (the first gear ring in the bottom of the hoistway is made up of 1500mm Set, from the second gear ring began to set by 2000mm, the top of the hoistway last gear ring by the floor 400mm set), ring beam height ≥ 300mm, elevator floor should be equipped with a beam on the edge, beam height 350mm, beam The width of the same width and the hoistway, and shall not protrude into the hoistway (the beam used to install the floor of the floor door) 2, the basement or other floor structure is not the structure of the floor, Along the beam with a beam height of ≥ 350mm, the length of the beam and the same width of the hoistway, and shall not protrude into the hoistway (this spoiled anger to drink sewn bucket bucket for the installation of the elevator floor gate) If the wall of the hoistway is a fully castable structure, it is not necessary to set the beam and the beam. If the wall of the hoistway is part of the cast - in - place structure, the position of the ring beam and the over - beam must be set.
Q: PLC control elevator advantages of the problem added: the best details more points
PLC to achieve the advantages of elevator lift control Elevator as an important means of high-rise buildings and people's work and life are increasingly closely linked. PLC as a new generation of industrial controller, with its high reliability and advanced technology, in the elevator control has been widely used, so that the elevator from the traditional relay control for the development of computer control as an important direction to become the current elevator control and technology One of the hot spots of transformation. PLC is a microcomputer system that specializes in logic control. As the PLC has a stable performance, anti-interference ability, flexible design and other characteristics. So it has been widely used in industrial control. Since the late 80s PLC introduction of China's elevator industry since the PLC composed of elevator control system is widely used by many elevator manufacturers. And formed a series of stereotypes products. In the traditional relay system transformation project, PLC system has been the mainstream control system. Elevator control system is divided into speed control part and logic control part. The performance of the speed control part of the elevator operation is the passenger comfort has an important impact, and the logic control part of the elevator is safe and reliable operation of the key. In order to improve the comfort of the elevator and the reliability of the operation, now with PLC to control the operation of the elevator, which greatly improved the performance of the elevator.
Q: As we all know, press the button, the elevator door will open, and each floor body has a door (Note: the door in the "floor"). But the elevator to pay for Cao Zhi 丨 pedal check boxing gnosis itself has a door? In other words, the elevator is a hexahedron or a pentahedron More
The elevator car is a hexahedron. The elevator car itself has a door, and each time you pay for the floor, there is also a door, and when the elevator arrives at the floor, the two doors are opened at the same time.
Q: What are the reasons for the elevator downtime?
(1) elevator control program disorder, out of control; (2) elevator shaft leveling sensor failure, elevator lost floor data; (3) elevator running in the process of mechanical scratches, such as car door knife and hall door Ball or hall door to ground distance is too small, compensation chain hoist parts and so on. (4) elevator safety gears, grips, brakes and other safety components accidental action; (5) elevator overload squatting; (6) elevator running process safety circuit failure, hall doors or car doors and other failures, Belonging to a protection function of the elevator. (7) In addition, there are other reasons, such as maintenance and maintenance of the elevator is not in place, not according to the national statutory cycle of regular maintenance and regular inspection, so that the elevator with a fault operation; or elevator number, location and other arrangements unreasonable lead Elevator use frequency is too high, the elevator motor, control cabinet heat generated by a variety of sudden failures. Elevator suddenly stopped, no less than two reasons: First, a sudden power failure; Second, the sudden failure of the elevator.
Q: My aunt made a house, a lower layer, four on the ground. Was designed to consider the design of the time when the road, but that there is no need to install the elevator to give up. But after the decoration did not feel that the elevator is not enough style of the room, she would like to install the elevator but worried that there will be no hoist will be more open than the plantation Bong Bao Bao is very troublesome, how to do this? Now the house has been made well, and then installed the elevator too late? She did not understand, let me ask, please advise, thank you friends. More
Can you elaborate
Q: What are the contents of the elevator property every day?
1, observe the operation of the elevator every day (up and down operation, speed, open the door, leveling, etc.). Daily engine room inspection, you must check the traction machine transmission parts of the situation. 2, check the motor and traction machine gear box oil level is in line with the requirements. Check the control cabinet, power distribution cabinet and other electrical equipment terminals, with or without loose burning phenomenon. 3, check the circuit breaker, contactor with or without contact, pull the arc phenomenon. 4, check whether the grounding point meet the requirements. 5, check the speed limit to work the operation, timely refueling. The election, external election button work, whether sensitive. 6, check the safety protection device installation parameters and action test status is consistent with the standard. 7, check the car lighting and fan. Each indicator light, replace the damaged parts. 8, check the fire ladder fire function. 9, monthly inspection boots and boots lining. Check the shaft position sensor and so on. 10, the monthly inspection car roof overhaul switch and the upper and lower forced slow switch. Check and adjust the rope tension. 11, monthly cleaning room, cleaning car roof and pit health. Check the buffer oil level and reset the situation. 12, monthly inspection wells along with the cable. Check the balance chain suspension and rotation. 13, the monthly inspection room car door-related size, and make the appropriate adjustments. 14, the monthly inspection and adjustment of brake braking torque and brake shoe work conditions. 15, the monthly cleaning of the corridor chute hygiene and impurities, so that the door and car doors without blocking. 16, the monthly inspection, adjust the door and the door and the lower end of the station speed, limit switch, so that the correct location, reliable function. Elevator machine performance adjustment check, must be recorded, and archived.
Q: Vertical elevators between the two kamels distance 11m must be installed in the middle of the security door?
Yes, according to the provisions of (1) when the adjacent two-door gate of the gap between the big tiger gong port harboring locust song Wei linked to 11m, during which should be set to a height of not less than 1.80m, width of not less than 0.35m of the well safety door (3) the door should be installed with a key to open the lock, when the door is open without a key to be able to close and lock, after the door locked (after the door is locked) , The key can be opened from the hoistway; (4) the electrical safety device should be provided to verify the door closed
We have introduced production facilities and inspecting equipments with advanced world levels from Germany, Italy and other countries, so that keeps a manufacturing capacity about 40,000 sets as annual output, which is a large-scale and modern manufacturing enterprise, facing the global market for elevators, escalators and parking system equipments.

1. Manufacturer Overview

Location Zhejiang,China (Mainland)
Year Established 2007
Annual Output Value Above US$100 Million
Main Markets 90.00% Domestic Market
2.90% Southeast Asia
2.10% Eastern Asia
1.50% South America
1.20% South Asia
1.00% Africa
0.60% Mid East
0.50% Central America
0.20% Oceania
Company Certifications Machine Roomless Passenger Lift CE Certificate; Passenger Lift CE Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Shanghai port
Export Percentage 11% - 20%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, German
b) Factory Information
Factory Size: Above 100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords