• 9m3 mixer truck with Shacman chassis System 1
  • 9m3 mixer truck with Shacman chassis System 2
9m3 mixer truck with Shacman chassis

9m3 mixer truck with Shacman chassis

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Model: CLY5254GJB3

Overall size (mm)

9180 (L)*2500(W)*3850 (H)

Tank body dimension(mm)

4990*2300

Wheel base (mm)

3625+1350

Tread f/r (mm)

2036/1860

Max. Speed (km/h)

77

Chassis

Manufacturer

Shacman

Model

SX5255GJBDP364

Steering system

ZF technology

Transmission

Manual

Brake system

Dual circuit air-pressure braking system

High  pressure oil pump

ARK pump

Hydraulic motor

ARK motor

Reducer

PMB6.5sp, Italy

Water  supply system

Water  supply by air pressure (450L water tank), homemade sprinkler.

Air-condition

Shacman  special air condition

Engine

Model

WP10.336

Max. Power (hp)

336

Engine type

4  strokes, water cooling, turbo, EFI diesel engine

Fuel type

Diesel oil

Tank body parameter

Mixing volume(m3)

9, optional for 6-12m3

Feeding speed

More than or equal to 3m3/min

Unloading speed

More than or equal to 2m3/min

Discharge residue rate

Less than 0.5%


Q:What is the normal speed in the transportation of the concrete mixer
In the case of idle speed (engine speed of 600 r/min) generally feed mixing every 4 r/min, when discharging at around 6 r/min, the gas engine speed from 1500 to 2000 r/min when the hydraulic pump and motor mechanical efficiency is highest, feed mixing around 10 r/min, when discharging 12 to 14 r/min. Speed is adjustable, through adjust the driving torque of each point, can make the speed increase or decrease, when the stirring speed too fast will affect the service life of the hydraulic system, general stirring speed in the process of transportation for the 3 revolutions per minute.
Q:Does it affect the ease of mixing too long?
The site stirring, the quality is not easy to control, the site pollution is serious for the main reason, the construction committee has the file request, so all do not stir in the scene.
Q:How many cubic meters of concrete mixer transport vehicle
Dongfeng 140 concrete mixer truck, dongfeng 145 concrete mixer truck, dongfeng 153 concrete mixer truck, dongfeng hercules concrete mixer truck, dongfeng tianlong build concrete mixer truck concrete mixers, liberation, steyr, concrete mixer truck concrete mixer truck, hongyan, Europe man special concrete mixer truck concrete mixers and other projects.
Q:Why is the concrete mixer turning on the road?
Prevent concrete from being isolated and make concrete more uniform. In addition, the concrete is in a state of stagnation for a long time, and the vehicle shakes and the concrete will soon be compacted, and the pot will not move.
Q:What is the driving license for a concrete mixer truck?
Fees vary from anywhere from 2,500 to 3,500 Some places can be around 4,000 to 4500 The other thing is to get a certification, but the car on the site is generally unexamined.
Q:How did the concrete agitate the concrete
When pouring into the mixing building, the two sides of the car are equal to the stirring bracket, and the first time the mouth is made a mark, so that the next time it will be successful!
Q:How many cars do you have for a concrete tanker
See how much you pack 6 to 9 square and have more
Q:What are the three main parts of the concrete mixer car
The speed reducer, the pump radiator, is to make the mixing tank turn
Q:Is it possible to mix the concrete in a mixing truck for eight hours?
When the concrete is removed from the mixture, it is best not to exceed 150min according to the temperature. But now with the development of the additive technology, and high performance concrete initial setting time and perhaps even control to 13-15 hours (Shanghai world financial center base raft concrete). You can discriminate in this way. Concrete stirred 8 hours, not casual water, workability change is not very big, can use, but 1 can back, part of discharge, stir some higher than the another two grades of concrete, quick stir for a few minutes and pouring into the part or not is not very important part of the bearing. According to the admixture, add admixtures, whisk for 3-4min, and reduce the use of one or two grades. If you have added a lot of water to the site, there has been a significant change in the ease of use.
Q:How many years does the concrete agitator truck go away?
Depending on how you use it, it doesn't matter if you take care of it for more than a decade

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords