• Yuchai YC6T (320-550kW) Series Engines for Generators System 1
Yuchai YC6T (320-550kW) Series Engines for Generators

Yuchai YC6T (320-550kW) Series Engines for Generators

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Yuchai YC6T (320-550kW) Series Engines for Generators

· 4-valve and advanced injector provide better combustion

· Yuchai sealing technology in piston ring and valve oil seal, giving protection in the toughest conditions and improving lube oil consumption

· High fuel efficiency and low maintenance cost

· Operator and nature friendly with low noise and vibration

· Reliable cold starts at -25and applicable altitude at 2500m without derating

· Good transient response and steady-state performance

YC6T TECHNICAL SPECIFICATIONS

Model

YC6T550L-D20

YC6T600L-D20

YC6T660L-D20

YC6T660L-D21

YC6T700L-D20

YC6T760L-D20

YC6TB830L-D20

Configuration

Vertical, in-line, 6-cylinder, Water-cooled, 4-stroke

Aspiration

Turbocharged and air to air inter-cooled

Bore ×Stroke                               (mm)

145 ×165

152 ×180

Displacement                                  (L)

16.35

19.59

Compression ration

15:1

Prime power/Speed            (kW/r/min)

368/1500

401/1500

441/1500

441/1800

468/1500

505/1500

550/1500

Standby power/Speed        (kW/r/min)

405/1500

441/1500

485/1500

485/1800

515/1500

556/1500

605/1500

Fuel consumption                  g/(kW·h)

≤195

Oil capacity                                     (L)

52

Oil consumption                    g/(kW·h)

≤0.5

Starting method

Electric

Noise Lw                                    dB(A)

≤102

Emission

T2

Applicable altitude                        (m)

≤2500

Engine dimension (L×W×H)            (mm)

1836 ×1062 ×1600

1836 ×1062 ×1620

Dry weight                                    (kg)

1980


Q: i mean, it seems that every time someone makes a grammar or spelling mistake someone always has to point it out like....quot;hey idiot, go back to school and learn to write english, you spelled .....platonic wrong, you are a blitherous counteractive narcolistic bothariumquot;they point out others errors and then go and try to use a bunch of....quot;bigquot; words...and try to sound all smart and technical....for example...i posted a video of a quot;excavatorquot; knocking down a house....i called it a bulldozer....someone replied to me....quot;hey dumbass, its an excavator, not a bulldozer, next time do researchquot;why is it necessary for people to criticize and be so technical all the time...it's not like we were having an argument and he had reason to respond to my video the way he did....do these people just have a low self esteem an d no life, so they go online and make fun of...the semi normal - normal people....?pleese dont correct my grammer miztaks...or da speling ones
im wit you,or should i say with you. ha ha kidding.i guess people think they are so smart cause they are on line or computer, screw them , just ride on. enjoy life and laugh at them next time, tell themhey eggbert settle down! and to quit acting like you know something cause you dont.
Q: After digging a 5x5x5 hole in my back yard, the excavators loaded up and took off. They claim that they quot;hit hard rock at 5 ft.quot;. I went in the excavated hole and found nothing different in the bottom, than the first 5 ft. I did find some small river rocks about the size of my shoe, but the backhoe they had in here could easily dig that up. Now they want an additional $750 for 12 inches! They needed to dig down to 6 Ft for a 5 ft pool. I understand this.Walks like a scam, smells like a scam, and looks like a scam. What are some opinions on this?
ask to see the rock in hole .... it will be on top ..... and it means they will being in jack hammers ...i used to put in in ground pools is s. Florida .... if we hit a large solid rock or the coral shelf ... we would hammer or drill and blast depending on size of pool . don't worry for your situation they will NOT blast ...
Q: Creatures Air Elemental X2 Surrakar Banisher X1Wall of Frost X1 Drake Umbra X1 Plated Seastrider X1 Halimar Excavator X1 Cathartic Adept X1 Windrider Eel X1 Phantom Warrior X1 Mnemonic Wall X1 Wind Drake X1 Merfolk Looter X1 Caller of Gales X1 Kraken Hatchling X1 Jwari Scuttler X1 Snapping Drake X1 Serra Angel X2 Stormfront Pegasus X1 Leonin Arbiter X1 Platinum Angel X1 Linvala, Keeper of silence X1 White Knight X1 Blinding Mage X1 Soul Warden X1 Archon of Redemptiom X1 Lone Missionary X1 Goldenglow Moth X1 Perimeter Captain X1 Artifacts Couriers Capsule X1Marble Chalice X1Kitesail X1Grindclock X1Sorcery/Enchantments Pacifism X2 See Beyond X1 Cancel X2Essence Scatter X2 Diminish X1 Tome Scour X1 Telepathy X1 Sleep X1 Mind Control X1Unsummon X1 Divination X1Summoners Bane X1Day Of Judgment X1Soul Parry X1Dispense X1Fulgent Distraction X1Guardian Zendikon X1 Safe Passage X1Repel the Darkness X1 Lands Terramorphic Expanse X3 Island X10 Plains X10
i would run atleast one more doj, put in a couple (even a place set)of O ring add another terramorphic, and maybe seachrome coast or other dual lands. i would take out tome scour. it seems a common thing you are going for is control. i would stick to that and take out the mill that you have, as you don't have all that much. it has a good start to it, but the mill def. doesn't work, you need more place sets, and more dual lands i give it 6/10. still needs work but on its way :)
Q: What are the main parts of the excavator structure?
The common excavator structure includes power device, working device, slewing mechanism, control mechanism, transmission mechanism, walking mechanism and auxiliary facilities, etc.. These are the theoretical basis, I have learned in Henan, Zhumadian, mountains and rivers engineering machinery school! This school pays more attention to theoretical study! Lay a solid foundation for upgrading the technology!
Q: the other owner has occupied the property up until june of 2012, then he went to prison his half he has a loan out of 152,000 dollars. We have occupied the house since he went to prison paying all the bills but he has not made payments on his loan, or payed the taxes as promised. when he went to prison he signed over all assets he has excavator's and log trucks the house is worth over 425,000 and he owes at least 80,000 grand in contract with us from payments we previously made.? we were served with a summons from the bank. Does Adverse possesion apply?
You'll have to pay the loans because they used your house as collateral. Pay or lose the house. You can sue the other owner when he gets out of prison.
Q: the post are very rustic almost like a tree in half do they have to have concrete around like normal fencing because the posts are morticed for the rails i have a 3 ton excavator with a small bucket any advice from an expert would be highly appreciated
Cheap foreign labor? We never put concrete in our posts, but the ground's pretty hard here.
Q: Excavators are hard at work at freezing sites?Why my excavators are hard at work at freezing sites? what's the problem?
Two reasons. One, the hydraulic oil gets thicker when it's cold, and it would help to warm up the excavator for at least 20 - 30 minutes before starting to work. And two, frozen ground is harder to dig in. If warming up the excavator doesn't help, you may want to check if the fluid in it is too thick. To do this, look at what the can says that you have been putting in it, and then look to see if there is a sticker somewhere on the machine to see what the manufacturer recommends.
Q: I was thinking about digging a couple pretty simple hole in the backyard for compost and dumping grass in. The only problem is that I am thirteen and my Dad doesnt' want to do do the digging. I've had past experience doing stuff with backhoes and even those big excavators. Could my Dad legally rent one and have me do the digging, or do I need to teach him how to drive it? :)
Ya sure I'm 13 and I do that stuff I have even drove his 18 wheeler into the docking station but just be sure your dad don't mention to the rebuttal place that you will be doing that stuff
Q: I want to build a garage around 100-150 ft away from my house that has a 200 amp service. What size wire will I need to have a 100 amp sub-panel in my garage. Can it be direct burial or should I run conduit?
Sorry, I'd like to help you but your question is too confusing. The way I read it is, the sub panel main disconnect is near or at the service entrance, which is 50 feet away. That's fine. You want to put in a transfer switch so you can transfer the power from the service to a generator to feed the panel. Nothing wrong with that, so long as you put the transfer switch between the panel disconnect and the panel. Distance does not enter the picture. I hope that helps.
Q: What are the specifications of excavators?
Standard bucket capacity m3 * 100;WL wheeled mechanical single bucket excavator;Standard bucket capacity m3 * 100;WLD wheeled electric single bucket excavator;WLY tire hydraulic single bucket excavator.Its specific method of expression for the four sets of symbols:W: excavators;Y: different types of codes;60: bucket capacity;A: structural improvement code.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords