Concrete Pump following CE certificate made in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Truemax concrete trailer pump includes different types to meet various needs. It is famous at the worldwide market for its high reliability and efficiency.
1. The high quality hydraulic valves and oil pump use Germen REXROTH or Japan Kawasaki products.
2. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
3. Advanced hydraulic system which change direction hydraulically can run without electrical part.
4. Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.
5. Tungsten steel glasses shaped plate and cutting ring guarantee long using life.
6. Hydraulic outriggers make easily positioning
Model | Unit | SP90.18.174D | ||
Whole performance of pump | Max. theory concrete conveying capacity (low pressure/ High pressure) | m 3 /hr | ||
91/51 | ||||
Max. concrete pumping pressure | bar | 157/85 | ||
(High pressure/low pressure) | Mpa | 15.7/8.5 | ||
Theoretic maximum delivery distance | m | horizontal | vertical | |
(f 125mm) | 824 | 235 | ||
Main oil pump | ml/r | 190 | ||
Distributing valve form | S-tube valve | |||
Main oil cylinder size | mm | Φ140xΦ95x1800 | ||
(diameter X stroke) | ||||
Concrete cylinder size | mm | Φ200x1800 | ||
(diameter X stroke) | ||||
Concrete hopper | LX mm | 700x1350 | ||
(volume X charging height) | ||||
Outlet diameter | mm | Φ175 | ||
Power system | Engine | Caterpiller C6121ZG13a | ||
Rated power | kW | 157 | ||
Rated speed | r/min | 2100 | ||
Hydraulic oil way form | Open circuit | |||
Hydraulic system | Hydraulic pressure | bar | 320 | |
Pressure of distributing system | bar | 200 | ||
Pressure of mixing system | bar | 140 | ||
Max. mixing speed | r/min | 42 | ||
Hydraulic oil tank volume | L | 420 | ||
Max. aggregate size | mm | Pebble 50, | ||
Crushed stone 40 | ||||
Other data | Cooling way for hydraulic oil | Air cooling or water cooling | ||
Outline dimension | mm | 6370x2145x2390 | ||
Total weight | Kg | 5780 |
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2.Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3.Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
Mission & Vision: The following Core Values fulfillment is our objective.
1.Integrity and Professionalism.
2.Target and Action Oriented.
3.Service Quality & Customer Oriented.
4.Pro- Active to change.
- Q:How does the cement slurry solidify inside the concrete pump?
- Suggested after the completion of each operation, the pump should be about to clean!
- Q:What is the performance characteristics of concrete pump
- 9all parts of the national standard, interchangeability is better
- Q:What are the types of concrete pump trucks?
- At present I know the main pump pump arm.This arm is flexible and flexible.This arm is flexible and flexible.
- Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- There is no universal card, because there is no need.If you do not have a spare tube, you can also find a welding machine, the place where the patch will be patched on temporary work, if nothing, that your work is too poor to prepare, can only clean up the pipeline,
- Q:What is the difference between concrete conveyors and concrete conveyors?
- Under normal circumstances, the concrete pump delivery distance, along the horizontal direction can reach 200 ~ 300m, up to 100m in the vertical direction
- Q:What is the history of the concrete pump
- Count down, the Germans with nearly two decades time, the boom height of nearly 40 meters.
- Q:Why does concrete pump truck need pipe?
- The successful development and application of the pump pipe is a positive contribution to the low carbon and energy saving and emission reduction of the concrete industry.
- Q:When the concrete pump in the transport of concrete before the pipeline should be what lubrication
- Usually with water for lubrication, we mentioned a mortar, in fact, the scene is difficult to have such a situation, specifically for you to prepare mortar.
- Q:What is the difference between the construction of a concrete pump and a concrete distributor?
- It is also more trouble to deal with the pump when the pump is more flexible, the pump tube can be 360 degrees flexible rotation, the body shift is also very convenient, pumping efficiency is relatively high, but the cost is more expensive, and now the construction of the car pump
- Q:What is the calculation of the unit price of concrete pump?
- Usually with the pump is related to the amount of pumping less, to charge classes to ensure that the profits; pumping more, pumping high fees, there is no need to charge.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump following CE certificate made in China
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords