AR Glassfiber Chopped Strand 16.5% for Cement
- Loading Port:
- Shanghai Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 15.6MTS
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications of AR Glassfiber Chopped Strand 16.5%for Cement:
1.AR Fiberglass Chopped Strand for GRC
2.Good mechanical properties
3.Low static,good flowability
4.AR fiberglass
Description of AR Glassfiber Chopped Strand 16.5% for Cement:
ARG chopped strand is designed to use in dry mix systems or other premixing processes GRC(Glassiber reinforced concret).Such as drainage channels, cable troughs, meter boxes, wall cladding panels or in architectural applications such as decorative screen walling, etc.
AR fiberglass chopped strands for GRC is with AR fiberglass roving for GRC to be chopped into certain length:
--ZrO2 content: 14.5%, 16.7%
--Filament diameter: 15um
--Yarn density: 2400tex
--Chopped length: 3mm, 6mm,12mm
Description of AR Glassfiber Chopped Strand 16.5% for Cement:
ARG chopped strand is designed to use in dry mix systems or other premixing processes GRC(Glassiber reinforced concret).Such as drainage channels, cable troughs, meter boxes, wall cladding panels or in architectural applications such as decorative screen walling, etc.
ARC15-98-(3-30)mm ZrO2 14.5%
ARC13-76-(3-30)mm ZrO2 16.5%
Properties of AR Glassfiber Chopped Strand 16.5% for Cement:
Good liquidity and high integrity, Excellent alkali resistant and durability
Package of AR Glassfiber Chopped Strand 16.5% for Cement:
20kgs/kraft bag, 50 bags/pallet, 20 pallets/20'FCL(on 2 levels), total net weight for 18 tons.
- Q: White cement with putty powder together, batch wall will fall off powder? How about the effect?
- Tips: white cement wall, the use of additives is glue, no additional water putty powder when the wall, in addition to additives but also add water
- Q: I accidentally put my foot inside a wet cement container. Then, I fell asleep.....and when I woke up.....My foot is stuck to the container. I am not sure what to do? Should I drill the cement with a screwdriver to dig through or what?
- Hi George Time to meet the lovely folks of you local EMS. Call 911. Don't be embarrassed. They have seem much odder things cased in cement. There can be some serious complications for your foot if you don't get it taken care of quickly. And it is not something you take care of by yourself. You can have serious compromising of the circulation in your foot, both blood vessels and lymph system that can lead to nerve damage, loosing a toe or two.....or your foot.
- Q: The factory was established this month, not yet officially produced, is now renovated workshop. More
- Can be divided into three categories: machine materials, inorganic materials (metal, non-metallic), composite materials.
- Q: Decoration, the main material and auxiliary materials which refers to the material?
- The main material refers to the decoration of the finished material, finishes and some functional materials. Accessories are used in the decoration of the auxiliary materials. Ingredients include: sheet, keel, cement, sand, bricks, waterproof material, plumbing fittings, wires, putty, plastic, wood paint, latex paint, hardware, floor drain valve soft Connecting, insulation and other materials. Accessories of the analysis: sheet: divided into large core board, gypsum board, MDF, three hydrogen ammonia board, sauna board. The following are talking about the process of these plates and the use of range. The main material analysis: auxiliary materials include: sheet, lamps, sanitary ware, tiles and other materials. Floor refers to the wood as raw material of the ground decoration materials. The market is currently the most popular solid wood flooring, solid wood flooring, laminate flooring. Which solid wood flooring and laminate flooring can be used for geothermal ground. Lighting is the main tool for evening lighting, but also the effect of space on the specific decorative effect. The selection of lamps to consider practical, beautiful, energy-saving three points.
- Q: It is one of those hollow cement/crushed stone stairs outdoors. The top step has a crack and small hole. ( Because of such changes in warm to cold weather this must have happened) There must be a fairly easy , non-expensive way to try and repair this step before it caves in
- I use 3 parts of Portland cement to 2 parts of sand for such a repair. First take and clean out the area of all loose materials and then coat it with a coat of Latex paint. Then mix the Portland and sand dry, then add to about a gallon of the mixture a 1/4 cut of that latex paint, add water to suit giving a consistency of tooth paste. Fill the hole, let it sit for at least 2 hours, then scrape it neatly with a trowel, leveling it. This bond with the latex is about the best around, better that any sort of stuff sold at Lowes or Home Depot. Our local hardware store has Portland cement in 10# bags so you dont have to go out and get a 100# bag. Buy your bagged sand right there too. DO NOT use the premix stuff ( sand and cement) in a bag, simply not enough Portland in that stuff and a sure way to have a failure of this patch.
- Q: Hey, I was working with cement dust and it was windy, and ended up going everywhere - I mean my eyes, hair, and I breathed a lot of it in. Now Ive got a sore throat, heavy eyes, and it wont come out my clothes.How can I get it out clothes? And is it dangerous to breath in too much? Is it possible it mixed with sweat in my hair to form a paste? it feels funny! Health affects? thanks for any help :-)
- See your health care provider for consultation on chemicals on skin, etc. If you have had difficulty with particular types of clothing, cosmetics, deodorants, and so on, then avoiding contact is the best way to avoid a problem. Changing brands may also help. For example, some cosmetics are manufactured so that they are less likely to cause an allergic reaction (hypoallergenic products). For example, rashes caused by deodorants are often relieved by using a milder preparation less often. Once the rash has occurred, eliminating contact with the chemical is essential. Washing thoroughly with soap and water may remove chemicals on the skin and is especially important with materials such as cement dust. Oily substances may best be removed with rubbing alcohol, or use paint thinner quickly followed by soap and water to prevent contact dermatitis from the thinner itself. With cement dust, wear a mask and covered clothing. Taking a hot shower may helps also, when contact with chemicals. Chemicals may cause a rash in two ways. The chemical may have a direct caustic effect that irritates the skin-a minor chemical burn. Or, more often, the chemical may cause an allergic reaction of the skin, resulting in a rash. I hope this helps you. And good luck.
- Q: I have a question about subfloor and tiling.. our kitchen and dining room are connected, and our dining room has hardwood floor and the kitchen just has a lineolm currently.. we are remodeling our kitchen and tiling.. we know the correct thing to do is lay down a cement backer board, our question is, do we take up the current subfloor? im afraid if we dont that once we put the cement board down and then the tile down, THEN the kitchen floor will be higher than the dining room.. so, again, taking the current subfloor off, and just seeing the original floor boards that run diagonally (i know it does that from looking from the basement up).. and then lay the cement board on there, and then the tile, can that be done?? THANK YOU IN ADVANCE!!!!
- You need the subfloor for strength, you cannot pull it up. They do have a friendly moulding that also dresses up the area from the kitchen to the dining room, that stops you from tripping.
- Q: ive been waterproofing basements for 13 years. we jackhammer concret all day and the basements get very dusty. masks are worn but their not 100%
- its bad, you should be using a face mask, it can cause a disease called silicoses, and it works on your lungs over time like cement hardens. look it up.
- Q: I want to stain my cement/concrete patio around my pool. What is the best stain to use. I don't want to have to keep redoing it every year.
- you don't stain cement you paint it!! that is why you are having to redo it every year. cement does not absorb things paint is thicker and will stick to the cement.
- Q: We are painting our living room floor. My husband wanted me to buy a BEHR cement paint stain at Home Depot. However, they didn't have the colors we wanted available in that paint, so they told me that the BEHR Porch and Floor paint was exactly the same (the stain just has the option of semi-translucent colors, whereas the other does not) and they had a better variety of colors. I trusted the people, but have I made a big mistake, what is the difference? I'm nervous my husband will be very upset when he gets home, since it is non-refundable.
- Cement stain is very different from paint. However the big advantage to paint is that you can patch any cracks in the cement and the paint will cover those patches completely. You can't do that with stain. Stain will show your patches. I have used Behr cement paint on a patio and I was very happy with it. Maybe your husband will be happy with it after all. I thought they could mix any color of stain just like they can mix any color of paint? You should probably call Home Depot to see if that paint guy knew what he was talking about. It's good paint though. You'll like working with it.
1. Manufacturer Overview
Location | Hubei,China |
Year Established | 2005 |
Annual Output Value | US$50 Million - US$100 Million |
Main Markets | Southern Europe 10% Northern Europe 10% Central America 10% Western Europe 10% Eastern Asia 10% Mid East 30% Africa 20% |
Company Certifications | N/A |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai PORT |
Export Percentage | |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English;Chinese; |
b) Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | |
Product Price Range | 示范:High;Average |
Send your message to us
AR Glassfiber Chopped Strand 16.5% for Cement
- Loading Port:
- Shanghai Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 15.6MTS
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords