• Yuchai YC6J (120kW) Series Engines for Generators System 1
Yuchai YC6J (120kW) Series Engines for Generators

Yuchai YC6J (120kW) Series Engines for Generators

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Yuchai YC6J (120kW) Series Engines for Generators

· ω-type combustion chamber technology reduces fuel consumption

· Yuchai sealing technology in piston ring and valve oil seal reduces the lube oil consumption

· Yuchai sealing technology in piston ring and valve oil seal reduces the lube oil consumption

· Operator and nature friendly with low noise and vibration

· High fuel efficiency and low maintenance cost

· Reliable cold starts at -25and applicable altitude at 2500m without derating

· Major overhaul period is more than 12000 hours

YC6J

TECHNICAL SPECIFICATIONS

Model

YC6J210L-D30

Configuration

Vertical, in-line, 6-cylinder, Water-cooled, 4-stroke

Aspiration

Turbocharged and air to air inter-cooled

Bore ×Stroke                                                  (mm)

105 ×125

Displacement                                                     (L)

6.49

Compression ration

16.5:1

Prime power/Speed                              (kW/r/min)

139/1500

Standby power/Speed                          (kW/r/min)

153/1500

Fuel consumption                                    g/(kW·h)

≤194

Oil capacity                                                        (L)

14-17

Oil consumption                                      g/(kW·h)

≤1.2

Starting method

Electric

Noise Lw                                                       dB(A)

≤98

Emission

T3

Applicable altitude                                           (m)

≤2500

Engine dimension (L×W×H)                          (mm)

1377 ×805 ×1112

Dry weight                                                      (kg)

650



Q:I have dreams about bridges. Somebody tried to transport a excavator across a stone bridge in my dream and the bridge collapsed. I need to learn to dream walk to put it back together. It is VERY important to the safety of the United States. It has something to do with the plates of Joseph Smith so any shamans who can show me how to dream walk would be appreciated, thank you.
sure! I enjoy that always. And the goals which come actual, are most likely dreamt years in the past, and normally while i used to be wakeful. It would even be recommendation, that did not make experience on the time. Like, as soon as, I used to be sitting in a automobile and it got here to my brain Remember that during Bades?en(a pool neighborhood, do not pass there most likely) if you are sitting at THIS factor, there is 2 approaches to return there. You will pick the incorrect. two years later, I went to the pool, having forgotten approximately the dream. And I needed to uncover my household once more, however I could not. Then I remembered, I'd selected the incorrect approach. Really creepy.
Q:If I met a woman who ran an excavator at a precious metals open pit mine, would she be a gold digger?
LMAO... Without a doubt a gold digger.
Q:Attentions of excavator operation
Three. Travel on soft groundExcavators in the swamp, flood and other soft ground work, should first use the bucket to try whether the ground can withstand the weight of excavators. If you forget the process, there may be serious consequences unless you are driving an amphibious excavator. Although the excavator is tracked design, contact the ground area is large, but the excavator into the mud, can not move events also occur! Just note that this can be avoided. In the swamp, flood and other soft ground work, to avoid excavators trapped, should pay attention to these: 1, first with the bucket test. 2, do not stay long in the same place. 3, go straight, turn less.Wetland excavatorIn case the excavator gets stuck in the mud, don't worry. Never try to climb out of a climbing system. That will only get you deeper and deeper. There are many ways to save. 1, if it's not deep enough, try to hollow out the two tracks. 2, if it is not, on the first try, how deep mud, if not very deep, directly to the front of the silt layer, for their own way, slowly toward the shore near the hard ground. 3, if it is infinitely deep silt, can rent a few piece of iron or board, sideways pressure to the track below, you can easily out.Four, vision blind areaThe driver's cab is on the left, the middle of the passive arm blocks the view, so there is a large blind spot on the right, especially in the rear of the right. Many excavator accidents are caused by falling or dying of the right side of the tail! So in the not very wide field work, try to let the excavator on the left, the right to set aside more space.Excavator rearview mirrorRearview mirror in the excavator is a very fragile things, often in work or transport in the touch off, many drivers will feel touched, it is not important, it is not in time to replace the new rear-view mirror. In fact, the rearview mirror is very important in excavators, especially on the right side. Accidents are often due to a lack of safety awareness!
Q:What brand is excavator WORLD?
Jiangsu city in Zhenjiang Province, the heavy industry (China) Co. Ltd. was founded in 2007, is China's key investment group strategic industry in recent years. The project total investment 10 billion yuan, covers an area of 1500 acres, the company has a large CNC boring and milling machining center, CNC horizontal boring and milling machine, Longmen double IGM welding robot, CNC vertical machining centers and CNC flame cutting machine and other advanced imported equipment, the ability of manufacturing industry occupies the leading position.
Q:I have two mechanics working on two Isuzu E120 engine (one spare) to be fitted onto Hitachi EX400 excavator. Here's the problem, both of them gave me two different firing order.Mechanic A: 1-5-6-3-2-4Mechanic B: 1-4-2-6-3-5I think i just realized something ... instead of clockwise, can it turn anti clockwise? because the engine is designed to go anticlockwise the numbers would make sense now.
If it's a 3.1 or 3.2 V6, order should be 123456, where #1 is 1st cylinder on the left when standing in front of engine.
Q:excavator KOMATSU (DEMAG) H241 is excessive consumption of fuel ,what's the renson ? I just change the bucket lip .
Umm, because it's an excavator.
Q:I'm old enough for either but I only have money at the moment for one.Which would offer the best investment in terms of finding work?Thanks.
A class1 hgv will gain you employment faster than a digger licence, ive driven artics for 18 years and am considerimg a move to constructiin for a new challenge, good luck on the road
Q:What are some bad names I can call my guy friend we are calling each other likes hoes and crap what are some good names to call him remember were joking
call him tic tac lol
Q:I don't see what the difference is between the two of them.
Track Hoe Excavator
Q:What does it mean to walk an excavator and how do u do it?
re-ask the question and put it into some context. I'm a builder and I have no idea what you're talking about.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords