• Yuchai YC6G (150-160kW) Series Engines for Generators System 1
Yuchai YC6G (150-160kW) Series Engines for Generators

Yuchai YC6G (150-160kW) Series Engines for Generators

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Yuchai YC6G (150-160kW) Series Engines for Generators

· P fuel injection pump and P injector improve combustion and fuel consumption

· Yuchai sealing technology in piston ring and valve oil seal reduces the lube oil consumption

· High fuel efficiency and low maintenance cost

· Reliable cold starts at -25and applicable altitude at 2500m without derating

· Major overhaul period is more than 12000 hours

YC6G

TECHNICAL SPECIFICATIONS

Model

YC6G245L-D20

Configuration

Vertical, in-line, 6-cylinder, Water-cooled, 4-stroke

Aspiration

Turbocharged and air to air inter-cooled

Bore ×Stroke                                        (mm)

112 ×132

Displacement                                          (L)

7.8

Compression ration

16.8:1

Prime power/Speed                     (kW/r/min)

165/1500

Standby power/Speed                 (kW/r/min)

181.5/1500

Fuel consumption                           g/(kW·h)

≤195

Oil capacity                                              (L)

22-25

Oil consumption                             g/(kW·h)

≤1.2

Starting method

Electric

Noise Lw                                              dB(A)

≤98

Emission

T2

Applicable altitude                                 (m)

≤2500

Engine dimension (L×W×H)                 (mm)

1480 ×850 ×1175

Dry weight                                              (kg)

720



Q:I am buying a home that has a large shed in the back. The loan is FHA and the appraiser requires it be torn down or repaired. This is an old shed close to 100 years old and was built with all 2x4s with many rotting pieces so fixing it would cost the same as rebuilding a new one. The shed is approx 15x24 in an L shape. I'm working with a contractor for the other repairs and he quoted me at $7,500 for a full demo, I said leave the floors and he brought it down to $5,500. This seems like a rather large amount especially looking around online I was expecting 2-3k at most. Is his quote realistic? Im under a deadline so I had him write it up but I most likely will do it myself or find someone with a excavator to come in and just crush it.
Cheaper to rent a mini bulldozer and drive it thru yourself Is the contractor also charging for waste removal in that cost ? Then it might be reasonable Hard to say without knowing your city. You could call your local dump and see what they charge for construction debris It would be per ton and if there is a slab of concrete under the structure then costs might be reasonable I would call other contractors for estimates good luck Lr
Q:If Jesus was crucified on upright stake, then why does John 20:25 talk about 'nails' instead of a single nail?
as quickly as we see a tree we call it a tree,as quickly as we see a pole we call it a pole.whilst a sacrifice replaced into presented up(as interior the case of Issac which all of us understand forshadowed Jesus )Issac carried the wood for the burnt offering.Are we to anticipate that he carried a pole or a tree?have been the apostles who known because it a tree incorrect and it replaced into certainly a pole? have been people who known because it a stake incorrect? Are they in line with probability all perfect? How can this be? could desire to some be conversing some stake that Jesus carried for the time of the streets and it replaced into the bypass beam?Then the crossbeam replaced into hoisted up and aflixed to the tree that replaced into already interior the floor?subsequently there's a stake to which his palms may well be nailed and palms tied giving the physique help and his ft nailed to the tree.this additionally would be in unity with the bible account the place he says to Thomas to place his palms interior the print of the NAILS(plural) that have been in his palms .additionally it would make a probability the conversations he had and words he spoke together as being tortured because of the fact if it have been any opposite direction how might he improve his chest up for breath to speak if his physique weren't sopported in this way? If his palms have been over his head it would be impossible to breath in this form of place to speak and all of us understand that he did communicate.i think of it quite is probably that there have been trees the place he replaced into sacrificed and that the apostles knew what they have been conversing approximately and that it extremely is all one harmonious concept basically from diverse perspectives.The stake replaced into the crossbeam and the tree replaced into the area that replaced into interior the floor.
Q:i have experience running heavy equipment but not a excavator.any help is greatly needed.trying to impress new boss.
Like all the other machinery, it takes practice. If you have experience on other machines, you should pick it up quickly. Try to find someone to let you practice on it for a couple of hours.
Q:What are some of the pros and cons of each? Im not exactly sure, but id assume that there is a lot of good and bad in both. I am selling my backhoe and plan on buying one or the other, but am leaning towars the gradall since i don't need to trailer it. What do you think?
too many things you can not do with a gradall . if you are good with an excavator you can do just about any job that involves dirt .you can also get into places with an excavator that you can not with a gradall
Q:We can't seem to find anywhere to get a gas cap and an oil dip stick for our International Harvester 30 excavator. If anyone knows where I can find these, please let me know. Thanks
I would recommend the Case IH dealership.
Q:I am failing math and I need help? Solve this equation:The city of Rubberville plans to dig a rectangular landfill. The landfill will have a base with dimensions 700 feet by 200 feet and a depth of 85 feet.A.)An excavator was hired to dig the hole for the landfill. How many cubic yards of dirt will he have to haul away?
l=700 feet=233.33yards b=200 feet=66.67yards h=85 feet=28.33yards Dirt removed = volume of the landfill. = l*b*h =233.33yards*66.67yards*28.33yards =440704.627463 cubic yard
Q:oil filter - fuel filter - hydraulic filter - air cleanerFree DownloadPdf or xls filesExcavatorDozerReach Stackeretc.
Call your local NAPA store. They LOVE to come out and organize your filters for you. Especially when they think they're going to be supplying said filters. They do it for free and they give you a cross reference book, too.
Q:I have a John Deere 892D excavator serial number 892dl005765 and need a long block complete ready to go.
Get okorder can give you all you want to know.
Q:please help
Open-pit mining (as opposed to underground mining) has several advantages:- 1) Low cost of recovery - large trucks can enter the mine, get filled up with rock from a large excavator and drive away to the processing plant. 2) No need to leave stability pillars, necessary to hold up underground mine workings but which may contain valuable ore that is effectively lost to the mining company. 3) Ease of beneficiation - surface mines are usually composed of materials (oxides in the case of metalliferous mines) that are easier to handle and easier to treat in order to recover their marketable product as a result of being so close to surface. 4) Safer environment - so much less problem of rock falls, hanging wall collapse resulting in a lower injury rate than in underground mine.
Q:what is the price of a 450 hitachi excavator?
Try okorder /

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords