• KLB34-1000 Bored Pile Drilling Rig for Sale System 1
  • KLB34-1000 Bored Pile Drilling Rig for Sale System 2
  • KLB34-1000 Bored Pile Drilling Rig for Sale System 3
  • KLB34-1000 Bored Pile Drilling Rig for Sale System 4
  • KLB34-1000 Bored Pile Drilling Rig for Sale System 5
  • KLB34-1000 Bored Pile Drilling Rig for Sale System 6
KLB34-1000 Bored Pile Drilling Rig for Sale

KLB34-1000 Bored Pile Drilling Rig for Sale

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

KLB20-600 Bored Pile Drilling Rig for Sale

KLB34-1000 Bored Pile Drilling Rig for Sale

Product Features:

 

A Wide Choice Of Product:

>>Our company is capable to manufacture   various types of KL series drilling rigs. The max drilling depth could reach   20m to 34m.A wild range of products could be chosen for your practical needs.
Due to the different moving methods, KL series drilling rig can be divided   into two types: step walking type and crawler type. The step walking type has   an advantage of cheaper price, flexibility in various conditions . The   crawler type has advantages of mobility, flexibility in aiming at the spot,   efficiency for construction.


The column of the piling frame has two types, square   and round. The former type applies back lift method. It is easily installed,   safe and stable. The later type applies front lift method, the support rod   will adjust itself when lifting the column. The column is higher, the   drilling depth will go deeper.
  Each model can be equipped with drilling rods of different diameters   according to practical needs. Drill blades and the barrel use high strength   steel alloy with high abrasion and hardness quality.

 


Higher Efficiency And Lower Consumption:

>>The hydraulic system uses constant power   variable design with low loss.The large flow, low failure rate, and high   efficiency piston pump ensures the hydraulic components working well.


  
 


high Reliability And Flexibility:

>>The rotation system works with hydraulic   flow. The rotating speed could be controlled to avoid impact. The failure   rate is much reduced. The assistant hoist also uses hydraulic winch so the   winding speed can be controlled at the operator’s will. Such design provides   much convenience in the working process.


  
 


Convenience In Dismantling, Transportation And   Maintenance:

>>With many years   improvement and seeking for perfection, each part of the machine has well   considered its convenience in dismantling, transportation and maintenance.   The height and width of the largest part is designed within the range of   transportatio lmits.


  
 



Humanized Design:

>>Much effort has   been taken to increase the technical content on our products as well as   humanized design. The machine is integrated with mechanical, electrical,   hydraulic, and electronic devices. The appearance of the machine body, the   comfort of the operator, the agility of the movements and so on are all well   considered when designing the machine.Remote-control handle is optional due   to the client's needs.


  
 



Unique Design:

>>After many years   of experience in manufacturing the machine and analyzing feedbacks from our   loyal clients, we made unique improvements in the easy-malfunction parts on   the drilling rig: The bottom pillar of the column uses universal joint to   enable the pole adjusted from left-right and front-back directions. The side   support adjustment mechanism uses hydraulic motor instead of electrical motor   which may affect the adjustment stroke or worm and gear which may shorten the   life period. The supporting leg cylinder base uses large round box structure   to avoid distortion at the working process.


  
 


Multi-function:

>>KL series is our   new generation multi- function piling frame: with different power plant it   can not only be used to do bored pile drilling or construct continuous wall   by SMW method, but also do diesel hammer or hydraulic hammer pile driving.

 KLB34-1000
Move methodElectro-hydraulic step
Max drilling depth34m
Max drilling diameterφ1000
Max output torque87KN·m
Rod rotated speed18r/min
Allowed lifting force800KN
Power for power head75KWX2
Reductor of power headZZSH580
Leader sizeφ720X10
Leader height39m
Leader oriented center distance600Xφ102
Leader incline range5°front inclination
3°back inclination
Stroke2.0m
Climbing ability<6°
RotaryRotary wayRotary motor
Rotary angle≤360°
Rotary speed0~0.3
Main winchSingle pulling force8T
Increasing speed1.8/2.2/2.6
Motor power30KW
Assist winchSingle pulling force3T
Increasing speed20m/min
Motor power13KW
Overall dimension(L*W)13m×6.2m
Total weight(T)93T


FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.



Q: Invite friends together to buy a long spiral step of 30 meters of the pile driver, told me as long as the project profits are objective, you can package to 200W/, would like to ask the experts familiar with the bank bosses according to your local market if the annual package is how much money, how much is the monthly package, or by how many meters.. Thank you。。 Thank you
The drilling system comprises a power head and the output shaft of the power drill head and screw drill is hollow, with long spiral hole, drill pipe through the center of the concrete [or] of the mud pumping concrete CFG pile construction, which can be a drilling machine once completed, can also be used to dry hole, grouting altering tool can also be taken deep mixing a variety of Engineering construction.
Q: I have learned how to drive a pile driver. I want to know what the salary is. How can I find a job in the future?
Into the company, there will be no worry about work, such as the construction of the railway these big projects, you need such talent, but it will be very hard, and wages than other drivers of high wages
Q: What is an impact pile driver?
You mean the kind of pile driver that used to use high explosive diesel engines to produce impact?The principle is like using the percussion hammer nails, using a hammer impact in the nail head will generate the nail.It's very seldom used now.
Q: Excavators, pile drivers, how to operate? The master knows,
Simple, first stop the car, push the right handle forward (big arm down), push the left hand lever (small arm out), handle the right (release bucket), do the above three actions at the same time until the bucket touches the ground. Then, the left handle back down and right arm handle down the left arm when receiving bucket, bucket is full. Then the big arm, left or right rotation and small rotating arm bucket on the line! Got it?! You can also question me!
Q: What is a pile driver used for?
As the name suggests, of course, piling is used, such as building houses, foundations, bridges, foundations and so on.
Q: How deep can a pile driver work?
The deepest foundation piling machine can hit 20 meters, five or six floors are generally enough, in a special customer service Huilong piling machine three insurance contract, you can personally to visit the company, can also visit the construction site.
Q: What should I pay attention to when purchasing a hydraulic pile driver?
Landlord, you have a wide range of this, piling machine applications are many, and there are many types of models
Q: Track excavator truck model, preferably material, and some are sent to the mailbox thank you very much
You can get them with the manufacturers who produce them. They usually do. Not really. Just find someone to look at the equipment and draw one.
Q: Is the prestressed pipe pile driven by a diesel pile driver or a static pile driver?
Hydraulic press-in is a jacked pile. Hydraulic hammer is a hydraulic pile hammer, and also a kind of impact pile. The single acting hydraulic hammer is only the rising driving mode, which is hydraulic and then released. The double acting hydraulic hammer also uses hydraulic acceleration when falling down. The speed is fast, and the lighter hammer core can be used. The impact force is larger than the ordinary one, and the steel pile is usually used
Q: Why should the pile foundation be excavated after the pile driving?
The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords