KLB34-1000 Bored Pile Drilling Rig for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
KLB20-600 Bored Pile Drilling Rig for Sale
Product Features:
A Wide Choice Of Product: |
>>Our company is capable to manufacture various types of KL series drilling rigs. The max drilling depth could reach 20m to 34m.A wild range of products could be chosen for your practical needs. |
The column of the piling frame has two types, square and round. The former type applies back lift method. It is easily installed, safe and stable. The later type applies front lift method, the support rod will adjust itself when lifting the column. The column is higher, the drilling depth will go deeper. |
|
Higher Efficiency And Lower Consumption: |
>>The hydraulic system uses constant power variable design with low loss.The large flow, low failure rate, and high efficiency piston pump ensures the hydraulic components working well. |
|
high Reliability And Flexibility: |
>>The rotation system works with hydraulic flow. The rotating speed could be controlled to avoid impact. The failure rate is much reduced. The assistant hoist also uses hydraulic winch so the winding speed can be controlled at the operator’s will. Such design provides much convenience in the working process. |
|
Convenience In Dismantling, Transportation And Maintenance: |
>>With many years improvement and seeking for perfection, each part of the machine has well considered its convenience in dismantling, transportation and maintenance. The height and width of the largest part is designed within the range of transportatio lmits. |
|
Humanized Design: |
>>Much effort has been taken to increase the technical content on our products as well as humanized design. The machine is integrated with mechanical, electrical, hydraulic, and electronic devices. The appearance of the machine body, the comfort of the operator, the agility of the movements and so on are all well considered when designing the machine.Remote-control handle is optional due to the client's needs. |
|
Unique Design: |
>>After many years of experience in manufacturing the machine and analyzing feedbacks from our loyal clients, we made unique improvements in the easy-malfunction parts on the drilling rig: The bottom pillar of the column uses universal joint to enable the pole adjusted from left-right and front-back directions. The side support adjustment mechanism uses hydraulic motor instead of electrical motor which may affect the adjustment stroke or worm and gear which may shorten the life period. The supporting leg cylinder base uses large round box structure to avoid distortion at the working process. |
|
Multi-function: |
>>KL series is our new generation multi- function piling frame: with different power plant it can not only be used to do bored pile drilling or construct continuous wall by SMW method, but also do diesel hammer or hydraulic hammer pile driving. |
KLB34-1000 | ||
---|---|---|
Move method | Electro-hydraulic step | |
Max drilling depth | 34m | |
Max drilling diameter | φ1000 | |
Max output torque | 87KN·m | |
Rod rotated speed | 18r/min | |
Allowed lifting force | 800KN | |
Power for power head | 75KWX2 | |
Reductor of power head | ZZSH580 | |
Leader size | φ720X10 | |
Leader height | 39m | |
Leader oriented center distance | 600Xφ102 | |
Leader incline range | 5°front inclination 3°back inclination | |
Stroke | 2.0m | |
Climbing ability | <6° | |
Rotary | Rotary way | Rotary motor |
Rotary angle | ≤360° | |
Rotary speed | 0~0.3 | |
Main winch | Single pulling force | 8T |
Increasing speed | 1.8/2.2/2.6 | |
Motor power | 30KW | |
Assist winch | Single pulling force | 3T |
Increasing speed | 20m/min | |
Motor power | 13KW | |
Overall dimension(L*W) | 13m×6.2m | |
Total weight(T) | 93T |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
- Q: Invite friends together to buy a long spiral step of 30 meters of the pile driver, told me as long as the project profits are objective, you can package to 200W/, would like to ask the experts familiar with the bank bosses according to your local market if the annual package is how much money, how much is the monthly package, or by how many meters.. Thank you。。 Thank you
- The drilling system comprises a power head and the output shaft of the power drill head and screw drill is hollow, with long spiral hole, drill pipe through the center of the concrete [or] of the mud pumping concrete CFG pile construction, which can be a drilling machine once completed, can also be used to dry hole, grouting altering tool can also be taken deep mixing a variety of Engineering construction.
- Q: I have learned how to drive a pile driver. I want to know what the salary is. How can I find a job in the future?
- Into the company, there will be no worry about work, such as the construction of the railway these big projects, you need such talent, but it will be very hard, and wages than other drivers of high wages
- Q: What is an impact pile driver?
- You mean the kind of pile driver that used to use high explosive diesel engines to produce impact?The principle is like using the percussion hammer nails, using a hammer impact in the nail head will generate the nail.It's very seldom used now.
- Q: Excavators, pile drivers, how to operate? The master knows,
- Simple, first stop the car, push the right handle forward (big arm down), push the left hand lever (small arm out), handle the right (release bucket), do the above three actions at the same time until the bucket touches the ground. Then, the left handle back down and right arm handle down the left arm when receiving bucket, bucket is full. Then the big arm, left or right rotation and small rotating arm bucket on the line! Got it?! You can also question me!
- Q: What is a pile driver used for?
- As the name suggests, of course, piling is used, such as building houses, foundations, bridges, foundations and so on.
- Q: How deep can a pile driver work?
- The deepest foundation piling machine can hit 20 meters, five or six floors are generally enough, in a special customer service Huilong piling machine three insurance contract, you can personally to visit the company, can also visit the construction site.
- Q: What should I pay attention to when purchasing a hydraulic pile driver?
- Landlord, you have a wide range of this, piling machine applications are many, and there are many types of models
- Q: Track excavator truck model, preferably material, and some are sent to the mailbox thank you very much
- You can get them with the manufacturers who produce them. They usually do. Not really. Just find someone to look at the equipment and draw one.
- Q: Is the prestressed pipe pile driven by a diesel pile driver or a static pile driver?
- Hydraulic press-in is a jacked pile. Hydraulic hammer is a hydraulic pile hammer, and also a kind of impact pile. The single acting hydraulic hammer is only the rising driving mode, which is hydraulic and then released. The double acting hydraulic hammer also uses hydraulic acceleration when falling down. The speed is fast, and the lighter hammer core can be used. The impact force is larger than the ordinary one, and the steel pile is usually used
- Q: Why should the pile foundation be excavated after the pile driving?
- The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.
Send your message to us
KLB34-1000 Bored Pile Drilling Rig for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords