Concrete Pump Malaysia

Hot Products

FAQ

What is the difference between Sanya Heavy Industry concrete electric drag pump and diesel fuel pump
The diesel drag pump, is relying on its own diesel engine to run the main pump to provide power, driving the entire system to run.
Can the tower crane be filled with concrete pump tube?
(9) ribs and wire rope direct contact without protection measures are not allowed to hang; (10) six or more strong winds are not allowed to hang.
How to prevent concrete pump blockage
Improper operation: the operator to concentrate, to avoid abnormal pressure gauge readings; pumping speed to meet the equipment requirements; pumping more than the amount of material can not be lower than the stirring shaft; Tan degree to control in the 80-230mm; downtime control in 15
What is the difference between a concrete pump and a concrete pump?
Is a use of pressure, the concrete along the pipeline continuous transport of machinery, mainly used in housing construction, bridges and tunnel construction.
What is the difference between concrete conveyors and concrete conveyors?
The parameters of the main pump are used to determine the speed and transport height of the pump. The horizontal distance is determined by the length of the cloth rod. It is suitable for pouring concrete in fixed mode and can ensure the uniformity of concrete and increase the compactness.
What is the difference between fine stone concrete pump and tow pump?
Equipment selection of a number of concrete pump of the first technology, is the first domestic fine stone transport equipment.
Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
one-way valve in a set of equipment on the four, generally have a rod on the one-way valve from the role of oil, when a rod chamber check valve damage (such as the normal wear spool can not be successfully opened), in a
What is the depreciation period for concrete and concrete carriers and how much net residual value is
The depreciation period for concrete and concrete carriers is 4 years and the net residual value is 2%.