Mobile Concrete Mixing Plant
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Mobile Concrete Mixing Plant | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
- Q:so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
- Q:im so frustrated because ive tryed everything and im obsessed with this book it would really help if someone could find a way for me to read it for free online. i cant find it at my library.please and thank you:)?
- Shelly Crane is not giving the book away for free so any online site that has it, has stolen intellectual property.
- Q:How do tower cranes rise?
- The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
- Q:how do i make the paper crane from prison break?
- i okorder / hard to explain without showing.
- Q:I am currently an electrical apprentice but would like to become a crane operator. Something i have always wanted to become. I was wondering what the job market is for a tower crane operator vs a mobile crane operator? Also what is the salary comparison? Also how to get my foot into the door and become one. Thank you!
- You have to be able to do simple trig to figure what your crane is capable of. You will have to become a member of the crane workers union. Someone may have to die to make a space for you. You may have to take jobs that are just fork lift qualified, if you are lucky, you might find work at seaports unloading cargo ships.You may have to work your way up through the ranks as a wrecking ball operator. The very lucky will make 50-60K +. The really good ones will make more only after many years.
- Q:please tell an article about electromagnetic crane?
- electromagnetic crane has a huge electric magnet instead of a hook. this magnet is operated by an electrical current. when electric is switched on the magnet becomes magnetized,allowing metal objects to be picked up just like an ordinary magnet.when Electric is turned off the metal object will fall away, as it is no longer magnetized.
- Q:how do i win stuff in a crane machine?
- 1- okorder for other tips and fun. :)
- Q:Preferable short poems or phrases in Chinese.
- this one is about cranes We thought they were gulls at first, while they were distant- The two cranes flying out of a natural morning, They circled twice about our house and sank, Their long legs drooping, down over the wood. We saw their wings flash white, Frayed at the black tip, And heard their harsh cry, like a rusty screw.
- Q:Why are electromagnets on junkyard cranes generally circular in shape?
- the guy above me has it pretty much right. It's very easy to make a cylindrical electromagnet, the calculations for it are easy as well, compared to other shapes of coil; they also generally produce a very simple, elegant magnetic field. More complicated shapes would change the shape of the field and give weird results when you try to get things to stick to it.
- Q:In what circumstances should a tower crane be demonstrated by an expert?
- (two) lifting equipment with lifting capacity of 300kN and above; climbing within height 200m or aboveDemolition of heavy equipment.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Mobile Concrete Mixing Plant
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords