Concrete Pump Truck Mounted with China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Mounted with China
Product Details
Basic Info.
Model NO.:HB56
Type:Compacting Equipment
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Export Markets:Global
Additional Info.
Trademark:JUNYU
Packing:Nude
Standard:CE
Origin:Shanghai
HS Code:8705909090
Production Capacity:Hb56
Product Description
Travel | |||
Category | Item | Unit | Parameter |
Chassis | Model | FM440 | |
Manufacturer | VOLVO | ||
Max. speed | km/h | 90 | |
Max. gradeability | 38% | ||
Min. turning diameter | m | 27.4 | |
Brake distance | m | ≤10 | |
Wheelbase | mm | 1995+5205+1370+1450 | |
Tread (front/rear) | mm | 2028/1872 | |
Approach angle/departure angle | . | 18/11 | |
Min. clearance | mm | 270 | |
Tyre specification | 12.00R20 | ||
Engine | Model | D13 | |
Output power | kw/(r/min) | 324/1400~1800 | |
Max. torque | N.m/(r/min) | 2200/1050~1400 | |
Displacement | l | 12.8 | |
Emission Standard | Nation III GBIII | ||
Others | Dimension (Length×Width×Height) | mm | 14885×2500×3990 |
Total vehicle weight | kg | 49750 | |
Fuel tank capacity | l | 410 | |
Fuel consumption per 100km | l/100km | 50 | |
Pumping operation | |||
Pumping system | Theoretical output(high pressure/low pressure) | m3/h | 100/163 |
Concrete pumping pressure(high pressure/low pressure) | Mpa | 13/8 | |
Theoretical pumping times(high pressure/low pressure) | /min | 13/21 | |
Max. diameter of pumping concrete aggregate | 40 | ||
Feeding height | 1530 | ||
Placing boom | Pumping slump range | 12-23 | |
Reach height | 55.7 | ||
Reach depth | 44 | ||
Slewing radius | 51.7 | ||
Slewing angle | 364 | ||
1st boom stretch angle | 96 | ||
2nd boom stretch angle | 180 | ||
3rd boom stretch angle | 180 | ||
4th boom stretch angle | 180 | ||
5th boom stretch angle | 260 | ||
Outrigger span | Overall outrigger span | 11250±50 | |
Front outrigger transverse span | 11400±50 | ||
Rear outrigger transverse span | 11300±50 | ||
Others | Dosing type | S valve | |
Lubricating method | Automatic lubrication | ||
Controlling method | Manual/remote control | ||
Water tank capacity | 700 | ||
Max. pressure of water pump | 2 |
- Q: When the concrete pump in the transport of concrete before the pipeline should be what lubrication
- And then share a coup, tanker to a lot of time, the site to prepare some sugar, if the pouring time is too long, the general 9 square tank you put 1 kg of sugar can be used as a retarder
- Q: Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q: What is high and low pressure switching and hydraulic gear ratio on concrete pumps?
- Piston rod is not in contact with the load: the liquid to promote the rapid movement of cold, because the cylinder needs a lot of oil to the cylinder, then low-pressure large flow pump work.
- Q: Is it easy to use fine stone concrete pump?
- The fine stone concrete pump is a fine stone concrete transportation equipment specially developed for the warm construction and its construction characteristics
- Q: What is the maintenance method of concrete pump?
- 2) Before the operation should be checked to confirm the electrical equipment and instruments normal, the various parts of the switch button, the handle are in the correct position, the mechanical part of the fastening point of solid, reliable, chain and belt tightness to meet the requirements of the transmission parts of the normal operation.
- Q: What is the difference between a concrete day pump and a ground pump?
- Motor concrete pump current domestic brands: three one, in the joint, pump tiger, Cornelian, Chutian, Broadcom, good Seoul, heaven and earth heavy industry, the public together, Hong profit, Hainuo and so on.
- Q: What measures should be taken in the construction of the underground garage
- 2. In the garage top two beams below the increase in a large number of support column.
- Q: How to wash the concrete pump with a ball
- First in the pump tubing in the concrete residue washed 1-2 side, then put the ball into the feed port, add water to open the pump, the pump will be with the water through the pipeline, the pipe wall
- Q: What is the difference between Sanya Heavy Industry concrete electric drag pump and diesel fuel pump
- Sany Heavy-duty concrete transport towing pump, according to the power source in two categories, namely: electric drag pump and diesel trailer,
- Q: How much concrete can the pump pump pump for an hour?
- Construction speed in two ways: on the one hand is based on the pump master experience to effectively carry out construction operations.
Send your message to us
Concrete Pump Truck Mounted with China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords