Concrete Machinery-Concrete Pump (Model:SP80.16.181D)
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Description
The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
2.Advanced hydraulic system which change direction hydraulically can run without electrical part.
3.Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.
4.Tungsten steel glasses shaped plate and cutting ring guarantee long using life.
5.Hydraulic outriggers make easily positioning.
6.Pump can be easily washed.
- Maximum theoretic feeding volume (High pressure/ Low pressure) : 50/87 m3/h
- Feeding pressure : 16.2/8.7 MPa
- Model of distribution valve : S valve
- Type of power machine : Deutz BF6M1013CP
- Power : 181 kW
- Rated rotating speed : 2300 round/minute
- Specification of concrete cylinder (bore x stroke) : dia. 200 x 1800 mm
- Type of hydraulic system : Open
- Volume of hopper : 780L
- Loading height : 1400 mm
- Capacity of hydraulic oil tank : 540L
- Permissible max diameter. of aggregates : cobble þ50mm, broken stones þ40mm
- Bore of concrete feeding pipe : þ125/þ150mm
- Dimension (length x width x height) : 6600x2100x2800mm
- Total weight (complete machine without concrete conveying pipeline) : approximately 6700 kg(+-150kg allowed depending on hydraulic oil carried)
- Hydraulic jacking outrigger: yes
- Q: Concrete tow pump price how much money ??
- Professional production and supply of various models of mixer, concrete mixing plant, batching machine, cement warehouse, bulk cement tank.
- Q: Winter concrete pump pipe Zeyang insulation Yeah?
- If the temperature is low (for example, minus 15 ° or less), you need to use mineral wool was wrapped with plastic cloth.
- Q: How to determine the concrete pump truck blocking the site
- S pipe valve is blocked gradually formed, the main reason is that after pumping the finished product concrete, there is no timely use of high pressure water rinse, resulting in commercial concrete residue in the S tube, the course of time gradually thickening, accumulation consolidation, causing clogging.
- Q: What are the requirements of the concrete pump?
- 6, in the concrete pump within the scope of operation, shall not impede the resistance, high-voltage wire, at the same time have to prevent high-altitude falling objects measures.
- Q: What is the cause of concrete pump blockage?
- Repeat the anti-pump operation, and gradually plug the concrete mixture at the plug into the hopper, re-stirring and then normal pumping.
- Q: What are the standards for the use of concrete pumps?
- The concrete in the concrete feed pump hopper must be higher than the stirring shaft to avoid concrete splashing due to the inhalation of air;
- Q: How high concrete pouring concrete pump can be poured how high?
- When the floor height exceeds the applicable height of the car pump, it will use the pump (fixed pump) to pour the concrete, the general height of the pump can reach more than 100 meters to 200 meters.
- Q: How much concrete construction is needed for concrete pump construction
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
- Q: What is the introduction of fine stone concrete pump
- It has the capability of long-distance high-level pumping and can arrange the pipeline flexibly,
- Q: What is the purpose of concrete pump truck?
- the hydraulic crimping cloth boom and the supporting mechanism for the cloth on the automobile chassis, which integrates the driving, the pumping and the cloth function.
Send your message to us
Concrete Machinery-Concrete Pump (Model:SP80.16.181D)
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords